Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 LAccepted-Finance 5 6 KILAKKUKATTU KOTTAI PALLIPATTY BELUKKURICHI PO NAMAKKAL 637402 | NAMAKKAL | NAMAKKAL | TAMIL NADU | 637402 | L1 | Accepted-Finance L1 | |
| 2 | L2₹49.1 L+₹17,329.60 (0.35%)Accepted-Finance | L2 | Accepted-Finance L2 |
Tender Value
₹49.5 L
EMD Value
₹49,450
Closing Date
13 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (BP)
BDO Office, P.N.Palayam Panchayat Union.
Salem District - P.N.Palayam Block - Maintenance of the road from Thamaiyanur ODR road to Dhuwagapuri road Km 0/0-2/500 Panchayat in General Fund -2023-2024
2023_RDTN_396058_2
Roc.No.1764/2023/A3
Open Tender
Civil Works
Item Wise
120 days
BDO Office, P.N.Palayam Panchayat Union.
As per tender Document
3 documents required · 3 mandatory
₹0
₹49,450
20 Aug 2024
4 Dec 2023
13 Dec 2023
4 Dec 2023
13 Dec 2023
4 Dec 2023
Amount
1) Maintenance of the road from Thamaiyanur ODR road to Duwaragapuri km 0/0-2/500
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Advance Bituminous Patch work - 50 mm thick using 45mm IRC HBG metal premixed with 44 Kg. of including cost and conveyance of metal from approved Quarry, cost of Bitumen, Labour charges for levelling, tamping etc. complete complying with standard specification
Advance Bituminous Patch work- 25 mm thick using 13.2mm IRC HBG metal premixed with 44 Kg. of including cost and conveyance of metal from approved Quarry, cost of Bitumen, Labour charges for levelling, tamping etc. complete complying with standard specif
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30/40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory / phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 (Plastic Waste)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Provision for KM stone
Provision for HM stone
Provision for Sign Board
Provision for Name Board including erection charges and painting
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
NANDHINI AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .