Tender Value
₹88.7 L
EMD Value
₹1.8 L
Closing Date
18 Sept 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-I, APWD, Rangat
Rectification work for the control of leakage from Kadamtala New Dam under CD-I, Rangat - 7th Call.
2026_APWD_24498_1
53/DB/CD-I/RGT/2023-24
Open Tender
Civil Works - Others
Item Rate
120 days
Kadamtala
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.8 L
31 Aug 2026
31 Aug 2026
18 Sept 2026
31 Aug 2026
18 Sept 2026
31 Aug 2026
31 Aug 2026 - 18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rectification work for the control of leakage from Kadamtala New Dam. Providing and applying crystalline mortar by mixing in the ratio of 4.5 : 1 (4.5 parts crystalline mortar : 1 part water) for the treatment of faulty construction joints, cracks, tie rod holes and spalled & honeycombed surface of RCC underground structures like basement, water tanks, bridge deck etc. to ensure water tightness. The crystallie mortar shall conform to the EN 1504-3 having compressive strength Class R4 ?45 MPa and adhesive bond strength Class R3 ?1.5 MPa. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. | |||||
| 1.1 | For sealing cracks and faulty construction joints, routed out/making U-shape groove size 25x25mm and then primed the area with integral crystalline slurry @0.05kg/ running metre and while the surface is tacky filled the groove upto surface with crystalline mortar @1.50kg/ running metre. Once crystalline mortar is touch dry then finally applied two coats of integral crystalline slurry @0.05kg/running metre per coat. | 126 | metre | - | - |
| 1.2 | For patching of tie rod holes, prepared tie rod hole surface and then primed the area with integral crystalline slurry @0.070kg/sqm and while the surface is tacky repair and then filled the tie rod holes with crystalline [email protected] per hole. The crystalline mortar should be tightly rodded into tie rod holes or packed tightly (For 25x25x25 mm tie rod hole, use 0.040kg to fill the hole) | 100 | each hole | - | - |
| 2Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. | |||||
| 2.1 | For vertical surface two coats @ 0.70 kg per sqm | 550.61 | sqm | - | - |
| 3 | Making bore in all kinds of dia equivalent to HX size (capsing pipe 140 mm dia) by drilling and controlling and collecting, undistributed sample at ever 3 mtr | 225 | metre | - | - |
| 4 | Making bore in rock of dia NX size (76 mm) by drilling with single tube core upto a depth of 25 mtr | 225 | metre | - | - |
| 5 | Pressure grouting in rock as per IS 6066-1994 | 1,16,250 | litre | - | - |
| 6 | Insitu permeability test (water percollation) as per IS : 5529 (part-II) 1985. | 225 | metre | - | - |
| 7Construction of RCC retaining wall at right bank (Down stream) for a length of 18 mtrs with apron. Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
TenderDoc.pdf
Tender Documents • 13.15 MB
BOQ_25937.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .