Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.9 L+₹97,390 (16.4%)Rejected-Finance 36 151 E 25 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | SALEM | TAMIL NADU | 621011 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
25 Jun 2024, 2:00 pmClosed
CE / MTPS - II
O/o CE / MTPS - II
Replacing of wornout 150 NB MS ERW Pipelines for Vacuum pump A tubular heat exchanger inlet and outlet lines, 80 NB MS ERW pipe for OLTCS inlet and outlet lines, providing platform lladder structurals Lifting frames for Accumulator bladders of TDB
2024_EB_455192_1
OT 45/24-25
Open Tender
Miscellaneous Works
Works
30 days
SEESMTPSII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,500
Yes
8 Aug 2024
18 Jun 2024
26 Jun 2024
18 Jun 2024
25 Jun 2024
18 Jun 2024
Amount
Supply of 18 Meters of 150 NB ERW pipe: Charges for supply of 18 Meters of 150 NB ERW pipe including the cost of transportation and T&Ps.
Leading and lifting of 150 NB pipe line up to 6 mtr elevation of Vacuum pump area: Charges for leading and lifting the 30 mtr length(New Pipe-18mtr & 12 mtr of MS ERW available pipe) ERW pipe by providing pulley block with proper support and lowering the defective pipe to ‘0’ mtr for replacing the punctured inlet and outlet cooling water lines of tubular heat exchanger including the charges of T&P and consumables.
Erection of 30 Mtrs of 150 NB pipe for replacement of eroded Vacuum Pump 'A' heat exchanger cooling water tube: Charges for erection of 30 meters of 150NB ERW pipe line by cutting, edge preparation and welding in the line including the cost of MS ERW bend, T joint, T&P and consumables.
Supply of 50 Meters of 80 NB ERW pipe: Charges for supply of 50 Meters of 80 NB ERW pipe including the cost of transportation and T&Ps.
Charges for Replacement of MS ERW 80 NB pipe line by cutting, edge preparation and welding for providing OLTCS Pass A&B Inlet and Outlet line including cutting & welding of flanges, fixing of valves for the total length of 70 meters(New Pipe-50 mtr & 20 mtr of MS ERW available pipe) with T & P and consumables.
Providing Piping support for 80NB: Charges for providing MS piping support for OLTCS inlet & Outlet pipe line including cutting, drilling, fixing clamps and fasteners and welding including the cost of T & P and consumables.
Charges for Providing of M.S ERW 1” pipe line by cutting, edge preparation and rerouting including cutting & welding of flanges, fixing of valves, bends etc., for providing Auxiliary water line to CEP area and MOT Centrifuge Oil system for the total length of 30 meter with T & P and consumables.
Charges for fabrication and providing platform / ladder structurals & Liftting Frames for Accumulator bladder of TDBFP 'A' & 'B' , EH Oil System, CEP and Condenser areas .
TAM AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .