| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 LAccepted-AOC | ₹3.9 L | 1 | Accepted-AOC AOC awarded |
| 2 | 2₹4.1 LRejected-AOC | ₹4.1 L | 2 | Rejected-AOC not awarded due to not being lowest |
| 3 | 3₹5.2 LRejected-AOC | ₹5.2 L | 3 | Rejected-AOC not awarded due to not being lowest |
| Sl No | Description | Qty | Unit | THE MAHANDIPUR BALAJI LABOUR AND CONSTRUCTION SOCIETY LIMITED L1 | The Jai Durga co-op Labour and Construction Society Ltd. L2 | THE SURAJ COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD KKR L3 |
|---|---|---|---|---|---|---|
| 1.00 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 38 | Sqm | 4,294 ₹4,294 | 3,800 ₹3,800 | 3,610 ₹3,610 |
| 2.00 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 9.2 | Sqm | 1,269.6 ₹1,269.6 | 1,104 ₹1,104 | 1,058 ₹1,058 |
| 3.00 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] | 189.21 | Sqm | 5,865.51 ₹5,865.51 | 5,108.67 ₹5,108.67 | 6,622.35 ₹6,622.35 |
| 4.00 | [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] | 19.09 | Sqm | 1,049.95 ₹1,049.95 | 1,489.02 ₹1,489.02 | 1,889.91 ₹1,889.91 |
| 5.00 | [13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate] | 1,621.17 | Kg. | 1,37,799.45 ₹1,37,799.45 | 1,49,017.95 ₹1,49,017.95 | 1,92,919.23 ₹1,92,919.23 |
| 6.00 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 39.4 | cum | 3,073.2 ₹3,073.2 | 2,704.81 ₹2,704.81 | 3,467.2 ₹3,467.2 |
| 7.00 | [5.33]Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. [Through Rate] | 500 | Kg. | 1,000 ₹1,000 | 900 ₹900 | 1,000 ₹1,000 |
| 8.00 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate] | 2.38 | cum | 1,392.3 ₹1,392.3 | 1,249.98 ₹1,249.98 | 1,577.94 ₹1,577.94 |
| 9.00 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 18.63 | cum | 55,890 ₹55,890 | 56,819.64 ₹56,819.64 | 73,383.57 ₹73,383.57 |
| 10.00 | [6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate] | 42.51 | cum | 76,518 ₹76,518 | 81,899.77 ₹81,899.77 | 1,05,594.84 ₹1,05,594.84 |
Tender Value
₹4.6 L
EMD Value
₹9,300
Closing Date
17 Feb 2026, 5:00 pmClosed
Sh Pankaj Sharma
Kurukshetra University
Extension of Car Parking Shed of Dr. B.R. Ambedkar Study Centre Deptt. at K.U.K (FOR SOCIETY ONLY).
2026_HRY_501305_1
2026334CC131 4908 4726 947F 680C25284FD91139KUK
Open Tender
Civil Works
60 days
Kurukshetra (Thanesar)
2 documents required · 2 mandatory
₹590
₹9,300
Yes
4 May 2026
9 Feb 2026
18 Feb 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate]
[11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate]
[13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[5.33]Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate]
[7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
[9.32.2]Providing and fixing UV stabilised fibreglass reinforced plastic sheet roofing up to any pitch, including fixing with polymer coated `J` or `L` hooks, bolts and nuts 8mm dia. G.I plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-violet stabiliser in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866.The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified. 2. 2 mm thick flat [Through Rate]
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_579939.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid