Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹31.5 L M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice) | M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice) | L1 | |
| 2 | L2₹32.2 L+₹70,962 (2.26%) M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice) | M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice) | L2 | |
| 3 | L3₹34.6 L+₹3.1 L (9.84%) M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice) | M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice) | L3 | |
| 4 | L4₹43.0 L+₹11.5 L (36.5%) M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice) | M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice) | L4 |
| Sl No | Description | Qty | Unit | N K Prasad Contractor L4 | ANIL KUMAR L3 | Raj Kumar L1 | FAHED MALIK L2 |
|---|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -8 ₹42,95,109 | -25.99 ₹34,55,229 | -32.62 ₹31,45,701 Lowest | -31.1 ₹32,16,663 |
Tender Value
₹46.7 L
EMD Value
₹93,372
Closing Date
3 Feb 2026, 5:30 pmClosed
AE-C-4
Executive Engineer
Office of Executive Engineer-1, CPWD, Kennedy Cottage Shimla-171004
M/R to DPRA under Phagli Section, Shimla during 2025-26. SH: Repair/renovation of existing open plyay area including covering of open area with M.S. structure, roofing, flooring covering of sides at Lalpani, Shimla (H.P.) (Short Notice)
141789
270/2025-26/EE-1/AE-IV/Shimla (Recall)
OPEN
Maintenance
NCB
60 days
Shimla, Himachal Pradesh
10 documents required · 10 mandatory
₹93,372
Not Applicable
3 Feb 2026
30 Jan 2026
3 Feb 2026
3 Feb 2026
2 Feb 2026
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index.pdf
document • 1.09 MB
Notice+Inviting+Tender.pdf
document • 1.59 MB
Performa+for+Quoting+the+rates.pdf
document • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .