Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC BATHINDA PUNJAB PB | BATHINDA | PUNJAB | 151001 | ₹2.0 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹2.1 Cr+₹9.6 L (4.93%)Rejected-AOC 282 MODEL TOWN PHASE 3 URBAN ESTATE BATHINDA | BATHINDA | PUNJAB | 151001 | ₹2.1 Cr+₹9.6 L (4.93%) | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
20 Dec 2024, 12:00 pmClosed
XEN
Executive Engineer Sri Muktsar Sahib Canal and Ground Water Division at Gidderbaha
Estimate for Reconstruction/Rehabilitation of concrete lining of Sukhchain Distributary From RD 44277-54485 off taking RD 365890/R Sirhind Feeder
2024_WR_130819_1
NIT No 2039
Open Tender
Civil Works
Item Wise
Gidderbaha
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
₹3.6 L
Yes
13 Jan 2025
2 Dec 2024
20 Dec 2024
2 Dec 2024
20 Dec 2024
2 Dec 2024
Dismantling of brick Masonry laid in CSM
Dismantling of Plain Concrete 1:3:6
"Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m."
Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications.
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth)
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (1.50 mtr - 3 mtr depth)
Dressing of side slopes and preparation of subgrade for lining complete in all respect as per PWD specifications and engineer-in-charge.
E/work in excavation in foundation/ trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 mt depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation.
Excavating conglomerate for drains and bed sleepers under the lining.
Extra bitumen painting at 0.69 Kg. per Sqm (as per IS 3384-1985)
Supplying and Laying LDPE film of 150 microm over sleepers (for construction & expansion joints) I/C carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.(M-73)
Shuttering for faces of Concrete
Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km
Providing and filling Construction joint sealing compound with coarse sand and 6 percent bitumen by weight complete as per drawings complete in all respect
Dressing of earth work for new work or remodeling work Unit
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge exceeding 1.5 Cum/s but upto 4.5 Cum/s including boundary road
Cement concrete lining 15cm thick or less for irrigation channels, using cement concrete 1:2:4 (M-15) 19 -19.23 Machine mixed concrete lining on side slopes for vertical height upto 3.5 m.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads . total lead 2.92km pucca ((a)) Disposal/carraige from 0 upto 450m
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads . total lead 2.92km pucca ((b)) Disposal/ carraige additional beyond 450m upto 1Km
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads . total lead 2.92km pucca ((c)) Disposal/carraige for 1.99km from 1km upto 2.92km.
Sub Estimate : 1.1 - Outlet on petrollling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
Sub Estimate : 1.1 - Outlet on petrollling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
Sub Estimate : 1.1 - Outlet on petrollling side Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.5m but upto 0.9 m
Sub Estimate : 1.1 - Outlet on petrollling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
Sub Estimate : 1.1 - Outlet on petrollling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
Sub Estimate : 1.1 - Outlet on petrollling side RCC M-20 in superstructure
Sub Estimate : 1.1 - Outlet on petrollling side Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Sub Estimate : 1.1 - Outlet on petrollling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Sub Estimate : 1.1 - Outlet on petrollling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
Sub Estimate : 1.2 - Outlet on non petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
Sub Estimate : 1.2 - Outlet on non petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
Sub Estimate : 1.2 - Outlet on non petrolling side Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.5m but upto 0.9 m
Sub Estimate : 1.2 - Outlet on non petrolling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
Sub Estimate : 1.2 - Outlet on non petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
Sub Estimate : 1.2 - Outlet on non petrolling side RCC M-20 in superstructure
Sub Estimate : 1.2 - Outlet on non petrolling side Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Sub Estimate : 1.2 - Outlet on non petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Sub Estimate : 1.2 - Outlet on non petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
Sub Estimate : 1.3 - distance mark Laying cement concrete 1:3 :6 (M-10) with stone ballast or shingle I/c supply and carriage of material at site of work complete in all respect
Sub Estimate : 1.3 - distance mark Laying R.C.C. 1:2 :4 (M-15) excluding steel reinforcement but including centering and shuttering and vibrating the concrete (precast concrete )
Sub Estimate : 1.3 - distance mark Bending binding and placing in position steel reinforcement
Any Other
ABHAY BUILDERS (BID ID -605467)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .