| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC VILL JADAINEE HATHNI KI DHATO P O BYCHARI VIA TOTU TEHSIL DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 171001 | ₹24.7 L Quoted ₹24.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.7 L+₹90,781.69 (3.67%)Rejected-Finance | ₹25.7 L+₹90,781.69 (3.67%) | L2 | Rejected-Finance L2 |
| 3 | L3₹25.8 L+₹1.1 L (4.37%)Rejected-Finance | ₹25.8 L+₹1.1 L (4.37%) | L3 | Rejected-Finance L3 |
| 4 | L4₹26.5 L+₹1.7 L (6.91%)Rejected-Finance | ₹26.5 L+₹1.7 L (6.91%) | L4 | Rejected-Finance L4 |
| 5 | L5₹28.6 L+₹3.8 L (15.5%)Rejected-Finance | ₹28.6 L+₹3.8 L (15.5%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Parmod Kumar Thakur L1 | Surinder Singh Verma L4 | Virender Pundir L6 | Kamlesh Kumar L7 | Satya Prakash L5 | Rahul Thakur L2 | HARSHIT SHARMA L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work in all kinds of soil such as pick work, jumper work, blasting work and chiselling work etc. and disposal of excavated earth as directed within all leads and lifts. | 15.93 | Cum | 290 ₹4,619.7 | 450 ₹7,168.5 | 250 ₹3,982.5 Lowest | 450 ₹7,168.5 | 350 ₹5,575.5 | 400 ₹6,372 | 250 ₹3,982.5 Lowest |
| 2.00 | Excavation in foundation, trenches,etc. in earth work in all kinds of soil such as pick work, jumper work,blasting work, hard blasting and chiselling etc. stacking the excavated soil not more than 3 mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinths sides of foundations etc.then disposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts.complete in all respect and to the entire satisfaction of the Engineer-in-charge. | 10.99 | Cum. | 325 ₹3,571.75 | 450 ₹4,945.5 | 450 ₹4,945.5 | 300 ₹3,297 Lowest | 600 ₹6,594 | 525 ₹5,769.75 | 300 ₹3,297 Lowest |
| 3.00 | Excavation in drains and channels etc. in earth work for pipes upto all depth in all classification of earth work such as pick work, jumper work, saturated soil i/c balling or pumping out water , blasting soft /hard rock or chiseling soft/ hard rock where blasting is prohibited in all lifts including jungle clearance wherever required, trimming and dressing of sides, levelling of beds to correct grade including shoring /struting, planking, timbering and dewatering wherever required stacking the useable /unusable material/soil seperately and after laying,jointing and testing of pipes ,returning the useable soil in treches in 15 cm layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and including cost of diversion for traffic, night signals, fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respect whithin all leads and lifts as per direction of the Engineer-in-charge. | 1,770 | Cum | 296 ₹5,23,920 | 360 ₹6,37,200 | 500 ₹8,85,000 | 270 ₹4,77,900 Lowest | 515 ₹9,11,550 | 293 ₹5,18,610 | 350 ₹6,19,500 |
| 4.00 | Providing and laying cement concrete 1:4:8 (1cement: 4sand: 8graded stone agg. 40mm nominal size) and curing complete excluding cost of form work i/c all leads and lifts in foundation and plinth. | 2.89 | Cum. | 7,500 ₹21,675 | 7,000 ₹20,230 | 11,000 ₹31,790 | 5,500 ₹15,895 Lowest | 7,500 ₹21,675 | 7,500 ₹21,675 | 7,000 ₹20,230 |
| 5.00 | Providing. and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 0.9 | Cum. | 7,000 ₹6,300 | 6,500 ₹5,850 | 9,000 ₹8,100 | 5,200 ₹4,680 Lowest | 7,000 ₹6,300 | 7,050 ₹6,345 | 6,500 ₹5,850 |
| 6.00Prov. and laying cement concrete work 1:1:2(1cement:1 and:2 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement in reinforced concrete work i/c all leads and lifts complete in all respect. | ||||||||||
| 6.01 | Foundation and plinth. | 2.79 | Cum. | 10,500 ₹29,295 | 10,200 ₹28,458 | 14,000 ₹39,060 | 6,000 ₹16,740 Lowest | 10,800 ₹30,132 | 10,800 ₹30,132 | 10,000 ₹27,900 |
| 6.02 | Walls (any thickness) but not less than 0.1 m thickness) including attached pillasters,buttresses, plinth and string courses etc.from top of foundation level upto floor two level. | 4.32 | Cum. | 10,500 ₹45,360 | 10,500 ₹45,360 | 14,000 ₹60,480 | 2,800 ₹12,096 Lowest | 10,900 ₹47,088 | 10,900 ₹47,088 | 10,000 ₹43,200 |
| 7.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting , strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | ||||||||||
| 7.01 | Foundations footings, basis of columns and the like and mass concrete. | 3.21 | Sqmt. | 300 ₹963 Lowest | 300 ₹963 Lowest | 450 ₹1,444.5 | 1,300 ₹4,173 | 313 ₹1,004.73 | 300 ₹963 Lowest | 300 ₹963 Lowest |
Tender Value
₹32.3 L
EMD Value
₹56,000
Closing Date
9 Feb 2026, 5:00 pmClosed
Executive Engineer
Jal Shakti Division No-I Kasumpati Shimla-9
.
2026_HPIPH_126940_1
Kasumpti/ Shimla/ GWSS Gusan/ 32.30
Open Tender
Civil Works - Water Works
Item Rate
180 days
Shimla
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,500
EE Jal Shakti Division No-I Kasumpati Shimla-9
₹56,000
16 Apr 2026
29 Jan 2026
10 Feb 2026
29 Jan 2026
9 Feb 2026
29 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in all kinds of soil such as pick work, jumper work, blasting work and chiselling work etc. and disposal of excavated earth as directed within all leads and lifts. | 15.93 | Cum | 100 | ₹1,593 |
| 2 | Excavation in foundation, trenches,etc. in earth work in all kinds of soil such as pick work, jumper work,blasting work, hard blasting and chiselling etc. stacking the excavated soil not more than 3 mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinths sides of foundations etc.then disposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts.complete in all respect and to the entire satisfaction of the Engineer-in-charge. | 10.99 | Cum. | 100 | ₹1,099 |
| 3 | Excavation in drains and channels etc. in earth work for pipes upto all depth in all classification of earth work such as pick work, jumper work, saturated soil i/c balling or pumping out water , blasting soft /hard rock or chiseling soft/ hard rock where blasting is prohibited in all lifts including jungle clearance wherever required, trimming and dressing of sides, levelling of beds to correct grade including shoring /struting, planking, timbering and dewatering wherever required stacking the useable /unusable material/soil seperately and after laying,jointing and testing of pipes ,returning the useable soil in treches in 15 cm layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and including cost of diversion for traffic, night signals, fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respect whithin all leads and lifts as per direction of the Engineer-in-charge. | 1,770 | Cum | 100 | ₹1,77,000 |
| 4 | Providing and laying cement concrete 1:4:8 (1cement: 4sand: 8graded stone agg. 40mm nominal size) and curing complete excluding cost of form work i/c all leads and lifts in foundation and plinth. | 2.89 | Cum. | 100 | ₹289 |
| 5 | Providing. and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 0.9 | Cum. | 100 | ₹90 |
| 6Prov. and laying cement concrete work 1:1:2(1cement:1 and:2 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement in reinforced concrete work i/c all leads and lifts complete in all respect. | |||||
| 6.01 | Foundation and plinth. | 2.79 | Cum. | 100 | ₹279 |
| 6.02 | Walls (any thickness) but not less than 0.1 m thickness) including attached pillasters,buttresses, plinth and string courses etc.from top of foundation level upto floor two level. | 4.32 | Cum. | 100 | ₹432 |
| 7Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting , strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | |||||
| 7.01 | Foundations footings, basis of columns and the like and mass concrete. | 3.21 | Sqmt. | 100 | ₹321 |
stage.html
html • 0.06 MB
technical_187326.pdf
techsummary_187326.pdf
finance_187326.pdf
BOQ Comparative Chart
xlsx
finsummary_187326.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_187326.xls
BOQ • 0.30 MB
Form6.pdf
Tender Documents • 0.48 MB
form8.pdf
Tender Documents • 0.91 MB
Terms.pdf
Tender Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .