| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC | ₹1.0 Cr | 1 | Accepted-AOC WORK AWARDED |
| 2 | 2₹1.1 CrRejected-AOC | ₹1.1 Cr | 2 | Rejected-AOC Second Lowest |
| Sl No | Description | Qty | Unit | E. Elangovan L2 | P. Arumugam L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling clearing away and carefully stacking materials useful for reuse for Floor finish & dadooing walls in cement mortar with Glazed Tiles etc., Complete complying with standard specification and as directed by the departmental officers. | 150.24 | Sq.m | 69 ₹10,366.56 | 68 ₹10,216.32 |
| 2.00 | Dismantling clearing away and carefully stacking materials useful for reuse for Brick work or Stone masonry in Cement mortar walls under 3m high etc., Complete complying with standard specification and as directed by the departmental officers. | 9.08 | Cu.m | 318 ₹2,887.44 | 312 ₹2,832.96 |
| 3.00 | Dismantling clearing away and carefully stacking materials useful for reuse for Pressed Tiles & Weathering Course etc., Complete complying with standard specification and as directed by the departmental officers. | 104.07 | Sq.m | 52 ₹5,411.64 | 51 ₹5,307.57 |
| 4.00 | Cleaning the campus by using JCB Machinery etc., complete with standard specifications. (Hire Charge only) | 176 | Hrs | 1,022 ₹1.8 L | 1,002 ₹1.8 L |
| 5.00Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brick work shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 5.01 | For Foundation and Basement | 21.8 | Cu.m | 7,919 ₹1.7 L | 7,768 ₹1.7 L |
| 5.02 | For Superstructure in Ground Floor | 39.89 | Cu.m | 8,017 ₹3.2 L | 7,864 ₹3.1 L |
| 5.03 | For Superstructure in First Floor | 13.8 | Cu.m | 8,213 ₹1.1 L | 8,057 ₹1.1 L |
| 5.04 | For Superstructure in Second Floor | 13.8 | Cu.m | 8,410 ₹1.2 L | 8,250 ₹1.1 L |
| 6.00Brick partition walls of 11.50cm thickness using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three Crushed Stone Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
Tender Value
₹1.0 Cr
EMD Value
₹61,000
Closing Date
9 Apr 2026, 3:00 pmClosed
The Superintending Engineer, PWD.,
The Superintending Engineer, PWD., Buildings Construction and Maintenance Circle,Tiruvannamalai-4.
Providing Temporary Arrangements to the Counting Hall, Storage cum Strong room, Barricade arrangements and Observer room Arrangements for Polur, Arani, Cheyyar, Vandavasi Assembly constituenci for MLA Election 2026 at University college at Arani.
2026_PWD_675435_1
87/TVM-CLE/25-26/2/ Dt.30.03.2026
Open Tender
Civil Works
12 days
Arani
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹61,000
4 Jun 2026
7 Apr 2026
9 Apr 2026
7 Apr 2026
9 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling clearing away and carefully stacking materials useful for reuse for Floor finish & dadooing walls in cement mortar with Glazed Tiles etc., Complete complying with standard specification and as directed by the departmental officers. | |||||
| 2Dismantling clearing away and carefully stacking materials useful for reuse for Brick work or Stone masonry in Cement mortar walls under 3m high etc., Complete complying with standard specification and as directed by the departmental officers. | |||||
| 3Dismantling clearing away and carefully stacking materials useful for reuse for Pressed Tiles & Weathering Course etc., Complete complying with standard specification and as directed by the departmental officers. | |||||
| 4Cleaning the campus by using JCB Machinery etc., complete with standard specifications. (Hire Charge only) | |||||
| 5Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brick work shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 5.01 | For Foundation and Basement | - | Cu.m | - | - |
| 5.02 | For Superstructure in Ground Floor | - | Cu.m | - | - |
| 5.03 | For Superstructure in First Floor | - | Cu.m | - | - |
| 5.04 | For Superstructure in Second Floor | - | Cu.m | - | - |
| 6Brick partition walls of 11.50cm thickness using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three Crushed Stone Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Arni_Doc.pdf
Tender Documents • 0.24 MB
Arni_GC.pdf
Additional Documents • 0.43 MB
BOQ_811797.xls
BOQ • 0.29 MB