Tender Value
₹40.8 L
EMD Value
₹41,000
Closing Date
15 Apr 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer Vp Reddiyarchatram
Panchayat union Reddiyarchatram
AGAMT 2025-2026 Reddiyarchatram block Gurunathanaickanr Panchayat
2025_RDTN_538949_1
AGAMT 2025-2026 3478/2024 Reddiyarchatram block Package 4
Open Tender
Civil Works
Works
180 days
Panchayat union Reddiyarchatram
AGAMT 2025-2026 Reddiyarchatram block Gurunathanaickanr Panchayat
4 documents required · 4 mandatory
₹0
₹41,000
Yes
Panchayat union Reddiyarchatram
25 Apr 2025
5 Apr 2025
15 Apr 2025
5 Apr 2025
15 Apr 2025
5 Apr 2025
10 Apr 2025
Amount
1. Construction of 2M Span Slab Culvert In Mannarkottai to Kovilpatty Road At Theppakulathupatty Priuve Estimate Amount Rs.9.00 Lakhs
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
BGL Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
AGL Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Cemant Concrete 1:3:6 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Cemant Concrete 1:2:4 using 20mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete.
RCC 1:1.5 :3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer
Gravel filling between body wall including cost and conveyance of gravel labour for filling watering and compacting etc complete complying with standard specifications and as directed by the Departmenal officer
Providing and fixing 20mm compressible fiber board in expantion joint complete as per drawing and MORD technical specification
Providing and fixing TAR paper for bearinig between bed block and deck slab
100MM PVC Pipe
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
2. Construction of 2M Span Slab Culvert In Mannarkottai to Kovilpatty Road At Theppakulathupatty Priuve Estimate Amount Rs.9.00 Lakhs
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
BGL Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
AGL Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Cemant Concrete 1:3:6 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Cemant Concrete 1:2:4 using 20mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete.
RCC 1:1.5 :3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer
Gravel filling between body wall including cost and conveyance of gravel labour for filling watering and compacting etc complete complying with standard specifications and as directed by the Departmenal officer
Providing and fixing 20mm compressible fiber board in expantion joint complete as per drawing and MORD technical specification
Providing and fixing TAR paper for bearinig between bed block and deck slab
100MM PVC Pipe
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
2) Providing Paver Block Pavement From Karattupatty colony E.Sevaimayam to Sak::1354000
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Paving interlocking Paver Blocks of 60mm thick including all cost and conveyance of all materials and all albour charges etc complete
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
3) Providing Paver Block Pavement From Aroikiyammal mary House (80M) ESTIMATE COST : 360000
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Paving interlocking Paver Blocks of 60mm thick including all cost and conveyance of all materials and all albour charges etc complete
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
4) Construction of threasing Floor At Kovilpatty Estimate Amount Rs.9.21 Lakhs
Earthwork excavation for foundation in all clauses of soils and subsoils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, struting and bailing out water wherever neccessary and refilling the sides of foundation
Refilling the excavated earth otherthen M. Sand including all cost and conveyance of all matirials and all labour charges etc complete .,
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum.
Supply and eracting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 X40 cm and BG for stiffened with welded mild steel angle of size 25 x 25 x3 mm for boarding laid over silver oak (country wood) joists of size 10 x6.50 cm spaced at about 90 centre to centre and supported by casaurina props of 10-13 cm dia spaced at 75 cm c/c etc.,complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance of all matirials and all labour charges etc complete .,
Plastering with cement mortar 1:5 mix to 20mm thick including curing, cost and conveyance of all materials & all labour charges etc., complete.
Painting Two coats with exteroir emulsion paint including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and fixing of Cool sheet rrofing with "J" Bolts including curing, cost and conveyance of all materials & all labour charges etc., complete.
Provision for Hollw pipe for trees with Hollow pipe purlins arrangements
Provision for Bitimen pad charges
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
FATHIMA MARY CONTRACTOR (BID ID -1294601)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .