| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Rejected-Technical | Rejected-Technical Disqualified |
| 4 | Rejected-Technical | Rejected-Technical Disqualified |
Tender Value
₹46.4 L
EMD Value
₹2.3 L
Closing Date
4 Aug 2026, 3:00 pmClosed
Chief Engineer
LDA Gomti Nagar Lucknow
Gomti Nagar Vistar ke Antergat Ahmamau Chauraha per Sultanpur road evam shaheed path service road ke corner per pradhikaran ki khali aviksit land ki leveling evam boundarywall ke nirman ka karya
2026_LDAUP_1172167_1
75/E-Nivida/CE/2026-27_17
Open Tender
Civil Works
Percentage
120 days
Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
Secratary LDA
₹2.3 L
12 Oct 2026
25 Jul 2026
5 Aug 2026
25 Jul 2026
4 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil.DSR 2023- 2.8.1 | 177.19 | Cum | 205.62 | ₹36,433.19 |
| 2 | Arrangement ofHydraulic Excavator (JCB) for Dimolation of Enchorchment @950.00 | 8 | HOUR | 950 | ₹7,600 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).DSR 2023- 4.1.8 | 29.53 | Cum | 5,381.16 | ₹1,58,916.42 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) including manufactured sand derived from Recycled Concrete Aggregate (RCA) up to 20% : 3 graded stone aggregate 20 mm nominal size of Recycled Concrete Aggregate (RCA) up to 20%)DSR 2023- 5.1.2A | 18.9 | Cum | 7,010.8 | ₹1,32,504.12 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 2023- 5.1.2 | 58.44 | Cum | 7,145.72 | ₹4,17,581.59 |
| 6 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level- L.D.A APPRO. | 60.71 | Qtl | 7,150 | ₹4,34,090.8 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1DSR 2023- 5.9.1 | 168 | Sqm | 309.78 | ₹52,043.04 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and StrutsDSR 2023- 5.9.6 | 322 | Sqm | 759.38 | ₹2,44,520.36 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantileversDSR 2023- 5.9.5 | 347.16 | Sqm | 581.72 | ₹2,01,949.92 |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required., In gratings , frames, guard bar , ladder, railings , brackets , gates and similar worksDSR 2023- 10.25.2 | 150 | Kg | 136.35 | ₹20,452.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.10 MB
T2.pdf
Tender Documents • 6.30 MB
BOQ_2201281.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .