Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
10 Jul 2026, 4:00 pmDue today
XEN REW kathua
XEN REW kathua
Const. of Ground with B/Wall MS Chapparu Pyt Duggan Block Duggan
2026_RDPR_314587_1
e-NIT No.76/REW/K of 2026-27 Dated 04/07/2026
Open Tender
Civil Works
90 days
Duggan
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹9,800
4 Jul 2026
4 Jul 2026
11 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed | - | - | - | - |
| 2 | ALL kind of soil | 163.89 | cum | 479.3 | ₹78,552.48 |
| 3 | Providing and laying dry stone aggregate 40mm N/Size . | 3.83 | cum | 2,885.91 | ₹11,053.04 |
| 4 | P/L Cement Concrete in 1:3:6 mix with 20mm nominal size stone agg. 20 % boulders. | 10.98 | cum | 4,774.46 | ₹52,423.57 |
| 5 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | 572.99 | cum | 138.2 | ₹79,187.22 |
| 6 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete Made of G.I. wire of dia 4 mm | 45.75 | SQM | 809.9 | ₹37,052.92 |
| 7 | Form work of Wall | 36.6 | SQM | 286.35 | ₹10,480.41 |
| 8 | R.R Stone massonary laid in (1:6 ) mix with hard stone from nallah | 27 | cum | 5,402.9 | ₹1,45,878.3 |
| 9 | Carriage/consumption of Material | - | - | - | - |
| 10 | Sand and bagri with an avg lead of 70 km by M.T and 0.2km by A.T | 29.9 | cum | 1,293.68 | ₹38,681.03 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.02 MB
BOQ_1018627.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid