Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹9.4 L+₹32,555.24 (3.58%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.2 L+₹2.1 L (23.0%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | PR CONSTRUCTION L3 | RAMACHANDRAN R L1 | Goppammal R L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of Kalaiarangam Building at Korukkampatti Village and Panchayat in Rajapalayam Block in MLACDS 2026-27 | ||||||
| 1.01 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 23.19 | m3 Rate for / m3 | 390 ₹9,044.1 | 240 ₹5,565.6 Lowest | 260 ₹6,029.4 |
| 1.02 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges. | 7.47 | m3 Rate for / m3 | 6,800 ₹50,796 | 5,399 ₹40,330.53 Lowest | 5,399 ₹40,330.53 Lowest |
| 1.03 | Brick work in cm 1:5 mix country bricks including all cost & conveyance of all materials. | 18.64 | m3 Rate for / m3 | 9,800 ₹1,82,672 | 5,665 ₹1,05,595.6 Lowest | 5,665 ₹1,05,595.6 Lowest |
| 1.04 | RCC in cm1:11/2:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 19.61 | m3 Rate for / m3 | 9,900 ₹1,94,139 | 8,654 ₹1,69,704.94 Lowest | 8,855 ₹1,73,646.55 |
| 1.05Centering charge for RCC works including all cost and conveyance all labour charges etc., complete. | ||||||
| 1.06 | Below G.L | 54.54 | m2 Rate for / m2 | 600 ₹32,724 | 517 ₹28,197.18 Lowest | 540 ₹29,451.6 |
| 1.07 | Above G.L | 89.87 | m2 Rate for / m2 | 620 ₹55,719.4 Lowest | 1,025 ₹92,116.75 | 1,080 ₹97,059.6 |
| 1.08 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 31.82 | m2 Rate for / m2 | 260 ₹8,273.2 Lowest | 268 ₹8,527.76 | 268 ₹8,527.76 |
| 1.09 | Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete. | 214.52 | m2 Rate for / m2 | 280 ₹60,065.6 | 242 ₹51,913.84 Lowest | 242 ₹51,913.84 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
19 Nov 2026, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer
Union office,Rajapalayam
Construction of Kalaiarangam Building at Korukkampatti Village and Panchayat in Rajapalayam Block in MLACDS 2026-27
2026_RDTN_718615_5
A2/2753/2026 Dt 22.11.2026
Open Tender
Civil Works
Item Rate
120 days
Rajapalayam
Refer Tender Document
5 documents required · 5 mandatory
₹0
₹10,000
Union office,Rajapalayam
24 Nov 2026
28 Oct 2026
19 Nov 2026
28 Oct 2026
19 Nov 2026
28 Oct 2026
3 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Kalaiarangam Building at Korukkampatti Village and Panchayat in Rajapalayam Block in MLACDS 2026-27 | |||||
| 1.01 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 23.19 | m3 Rate for / m3 | - | - |
| 1.02 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all labour charges. | 7.47 | m3 Rate for / m3 | - | - |
| 1.03 | Brick work in cm 1:5 mix country bricks including all cost & conveyance of all materials. | 18.64 | m3 Rate for / m3 | - | - |
| 1.04 | RCC in cm1:11/2:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 19.61 | m3 Rate for / m3 | - | - |
| 1.05 | Centering charge for RCC works including all cost and conveyance all labour charges etc., complete. | - | - | - | - |
| 1.06 | Below G.L | 54.54 | m2 Rate for / m2 | - | - |
| 1.07 | Above G.L | 89.87 | m2 Rate for / m2 | - | - |
| 1.08 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 31.82 | m2 Rate for / m2 | - | - |
| 1.09 | Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete. | 214.52 | m2 Rate for / m2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
5_Techbid_Korukkampatti.pdf
Tender Documents • 1.51 MB
BOQ_863070.xls
BOQ • 0.37 MB
Corrigendum.pdf
PDF • 0.18 MB
Date.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .