| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹4.0 CrAccepted-Finance BRIT COLONY GOSANINUAGAM WARD NO 14 CITY HIGH SCHOOL ROAD BERHAMPUR GANJAM | GANJAM | ODISHA | 760001 | ₹4.0 Cr | 1st | Accepted-Finance Quoted 14.99 percent Less |
| 2 | 1st₹4.0 CrAccepted-Finance | ₹4.0 Cr | 1st | Accepted-Finance Quoted 14.99 percent Less |
| 3 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
| 4 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹4.7 Cr
EMD Value
₹4.7 L
Closing Date
9 Mar 2026, 5:30 pmClosed
Chief Construction Engineer, R.W.Circle, BAM,
O/O Chief Construction Engineer, RWC, BAM Near Income Tax Office Ambapua-11
Construction of road from Gudiapalli PWD road to Dheumal PS road under MMSY-CMRL in the District of Ganjam for the year 2025-26.
2026_CERWI_126799_1
Online Tender/51-2025-26/BPR
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Ganjam
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹4.7 L
Yes
31 Aug 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
2 Mar 2026 - 7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Construction of embankment with approved material obtained from borrow pits transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H specifications for Road and Bridge works (4th Revision) with cost of all labour, T&P and with cess, royality and as per direction of Engineer-in-charge. (Payment of earthwork will be made compacted level section) only | 21,224.22 | One Cum | 201 | ₹42,66,068.22 |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 and as per the direction of the Engineer in charge. | 1,423.95 | One Cum | 50.4 | ₹71,767.08 |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density including lighting, barricadding and maintenance of diversion etc. as per Tables 400.11 & 400.12 and Technical Specification clause 406 with cost of all labour, T&P and with cess, royality, additional charges, DMF 10% & EMF 5% over royalty and as per direction of Engineer-In-Charge. | 2,570.4 | One Cum | 2,601.87 | ₹66,87,846.65 |
| 6 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Technical Specification Clause 502 of MoRD for low porosity surface. and as per direction of Engineer-In-Charge. (By Mechanical Mean) | 17,136 | One Sqm | 35.66 | ₹6,11,069.76 |
| 7 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 of MoRD. and as per direction of Engineer-In-Charge. (By Mechanical Mean) | 17,136 | One Sqm | 13 | ₹2,22,768 |
| 10C,C,ROAD Providing, laying, spreading and compacting stone aggregates of 63mm to 45mm size (Gr-II) / 53mm to 22.4mm size (Gr-III) WBM specification (75mm compacted thickness) as follows including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials of moorum or gravel with sand admixture to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including hire and running charges of PRR and all other machinaries including all labour, T&P and cost, conveyance royality, DMF (10% of royalty), EMF (5% of royalty), additional charges, Cess & taxes of all materials required for the work complete in all respect as per direction of the Engineer-in-Charge. | |||||
| 10.1 | WBM Gr-II | 57.38 | One Cum | 3,068.13 | ₹1,76,049.3 |
| 12 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type M-30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, primer, sealant, near approaches to bridge/culvert or at any approved portion of road and construction joints, admixtures as approved, curing of concrete slabs for 14-days as per MoRD including cost, conveyance, royality, additional charges, DMF 10% & EMF 5% over royalty Cess, taxes & technical specification Clause 1501
and as per direction of Engineer-in-Charge. | 137.7 | One Cum | 6,816.61 | ₹9,38,647.2 |
| 14 | Providing & filling good clean river sand of approved quality including watering to complete saturation & ramming complete including cost conveyance, royalty, additional charges, DMF 10% & EMF 5% over royalty Cess & taxes of all materials & cost of all labour & T&P required for the work etc complete as per specification & direction of Engineer-in Charge. | - | One Cum | 813.14 | - |
| 15.1 | In Foundation | - | One Cum | 5,616.56 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 2.27 MB
BOQ_583646.xls
BOQ • 0.36 MB
Gudiapalli.pdf
Tender Documents • 4.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .