Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹84.3 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder. Discounted their quoted rates | |
| 2 | 2₹94.4 L+₹3.1 L (3.43%)Rejected-Finance 549 E KANSHI NAGAR MODEL TOWN AMBALA CITY HARYANA 134003 | AMBALA CITY | AMBALA | HARYANA | 134003 | 2 | Rejected-Finance Higher Bid | |
| 3 | 3₹98.2 L+₹6.9 L (7.59%)Rejected-Finance NEAR JODHKA HANDLOOM PUREWAL COLONY PANIPAT HARYANA 132105 | PANIPAT | PANIPAT | HARYANA | 132105 | 3 | Rejected-Finance Higher Bid | |
| 4 | 4₹1.8 Cr+₹92.7 L (101.5%)Rejected-Finance 218 VIRAT NAGAR PANIPAT 132103 HARYANA | PANIPAT | PANIPAT | HARYANA | 132103 | 4 | Rejected-Finance Higher Bid | |
| 5 | Rejected-Technical SCO NO 14 TRANSPORT NAGAR BATHINDA 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | - | Rejected-Technical Firm didnot submitted all the requisite documents as per PQR |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
12 Apr 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sudip Ranjan Nandy
CE RGTPP Khedar Hisar
Cleaning work of Boiler and its Auxiliaries for 2x600 MW, Unit- I and II, RGTPP, Khedar, Hisar
2024_HBC_359792_1
2024E23DF449 609F 40A6 BD6F 5A91B90EC21E712PGC
Open Tender
Power/Energy Projects/Products
Works
720 days
KHEDAR
As per PQR of NIT
2 documents required · 2 mandatory
₹1,180
₹1.7 L
Yes
4 Jul 2024
26 Feb 2024
15 Apr 2024
26 Feb 2024
12 Apr 2024
26 Feb 2024
Amount
Daily Cleaning of Boiler & its aux. ground floor area (12 months for each Unit i.e. total 24 months for both the units for 1 year)
Regular Cleaning of Boiler Floors (above zero meter to 80 meter) & Various Equipment’s (12 months for each Unit i.e. total 24 months for both the units for 1 year)
Regular Cleaning of Fuel Oil Pump Houses Tank Area, common site for both Units (12 months for both Units)
Lifting & disposal of ash emptied from inside of various ducts during shut down (125 m3 for each Unit i.e. total 250 m3 for both Units)
KG ASHTECH PVT. LTD,
JAYTECH ENGINEERS AND CONTRACTORS
SIMAR INFRASTRUCTURES LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .