| 1 | L1₹24.3 LAccepted-AOC KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹24.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.9 LRejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹24.9 L | L2 | Rejected-Finance As per TCR |
| 3 | L3₹25.1 LRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹25.1 L | L3 | Rejected-Finance As per TCR |
| Sl No | Description | Qty | Unit | BABLU SINHA L1 | SABIR CONSTRUCTION L2 | NANDI ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Old 29no substation with all electrical switch and cables. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | disconnection of all VCB and cable from surface and underground | 24 | Manshift | 1,280.95 ₹30,742.8 | 1,310.2 ₹31,444.8 | 1,320.9 ₹31,701.6 |
| 1.02 | Transportation of total 2 nos of VCB from B1B2 substation to 0 no golai to load at french trolley | 42 | Manshift | 1,280.95 ₹53,799.9 | 1,310.2 ₹55,028.4 | 1,320.9 ₹55,477.8 |
| 1.03 | loading of all 02 noso f VCB on french trolley and transportation upto surface workshop (two nos at a time) | 10 | Manshift | 1,280.95 ₹12,809.5 | 1,310.2 ₹13,102 | 1,320.9 ₹13,209 |
| 1.04 | Salvaging of 350 of 70sqmm, 6.6kv grade HT cable from 29L to 38L upto surface | 108 | Manshift | 1,280.95 ₹1,38,342.6 | 1,310.2 ₹1,41,501.6 | 1,320.9 ₹1,42,657.2 |
| 1.05 | Transportation of 03 nos FLP ACB transportation upto surafce | 36 | Manshift | 1,280.95 ₹46,114.2 | 1,310.2 ₹47,167.2 | 1,320.9 ₹47,552.4 |
| 1.06 | Dismantling of transwitch primary VCB from nd loading on small trolley | 10 | Manshift | 1,280.95 ₹12,809.5 | 1,310.2 ₹13,102 | 1,320.9 ₹13,209 |
| 1.07 | Transportation of transwitch primary VCb from 29L/7D to 0 no golai | 28 | Manshift | 1,280.95 ₹35,866.6 | 1,310.2 ₹36,685.6 | 1,320.9 ₹36,985.2 |
| 1.08 | Transportation of transwitch primary VCb from 0 no golai to surface | 10 | Manshift | 1,280.95 ₹12,809.5 | 1,310.2 ₹13,102 | 1,320.9 ₹13,209 |
| 1.09 | Salvaging and transportation of on 315KVA, 6.6kV 550V transwitch unit from 29 no substation to 0 no golai | 108 | Manshift | 1,280.95 ₹1,38,342.6 | 1,310.2 ₹1,41,501.6 | 1,320.9 ₹1,42,657.2 |
Tender Value
₹24.3 L
EMD Value
₹30,500
Closing Date
13 Jan 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Salvaging of 29 no substation and 38 substation of RIV seam of Khottadih Colliery and Shifting of Power for LHD District from 35 Substation to 57R Substation in RVI seam of Khottadih Colliery
2026_ECL_350476_1
GM-PND/EandM/25-26/237/1231 dated 01/01/2026
Open Tender
Electrical and Maintenance Works
60 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹30,500
13 Feb 2026
3 Jan 2026
14 Jan 2026
3 Jan 2026
13 Jan 2026
3 Jan 2026
3 Jan 2026 - 6 Jan 2026
Old 29no substation with all electrical switch and cables. (Inclusive of EPF/CMPF)
disconnection of all VCB and cable from surface and underground
Transportation of total 2 nos of VCB from B1B2 substation to 0 no golai to load at french trolley
loading of all 02 noso f VCB on french trolley and transportation upto surface workshop (two nos at a time)
Salvaging of 350 of 70sqmm, 6.6kv grade HT cable from 29L to 38L upto surface
Transportation of 03 nos FLP ACB transportation upto surafce
Dismantling of transwitch primary VCB from nd loading on small trolley
Transportation of transwitch primary VCb from 29L/7D to 0 no golai
Transportation of transwitch primary VCb from 0 no golai to surface
Salvaging and transportation of on 315KVA, 6.6kV 550V transwitch unit from 29 no substation to 0 no golai
Loading of 315KVA, 6.6kV /550v Transwitchon french trolley and transportation upto surface
Salvaging of lighting panel and lights
Old 38no substation with all electrical switch and cables. (Inclusive of EPF/CMPF)
Disconnection of transformer incoming power and disconnection of transformer Primary VCB
Transportation of transwitch primary VCb from 38L/7D to 0 no golai
Transportation of transwitch primary VCb from 0 no golai to surface
Salvaging and transportation of on 315KVA, 6.6kV 550V transwitch unit from 38 no substation to 0 no golai
Loading of 315KVA, 6.6kV /550v Transwitchon french trolley and transportation upto surface
Transportation of 03 nos FLP ACB transportation upto surafce
Salvaging of 250 of 70sqmm, 6.6kv grade HT cable from 29L to 38L upto surface
salvaging of 250mtr 70sqmm 3.3kv grade PVC cable from 38 substation to surface
Salvaging of lighting panel and lights
Oxygen Cylinder
DA Cylinder
GI Wire
Shifting of power for LHD District in RVI seam from 35 substation to 57R substation in R-VI seam. (Inclusive of EPF/CMPF)
Transportation and Handling of 01 no. VCB of 6.6kV, 75A/5A CTR from surface to 57R dist subs in R-VI seam
Transportation and Handling of 01 no. 315kVA, 6.6kV/550V TSU from surface to 57R dist subs in R-VI seam
Transportation and Handling of Transwitch primary VCB of 6.6kV from surface to 57R dist subs in R-VI seam
Coupling of transwitch with its primary VCB and fitting of transwiitch unit
Transportation and Handling of 02 nos. ACB from surface to to 57R dist subs in R-VI seam
Transportation and Handling of 25sqmm, 650mtr, 6.6kV grade PVCDWA Cable from surface to to 57R dist subs in R-VI seam
Transportation and Handling of Coupler, Cable Entry Box , Short Piece Cables 02 nos. FLP lights etc. from surface to to 57R dist subs in R-VI seam
Power Establishment from 35L Substation to 57R dist substation by laying cable
shifting of 650mtr 70sqmm, 3.3kV grade cable of LHD224 from 35substation to 57R substation and connection
shifting of 250mtr 70sqmm, 3.3kV grade cable of LHD217 from 35substation to 57R substation and connection
shifting of 650mtr 35sqmm, 3.3kV grade cable of UDM 230 from 35substation to 57R substation and connection
Transportation and Handling of 01 no. Lighting Panel, lighting cables, lights and Lt cable entry boxe etc. from from surface to 57R dist subs in R-VI seam
Hanging of all LT and HT cable
Lifting of two nos of Burnt Transwitch unit from 35substation and district substation of RVI seam to surface
Liquid M-seal Compound with Hardner (Electrical Installation for splicine cabl from 600V to 69KV)
Steel Wire mesh Braid
Flat Braid Tinned Copper
HT tape
Cello tape
GI wire
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_363224.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid