Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹44.5 CrAdmitted-Finance | ₹44.5 Cr | Admitted-Finance |
| 2 | ₹58.1 CrAdmitted-Finance 240 SECTOR 3 HSIIDC BAWAL REWARI HARYANA 123501 UDYAM HR 15 0001745 | REWARI | HARYANA | 123501 | ₹58.1 Cr | Admitted-Finance |
| 3 | ₹60.3 CrAdmitted-Finance SECTOR 136 NOIDA MULTITEX NOIDA SECTOR 136 GAUTAM BUDDHA NAGAR UTTAR PRADESH 201304 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201304 | ₹60.3 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | Oswal Infrastructure Limited | MULTITEX FILTRATION ENGINEERS LTD | Bliss Anand Pvt Ltd |
|---|---|---|---|---|---|---|
| 1.00Design, engineering, manufacture, procurement of materials and bought out components, fabrication, assembly at shop, inspection (including third party inspection), painting (both primer + finish coat), testing at manufacturer's works, insulation, packing and supply of Purge Gas Recovery Unit (Membrane Unit) including supply of all mandatory spares, commissioning spares, consumable, special tools and tackles (if any), first fill of oils, lubricants etc. & their replenishment till commissioning at site as per the enclosed Job Specifications, Scope of Work, P&IDs, Process specifications & datasheets, EIL standard specifications and other codes and standards attached or referred. (also refer to General Remark-1 at the end of MR document)). | ||||||
| 1.10 | Total Supply Price on FOT despatch point basis including P&F [MR Item Sl. No. 01.001, Tag No : 1P39-Z-6581, MR Item Description: PURGE GAS RECOVERY UNIT (MEMBRANE UNIT)]
(INCLUDING ALL TAXES & DUTIES BUT EXCLUDING GST) | 1 | LOT | 42,45,00,000 ₹42,45,00,000 | 59,00,00,000 ₹59,00,00,000 | 56,25,00,000 ₹56,25,00,000 |
| 2.00 | SITE WORK: Testing, pre-commissioning, commissioning at site by OEM of respective items, including all tools & tackles, laptops, software, etc., for all the Thyristorised Electric Heaters supplied as part of the package, as per the enclosed EIL Standard Specifications, Scope of Work, Job Specification, Data sheets etc. (also refer to General Remark-9 at the end of MR document)
MR Item Sl. No 22.001 [Tag No : {22}1P39-Z-6581, MR Item Description: PURGE GAS RECOVERY UNIT (MEMBRANE UNIT)] (Excluding GST) (also refer to General Remark-9 at the end of MR document & note 6 of Preamble to this SOP)
(INCLUDING ALL TAXES & DUTIES BUT EXCLUDING GST) | 1 | LUMPSUM | 10,00,000 ₹10,00,000 | 3,00,000 ₹3,00,000 | 9,00,000 ₹9,00,000 |
| 3.00 | MR Item Sl. No 03.001 - Total Transportation Charges up to Project Site
[For Tag No : {03}1P39-Z-6581, MR Item Description: PURGE GAS RECOVERY UNIT (MEMBRANE UNIT)]
(INCLUDING ALL TAXES & DUTIES BUT EXCLUDING GST) | 1 | LOT | 1,10,00,000 ₹1,10,00,000 | 38,00,000 ₹38,00,000 | 39,00,000 ₹39,00,000 |
| 4.00Supervision of erection, testing and commissioning at site of items specified at MR item Sl. No. 01.001 above (excluding Testing, pre-commissioning, commissioning of the Thyristorised Electric Heater covered in MR Item Sl. No. 22.00), as per enclosed specification. (also refer to General Remark-3 at the end of MR document) | ||||||
| 4.10 | MR Item Sl. No. 08.001 - Per Diem charges for 8 hours work on normal working day (excluding GST)
[Tag No : {08}1P39-Z-6581, MR Item Description: PURGE GAS RECOVERY UNIT (MEMBRANE UNIT)] (Overtime Charges to be quoted in Format-A3)
(INCLUDING ALL CHARGES BUT EXCLUDING GST) | 1 | Per Diem | 1,50,000 ₹1,50,000 | 1,60,000 ₹1,60,000 | 2,50,000 ₹2,50,000 |
| 5.00Training Charges for Training of Owner's personnel at Site (excluding training of Package PLC) (also refer to General Remark-4 at the end of MR document) | ||||||
| 5.10 | MR Item Sl. No. 11.001 - Per-Diem Trainng Charges for Training of Owner's personnel at Site (excluding training of Package PLC) (excluding GST)
[For Tag No : {11}1P39-Z-6581, MR Item Description: PURGE GAS RECOVERY UNIT (MEMBRANE UNIT)]
(INCLUDING ALL CHARGES BUT EXCLUDING GST) | 1 | Per Diem | 1,50,000 ₹1,50,000 | 3,50,000 ₹3,50,000 | 2,50,000 ₹2,50,000 |
| 6.003D Modelling of Complete Purge GasRecovery Unit (Membrane Unit) as per Piping specification attached with the enquiry document (also refer to General Remark-6 at the end of MR document) | ||||||
| 6.10 | MR item Sl. No. 16.001 - 3D Modelling of Complete Purge GasRecovery Unit (Membrane Unit) as per Piping specification attached with the enquiry document (also refer to General Remark-6 at the end of MR document) (excluding GST)
[Tag No : {16}1P39-Z-6581, MR Item Description: PURGE GAS RECOVERY UNIT (MEMBRANE UNIT)]
(INCLUDING ALL TAXES & DUTIES BUT EXCLUDING GST) | 1 | Lumpsum | 25,00,000 ₹25,00,000 | 50,00,000 ₹50,00,000 | 24,00,000 ₹24,00,000 |
Tender Value
Refer Docs
Closing Date
10 Feb 2026, 12:00 pmClosed
Mr. Lotavath Thavurya, GM (SCM)
EIL GURUGRAM
PURGE GAS RECOVERY UNIT (MEMBRANE UNIT) for Polypropylene Unit (PPU) Project at Numaligarh Refinery, Assam
2025_EIL_886014_1
LT/C050-1P39A-LZ-MR-4030/2
Limited
Miscellaneous Goods
480 days
AS PER BIDDING DOCUMENT
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
Exempted
AS PER BIDDING DOCUMENT
9 Jun 2026
20 Nov 2025
11 Feb 2026
20 Nov 2025
10 Feb 2026
11 Dec 2025
20 Nov 2025 - 26 Nov 2025
27 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 23.30 MB
Download all tender documents and submit your bid