| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAccepted-AOC | ₹31.9 L | L1 | Accepted-AOC BEING LOWEST BIDDER |
| 2 | L2₹33.5 L+₹1.6 L (5.07%)Rejected-AOC | ₹33.5 L+₹1.6 L (5.07%) | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER |
| 3 | L3₹37.5 L+₹5.6 L (17.5%)Rejected-AOC | ₹37.5 L+₹5.6 L (17.5%) | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER |
| 4 | L4₹38.4 L+₹6.5 L (20.4%)Rejected-AOC | ₹38.4 L+₹6.5 L (20.4%) | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | SHARMA CONSTRUCATION COMPANY L4 | MAJOR REFREGERATION AND ELECTRICALS L1 | BHADU BUILDERS L3 | singh enterprises L2 |
|---|---|---|---|---|---|---|---|
| .10Notes:- (i) 100 percent nonperishable items of the work shall be deposited by the L1 bidder within 30 days after placing of work order. (ii) The critical path network shall be submitted by L1 bidder immediately after the acceptance of tender and approved by GE. (iii) The bidders must ensure to visit the site, check relevant documents and makes of materials required to be incorporated under the subject from concern Engineer-in-Charge. (iv) The unserviceable material obtained under the schedule of credit shall be handed over to the contractor by the Engineer-in-Charge on a proper gate pass. (v) In case of non-availability of any make mentioned under list of Makes, the L1 Bidder shall obtain non-availability / non-manufacturing certificate from the concern OEM / authorised dealers and submitted to Accepting Officer, the L1 bidder may be incorporated Group-I category makes as approved by HQ CE SWC Jaipur and HQ CE BTZ in the works after prior approval of Accepting Officer. (vi) L1 Bidder shall produce E-way bill alongwith test certificate from OEM / manufacturer for costly items / major items of amount above Rs 50,000/- along with RAR’s and Final Bill. (vii) L1 Bidder shall be maintained an album containing Photos of all the material brought at site and each stage wise work progress and kept at site. Same shall be deposited in Engineer-in-Charge office after completion of work. (viii) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder.viii) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder. (ix) If a bidder observes any item in the BOQ that appears to be "Freakishly Low" or technically not required for execution at the site, the bidder must submit written comments to the Accepting Officer during the pre-tender stage or at least 07 days before the Bid Submission Start Date. (x) Any act by the contractor that is found to be against the interest of the Department,or commits misconduct or any complaint received through proper channels and supported by verifiable proof (e.g., fraudulent vouchers, negligence in execution, or attempt to cause undue benefit), shall be treated as a willful default.Such defaults shall render the contractor liable for an Adverse Remark ("NO") in the Quarterly Work Load Return (WLR), barring the firm and its related/sister concerns from participating in further tenders. | |||||||
| 1.00 | M&L for repair to centrifugal pump capacity 150 / 125 HP by disconnecting from foundation, strip opening and replacement of unserviceable parts such as impeller, bushes, shaft sleeve, gland plate, gasket packing, studs bolts, nuts, washer etc. including repair to bearing seat and lathe work, turning, grinding, filling of material, finishing etc. on shaft and shaft key way as required including greasing/oiling and re-assembling the pump with proper alingnment with motor and testing complete all as specified and directed by Engineer-in-Charge.
Note :- (i) Major items like impeller, bearing, bush, gland plate, tyre coupling, coupling assembly shall be measured and paid for separately under respective items of BOQ as “Supply only”.
(ii) Cost for transportaion to workshop and carry back to site after repair is inlcuded in the unit rate of item nothing extra shall be paid on this acount. | 4 | Each | 5,000 ₹20,000 | 4,200 ₹16,800 | 6,000 ₹24,000 | 4,000 ₹16,000 Lowest |
| 1.01 | All as per item No 1.00 above but servicing of centrifugal pump 100 / 75 HP | 6 | Each | 4,000 ₹24,000 | 3,500 ₹21,000 | 4,200 ₹25,200 | 3,000 ₹18,000 Lowest |
| 1.02 | All as per item No 1.00 above but servicing of centrifugal pump 60 / 50 /40/30/25/20HP | 10 | Each | 2,000 ₹20,000 Lowest | 2,500 ₹25,000 | 2,500 ₹25,000 | 2,000 ₹20,000 Lowest |
| 1.03 | All as per item No 1.00 above but servicing of centrifugal pump 15 / 12.5/10 HP | 6 | Each | 1,900 ₹11,400 | 1,200 ₹7,200 Lowest | 1,500 ₹9,000 | 2,500 ₹15,000 |
| 1.04 | All as per item No 1.00 above but servicing of monoblock pumpset 1 HP to 7.5 HP | 6 | Each | 900 ₹5,400 Lowest | 900 ₹5,400 Lowest | 1,000 ₹6,000 | 1,500 ₹9,000 |
| 2.00 | Supply only CI impeller suitable for centrifugal Pump set capacity 150 / 125 HP motor complete all as specified and directed by Engineer-in-charge. | 2 | Each | 7,000 ₹14,000 | 4,500 ₹9,000 Lowest | 8,500 ₹17,000 | 10,000 ₹20,000 |
| 2.01 | All as per serial item No 2 here-in-above but centrifugal pump capacity 100 / 75 HP | 2 | Each | 5,500 ₹11,000 | 3,800 ₹7,600 Lowest | 5,000 ₹10,000 | 9,500 ₹19,000 |
| 2.02 | All as per serial item No 2 here-in-above but centrifugal pump capacity 60 / 50 HP | 2 | Each | 3,200 ₹6,400 Lowest | 3,500 ₹7,000 | 3,500 ₹7,000 | 8,500 ₹17,000 |
| 2.03 | All as per serial item No 2 here-in-above but centrifugal pump capacity 40 / 30 HP | 2 | Each | 2,900 ₹5,800 Lowest | 3,200 ₹6,400 | 3,000 ₹6,000 | 4,500 ₹9,000 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
21 Jul 2026, 6:00 pmClosed
GE (A) SURATGARH
GE (A) SURATGARH MIL STATION
REPAIR/MAINT/ REPLACEMENT OF WATER SUPPLY MOTOR PUMP SET AND CONNECTED ITEMS UNDER GE (A) SURATGARH AT SURATGARH MIL STN
2026_MES_773852_1
GE(A)/SOG-TOKEN-26/2026-27
Open Tender
Civil Works - Water Works
Item Rate
120 days
IN THE AOR OF GE (A) SURATGARH
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE(A) SURATGARH
₹70,000
Yes
12 Sept 2026
20 Jun 2026
23 Jul 2026
20 Jun 2026
21 Jul 2026
7 Jul 2026
20 Jun 2026 - 4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for repair to centrifugal pump capacity 150 / 125 HP by disconnecting from foundation, strip opening and replacement of unserviceable parts such as impeller, bushes, shaft sleeve, gland plate, gasket packing, studs bolts, nuts, washer etc. including repair to bearing seat and lathe work, turning, grinding, filling of material, finishing etc. on shaft and shaft key way as required including greasing/oiling and re-assembling the pump with proper alingnment with motor and testing complete all as specified and directed by Engineer-in-Charge.
Note :- (i) Major items like impeller, bearing, bush, gland plate, tyre coupling, coupling assembly shall be measured and paid for separately under respective items of BOQ as “Supply only”.
(ii) Cost for transportaion to workshop and carry back to site after repair is inlcuded in the unit rate of item nothing extra shall be paid on this acount. | 4 | Each | - | - |
| 1.01 | All as per item No 1.00 above but servicing of centrifugal pump 100 / 75 HP | 6 | Each | - | - |
| 1.02 | All as per item No 1.00 above but servicing of centrifugal pump 60 / 50 /40/30/25/20HP | 10 | Each | - | - |
| 1.03 | All as per item No 1.00 above but servicing of centrifugal pump 15 / 12.5/10 HP | 6 | Each | - | - |
| 1.04 | All as per item No 1.00 above but servicing of monoblock pumpset 1 HP to 7.5 HP | 6 | Each | - | - |
| 2 | Supply only CI impeller suitable for centrifugal Pump set capacity 150 / 125 HP motor complete all as specified and directed by Engineer-in-charge. | 2 | Each | - | - |
| 2.01 | All as per serial item No 2 here-in-above but centrifugal pump capacity 100 / 75 HP | 2 | Each | - | - |
| 2.02 | All as per serial item No 2 here-in-above but centrifugal pump capacity 60 / 50 HP | 2 | Each | - | - |
| 2.03 | All as per serial item No 2 here-in-above but centrifugal pump capacity 40 / 30 HP | 2 | Each | - | - |
| 2.04 | All as per serial item No 2 here-in-above but centrifugal pump capacity 25 / 20 HP | 1 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_866505.xls
BOQ • 1.27 MB
T26.pdf
Tender Documents • 1.09 MB
datecori.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .