Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -32.01% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | -25.00% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | -21.00% | ₹1.7 L | L3 | Admitted-Finance |
| 4 | L4₹1.9 LAdmitted-Finance | -6.89% | ₹1.9 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non-responsive |
Tender Value
₹2.1 L
EMD Value
₹4,180
Closing Date
19 Jan 2026, 3:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Construction of manholes at various locations for irrigation pipe line Tulip Garden Srinagar.
2026_PWDJK_300367_9
Nit-73e-tend/2025-26/11462-69 dtd.10-01-2026
Open Tender
Civil Works
30 days
Tulip Garden Srinagar.
as per nit
2 documents required · 2 mandatory
₹200
Executive Engineer RNb Dalgate DIvision Sgr
₹4,180
28 Jan 2026
10 Jan 2026
20 Jan 2026
11 Jan 2026
19 Jan 2026
11 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil.
Supplying and laying of Nallah Dry stone soling hand packed tightly including ramming, watering and filling of interstices including all carriages complete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in: Cement mortar 1:4 ( 1 cement : 4 coarse sand)
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded
Carriage of materials from source to site of work by mechanical means.
a) Sand and stone aggregate for an avg. lead of 15 Kms
b) Bricks avg. lead of 40 Kms.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_974409.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid