| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAccepted-Finance | ₹5.5 Cr | L1 | Accepted-Finance Accepted being L1 bidder. |
| 2 | L2₹6.7 Cr+₹1.2 Cr (21.6%)Rejected-Finance AT PO DERA COLLIERY TALCHER DIST ANGUL ODISHA PIN 759103 | ANUGUL | ODISHA | 759103 | ₹6.7 Cr+₹1.2 Cr (21.6%) | L2 | Rejected-Finance Rejected not being L1 bidder. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected as per NIT |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected as per NIT |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected as per NIT |
Tender Value
₹8.5 Cr
EMD Value
₹10.6 L
Closing Date
17 Mar 2026, 5:00 pmClosed
Sri Jyotirmay Sinha, GM(Civil-Welfare), MCL
MCL, Jagriti Vihar, Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9437145678.
Construction of 30 Nos new classroom building inside DAV Complex (English Medium), under Jagannath Area.
2026_MCL_353767_1
MCL/Samb/Civil-Wel/e Tender/25-26/38 Dated. 19/02/2026
Open Tender
Civil Works - Buildings
Percentage
730 days
Jagannath Area
As per Tender Document
5 documents required · 5 mandatory
₹10.6 L
27 Aug 2026
21 Feb 2026
19 Mar 2026
21 Feb 2026
17 Mar 2026
23 Feb 2026
21 Feb 2026 - 10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A - CIVIL PORTION | |||||
| 1.01 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soil. | 3,000 | SQMT | 19.1 | ₹57,300 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 942.81 | CUM | 216.05 | ₹2,03,694.1 |
| 1.03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 314.27 | CUM | 173.7 | ₹54,588.7 |
| 1.04 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 346.75 | CUM | 864.6 | ₹2,99,800.05 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 441.5 | CUM | 4,621.85 | ₹20,40,562.95 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 218.13 | CUM | 6,777.45 | ₹14,78,351.61 |
| 1.07 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu- ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 131.23 | CUM | 8,037.35 | ₹10,54,741.44 |
| 1.08 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto15degree, landings, balconies, shelves, chajjas, lintels, b ands,plain window sills, staircases and spiral staircases upto floor five level excluding the cost of centering, shuttering, finishing & reinforcement with 1:1.5:3(1cement:1.5coarse sand:3 grded stoneaggregate 20mm nominal size derived from natural sources). | 664.14 | CUM | 8,394.4 | ₹55,75,056.82 |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 27,993.3 | KG | 97.9 | ₹27,40,544.07 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.65 MB
Tendernotice_2.pdf
PDF • 0.70 MB
BOQ_366589.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .