Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
6 Mar 2024, 9:00 amClosed
Divisional Forest Officer, Batote
Divisional Forest Office Batoe
BOQ
2024_FD_245937_1
Tender No 75 of 2023-24
Open Tender
Civil Works
Item Rate
30 days
11 Batote Batote Forest Range
SBD
2 documents required · 2 mandatory
₹500
Divisional Forest Officer Batote
₹15,000
Yes
6 Mar 2024
28 Feb 2024
6 Mar 2024
28 Feb 2024
6 Mar 2024
28 Feb 2024
Amount
A. CHAIN LINK FENCING:- i. Cleaning jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at height of 1 mtr above ground level and removal of rubbish upto a distance of 50 moutside the prephery of area cleared. (500 Rft in length & 5 feet in width)=2500 Sq. Feet.
ii. Excavation work in excavation by mannual means for foundations, drains, pipes, cables etc (not exceding 1.5 m in width) and for shafts walls cesspits and the like not exceeding 10 Sq mtrs on plan, depth up to 1.5 mtrs including the disposal of excavated earth up to 1 mtrs from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. (Toe wall between pits 250 Rft x 1'.6" x0.6") & (63 Pits x 1'.6" x1'.6" x 1'.00")= 329.25 cub.feet.
iii. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- Al work up to plinth level: 1:5:10 ( 1 cement: 5 coarse sand : 10 graded stones aggregate 40 mm nominal size crushed ). (63 Pits 1'.00" x 1'.00" x 0.25') & (Tow wall 250 Rft x 1'.00" x 0.25')=78.25 cub.feet. item includes all carriages.
iv. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- Al work up to plinth level: 1:2:4 ( 1 cement: 2 coarse sand : 4 graded stones aggregate 40 mm nominal size). (63 Pits 1'.00" x 1'.00" x 0.75') =47.25 cub.feet. item includes all carriages.
v. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level: 1:3:6 ( 1 cement: 3 coarse sand : 6 graded stones aggregate 20 mm nominal size)with 20% boulders. (Tow wall 500 Rft 1'.00" x 0.75'). =375 cub.feet, item includes all carriages.
vi. Centering and shuttering including struting, propping etc and removal of form for foundations, footing, bases of column etc for mass concrete. (63 Pits 1.00'x 0.75')x4 & (Toe Wal 500 Rft in length x 0.75') x2. =2400 sft. item includes all carriages.
vii. Supplying at site angle iron posts and struts of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes up to 10 mm dia etc complete. A. Angle Iron (vertical & horizontal) of size 50x50x6 mm, B. Flat Iron (vertical & horizontal) of size 40x6 mm. item includes all carriages.
vii. Providing and fixing G.I. Chain link (mesh) fabric fencing of required width in mesh size 50x50 mm incluing strengthening with 2 mm dia wire or nuts, bolts and washer as required complete as per direction of Engineer in chage made of GI wire of dia 4 mm. (500 rft in length & 5 feet in height or width.) item includes all carriages.
viii. Painting with ready mixed synthetic enamel paint of approved brand and mannufacture in all shades to give an even shade on new stell work.Quantity vide item No: 07 & 8 above, item includes all carriages.
SHAKEEL AHMED SHEIKH
Showket Hussain
JAVED SOHAIL
Haider Abass Hussain
MOHD MUSHTAQ
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .