Loading…
Loading…
Tender Value
₹15.5 L
EMD Value
₹31,100
Closing Date
5 Oct 2026, 6:00 pm
DFO Lidder Forest Division Bijbehara
OFFICE OF THE DFO LIDDER
Improvements Upgradation of Sandoz Eco Park, Seer Hamdan. Lidder Forest Division Bijbehara.
2026_FD_325496_3
eNit 10 of 2026-27 Serial No 1 2 and 3
Open Tender
Agricultural or Forestry
Percentage
Lidder Forest Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
DFO LIDDER
₹31,100
24 Sept 2026
24 Sept 2026
6 Oct 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas Exceeding 30 cm in depth, 1.5 meter in width as well as 10 Sqm on plan) including disposal of excavated earth lead up to 1 meter for cutting edge disposed earth to be leveled and neatly dressed in All kinds of soil. | 16.71 | CUM | 479.3 | ₹8,009.1 |
| 2 | Providing & laying dry stone soling hand packed including ramming, watering and dressing including all carriages, Head load etc from approved source up to site of work complete. job. | 6.53 | CUM | 1,000 | ₹6,530 |
| 3 | Providing & laying in position cement concrete (1cement: 4coarse sand: 8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. including all carriages, Head load etc from approved source up to site of work complete job. All work upto plinth level. | 1.19 | CUM | 5,202.9 | ₹6,191.45 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.02 | CUM | 7,788.4 | ₹7,944.17 |
| 5 | Reinforcement Steel work including straightening cutting, bending , placing in position and binding all complete TMT barsincluding all carriages, Head load etc from approved source up to site of work complete job. | 101.95 | KG | 123.2 | ₹12,560.24 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings , bases of columns etc. for mass concreteincluding all carriages, Head load etc from approved source up to site of work complete job. | 41.11 | SM | 286.35 | ₹11,771.85 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 16.54 | CUM | 6,540.45 | ₹1,08,179.04 |
| 8 | Brick work with common burnt clay selected bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10 mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6 coarse sand) including curing complete in, With Non Modular bricks | 0.49 | CUM | 9,274.25 | ₹4,544.38 |
| 9 | 12 mm cement plaster of mix 1:4. (1 cement : 4 coarse sand ). | 6.51 | SM | 283.8 | ₹1,847.54 |
| 10 | Providing & fixing of wooden Columns Vertical & Horizantal for truss work. (First Class Kail Wood) | 0.77 | CUM | 1,08,897.35 | ₹83,850.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_1100210.xls
BOQ • 0.43 MB
corrigendum11.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .