Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.6 CrAdmitted-Finance 3 HATHROI MARKET AJMER ROAD JAIPUR 302001 | JAIPUR | JAIPUR | RAJASTHAN | 302001 | L1 | Admitted-Finance | ||
| 2 | L2₹26.3 Cr+₹63.6 L (2.48%)Admitted-Finance A 5 GOLIMAR GARDAN NEAR SAHAKAR BHAWAN SAHAKAR MARG JAIPUR | JAIPUR | JAIPUR | RAJASTHAN | L2 | Admitted-Finance |
Tender Value
₹25.0 Cr
EMD Value
₹50.1 L
Closing Date
5 Jun 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Chief Engineer, P.W.D. Zone - Tonk
Additional Chief Engineer, P.W.D. Zone - Tonk
Widening and Strengthening of Jhirana - Hameerpur - Lamba - Todarasingh - Bhasu - Datop - Dabaddumba upto District Border at Km 20/300 to 30/0 and 37/0 to 50/0 in District Tonk
2023_CEPWD_331329_8
NIT 02/2023-24 PWD ZONE TONK
Open Tender
Civil Works
Percentage
300 days
Tonk
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Through online EGras Challan office ID 23029
₹50.1 L
Yes
Additional Chief Engineer, P.W.D. Zone - Tonk
14 Jun 2023
25 Apr 2023
6 Jun 2023
25 Apr 2023
5 Jun 2023
25 Apr 2023
11 May 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part "1" Ch. 20/300 to 26/0 | |||||
| 2PART 'A' : ROAD WORK | |||||
| 3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MoRTH specification clause 201 By mechanical Means. In area of light jungle | - | P.Hect. | 10,282 | - |
| 4 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per MoRTH specification clause 202. By Mechanical Means : Bituminous courses | - | P.Cum | 184 | - |
| 5 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per MoRTH specification clause 202. | - | P.Cum | 622 | - |
| 6 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per MoRTH specification clause 202. By Mechanical Means : Granular courses | - | P.Cum | 168 | - |
| 7 | Scarifying the existing bituminous road surface to a depth of 50 mm by mechanical means and disposal of scarified material within all lifts and lead up to 1000 meters as per MoRTH specification Clause No. 305.4.3. | - | P.Sqm | 6 | - |
| 8 | Earth work in excavation, including stacking/disposal of surplus material with all lifts and lead up to 50 meters, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305] Mechanically by power shovel, including mechanical loading and carriage up to 50m. | - | P.Cum | 61 | - |
| 9 | Compaction of original ground with maximum of six passes of 8-10 tonnes power roller including filling depression occurring during rolling [MoRTH Specification : Clause 305.3.4] | - | P.Sqm | 3.73 | - |
| 10 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted by vibratory roller 8-10 Tonne to meet requirement of Table 300-2 as per MoRTH specification Clause No. 305. | - | P.Cum | 130 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.45 MB
Tendernotice_2.pdf
PDF • 4.17 MB
Tendernotice_3.pdf
PDF • 9.66 MB
BOQ_589287.xls
BOQ • 0.42 MB
Postl_bid_bhasu.pdf
Tender Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .