| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.0 LAccepted-AOC | L1 | Accepted-AOC Lowest hence accepted | |
| 2 | L2₹34.8 L+₹1.7 L (5.27%)Rejected-AOC | L2 | Rejected-AOC Not lowest | |
| 3 | L3₹35.2 L+₹2.1 L (6.48%)Rejected-AOC | L3 | Rejected-AOC Not lowest | |
| 4 | L4₹39.5 L+₹6.5 L (19.7%)Rejected-AOC | L4 | Rejected-AOC Not lowest | |
| 5 | L5₹42.5 L+₹9.4 L (28.6%)Rejected-AOC | L5 | Rejected-AOC Not lowest |
Tender Value
₹39.5 L
EMD Value
₹79,000
Closing Date
15 Apr 2020, 6:00 pmClosed
GE GOLCONDA
GE GOLCONDA LANGERHOUSE OPP MILITARY HOSPITAL HYDERABAD TELANGANA
COMPREHENSIVE MAINT AND OUTSOURCING OF WATER SUPPLY INSTALLATIONS AT IB LINE AREA TARAMATI 7 MILE AREA AND 9 MT AREA AT ARTY CENTRE AREA UNDER GE GOLCONDA
2020_MES_336291_1
CA No. GE/Gol/Token 38 of 2019-20
Open Tender
Civil Works
Item Rate
GE GOLCONDA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
₹79,000
Yes
29 Jun 2020
25 Mar 2020
17 Apr 2020
25 Mar 2020
15 Apr 2020
7 Apr 2020
25 Mar 2020 - 4 Apr 2020
Amount
Out Sourcing of services for IB line(old & New) area pump house employing with One FGM for operating 2x40 HP capacity and 3x15 HP capacity of Centrifugal pumps, 1x100 KVA DG Set for the Pump house, pumping of water to the OH/UG sumps at 2.5 LG OH tank at IB line area, 0.5 LG OHR O/S MKD, 0.5 LG OHR I/S MKD, 0.5 LG OHR IB line, 0.5 LG OHR Taramati tanks, U/G sumps / OH Tanks as directed incl operation of connected valves, and maintenance/upkeeping of valves, including monitering and taking water from Saikhpet and Bojagutta pipe lines and distribution water to all connected OH Tanks and UG sumps of the IB lines and Taramati area in a shift of 08 hrs duration 03 shift in a day including all Sundays & Holidays , all as specified and directed by Engr-in-charge. Note :- DHPP shall be issued under schedule 'B' free for filling only. Note:- (a) Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01 per shift) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 per shift) (iii) IIIrd shift: 2200 hrs to 0600 hrs(FGM-01 per shift)
All as per item No.01 but for operation of 7th mile & Taramati area Pump house comprising of 2x10 HP & 2 x 15 HP capacity of pumps, distribution lines, 0.50 LG UG sump including monitering and taking water from IB line pump house. Note:- (a) Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01 Per Shift) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 per Shift) (iii) 3rd shift 2200 hrs to 0600 hrs(FGM-01 per Shift)
All as per item No.01 but for operation of I/S MKD & Offrs Qtrs area pump house comprising of 2x7.5 HP and 01 x 1.5 HP capacity centrifugal pump sets , distribution lines, 0.50 LG UG sump including monitering and taking water from HMWS S&B Sheikpet pumphouse, IB line pump house. Note :- DHPP shall be issued under schedule 'B' free for filling only. Note:- (a) Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01 per shift) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 per shift) (iii) IIIrd shift: 2200 hrs to 0600 hrs(FGM-01 per shift)
All as per item No.01 but for operation of JCO Mess pump House & Firing range pump house,Arty center comprising of 01 x 10 HP, 1 x 3 HP capacity of Centrifugal pumps, 1 x 40 KVA DG set and 0.1 LG sump and 0.25 LG sump including monitering and taking water from IB line pump house. Note :- DHPP shall be issued under schedule 'B' free for filling only. Note:- (a) Shift timming are as under:- (i) Ist Shift 0600 hrs to 1400 hrs(FGM-01 per shift) (ii) 2nd shift 1400 hrs to 2200 hrs(FGM-01 per shift)
GENERAL NOTES FOR ITEM NO -01 TO 04 :- (i) The FGM has to ensure proper satisfactory collection and distribution of water to all the users incl up keep the installation. (ii) Minor repairs such as gland rope, gland packing etc are deemed to be included in above scope of work. (iii) Proper chloronium level are to be maintained and entered in the register. (iv) Contractor should ensure to provide and maitain Attendance register, Log sheet and duty roasters properly and submit to Engr-in-Charge as required. (v) Shift timings will be decided by the Engineer-in- incharge. (vi) The contrctor has to supply uniform to their employees for wearing during working hours. (vii) The minimum qualification for the operator(s) employed by the contractor shall be diploma/ITI certificate holder in relevent trade or 12th pass with minimum 3years experience or 10th pass with 5years experience in the operation of electrical installations and equipements. (viii) The above mentioned job will be carried out as per the Indian labour Law and factory act 1948 only. (ix) Contractor should ensure to provide Qualified Supervisor to visit the installations on daily basis and inform defects/problems if any in writing to Engr-in-Charge.
GENERAL NOTES FOR ITEM NO -01 TO 04 (Contd..):- (x) The Contractor shall be provided Mobile phones to the Manpower on duty. (xi) If any individual is absent from duty, a penal recovery shall be recorved form the Contractor. (xii) The operator should not leave the installations till the next releaver does not take the charge of installaion. (xiii) The operator will be responsible for cleanliness and necessary upkeeping of installations, including grass cutting and cutting of small branches of surrounding area upto 5m fromthe installaions. (xiv) The operator should have necessary tool kits (i.e., digital multimeter, Clamp meter, screw driver set of each sizes, Line Tester, combination and cutting pliers, cutting knife, hand gloves, suitable for available voltages and test lamp with conductor and holder etc.) available with him every time. (xv) the operator should be free from the habbits of any addiction such as liquor, smoking and other drugs .(xvi) contractor should ensure to provide and maintain water supply meter reading in their respective areas and submit same to Engr-in-charge as required.
M/s Pal Construction
Sri Surya Enterprises
Sri Lakshmi Enterprises
MOHAMMED MUMTAZ ENGINEERING WORKS
Sri Associates
M/S Veerabhadra Constructions
M/s GM Constructions
Srinivasa Consructions
stage.html
html • 0.07 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .