Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.4 L+₹21,203.59 (5.01%)Admitted-Fee/PreQual/Technical/Finance AT WORDNO 15 PS BOUCH TOAN DIST BOUCH PIN 762014 | BOUDH | ODISHA | 762014 | +5.00% | ₹4.4 L+₹21,203.59 (5.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.2 L
EMD Value
₹4,232
Closing Date
12 Jun 2026, 5:00 pmClosed
The Executive Officer, Balangir Municipality
Office of the Municipal Council, Balangir
Toilet and Bathroom work
2026_ORULB_130341_97
BLGRMPTY/04(01-107)/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Balangir
Please refer Tender Documents
2 documents required · 2 mandatory
₹2,000
₹4,232
Yes
20 Jul 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in hard soil within initial lead and lift inclusive levelling the edge and bed inclusive all cost complete. | - | Cum | 276.89 | - |
| 2 | Filling F&P with sand well watered and rammed with cost of all labour T&P etc complete. | - | Cum | 596.67 | - |
| 3 | Cement concrete (1:4:8) with 4cm size hard granite metal including watering curing and cost of all labour T&P etc complete. | - | Cum | 5,391.72 | - |
| 4 | Fly Ash brick masonry in C.M.(1:6) in F & P including s.plays, cutting, circular molding with cost, conveyance and taxes, royalty, labour, T&P etc. complete. Foundation and Plinths | - | Cum | 5,513.85 | - |
| 5 | Superstructure | - | Cum | 5,547.18 | - |
| 6 | RCC work of M20 grade with 20mm and downgraded black granite(Crusher broken) stone chips including watering curing and cost of all labour T&P etc complete. | - | Cum | 5,875.52 | - |
| 7 | Rigid smooth centering shuttering for C.C.work including all cost and as per specification etc complete Column Base & Footing Plinth Band | - | Sqm | 248.67 | - |
| 8 | Column & Beam | 1 | Sqm | 1,192.56 | ₹1,192.44 |
| 9 | Lintel | - | Sqm | 568.34 | - |
| 10 | Slab | 1 | Sqm | 762.09 | ₹762.01 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 0.77 MB
BOQ_593792.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .