Loading…
Loading…
Tender Value
₹9.6 L
EMD Value
₹19,160
Closing Date
1 Jul 2026, 6:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
EO NP Barisadri
Office of the EO NP Barisadri
04 - Shmashan me Khula Baramda nirman karya Barisadri.
2026_DLB_571401_4
NIT No 05/2026-27 NP BARISADRI
Open Tender
Civil Works
120 days
BARISADRI
As per given in NIT and Conditions
3 documents required · 3 mandatory
₹500
As per NIT and Conditions
₹19,160
Yes
26 Jun 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
1 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | As Per RUIDP SOR 2023 | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 20.74 | Cum | 229.5 | ₹4,758.91 | BI01010001010000000000000515BI0100001113 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.59 | Cum | 4,330 | ₹11,223.36 | BI01010001010000000000000515BI0100001114 |
| 4 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 124.26 | Sqm | 236.5 | ₹29,387.49 | BI01010001010000000000000515BI0100001115 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size | 22.9 | Cum | 5,940 | ₹1,36,055.7 | BI01010001010000000000000515BI0100001116 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 81 | Sqm | 375 | ₹30,375 | BI01010001010000000000000515BI0100001117 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 7.29 | Cum | 6,990 | ₹50,957.1 | BI01010001010000000000000515BI0100001118 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form forSuspended floors, roofs, landings, balconies and access platform | 222.3 | Sqm | 456 | ₹1,01,368.8 | BI01010001010000000000000515BI0100001119 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar M-15 Grade Concrete (1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) -As per design mix) | 25.96 | Cum | 7,220 | ₹1,87,467.3 | BI01010001010000000000000515BI0100001120 |
| 10 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars. | 3,500 | kg | 83.3 | ₹2,91,550 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
Tendernotice_2.pdf
PDF • 22.42 MB
BOQ_1016738.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid