| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹58.5 L+₹1.3 L (2.27%)Accepted-AOC SAONAGAON BONGAIGAON MULAGAON BONGAIGAON BONGAIGAON 781038 | KAMRUP METRO | ASSAM | 781038 | ₹58.5 L+₹1.3 L (2.27%) | L2 | Accepted-AOC Awarded |
| 2 | L1₹57.2 LRejected-AOC C O SRI BANAMALI DAS WARD NO 3 THAKURBARI ROAD P O BIJNI DIST CHIRANG ASSAM 783390 | CHIRANG | ASSAM | 783390 | ₹57.2 L | L1 | Rejected-AOC Not Awarded |
| 3 | L2₹58.5 L+₹1.3 L (2.27%)Rejected-AOC | ₹58.5 L+₹1.3 L (2.27%) | L2 | Rejected-AOC Not Awarded |
| 4 | L3₹60.0 L+₹2.8 L (4.89%)Rejected-AOC 3RD FLOOR KRISHNA RICE MILL BUILDING PAGLASTHAN BONGAIGAON 783380 | BONGAIGAON | ASSAM | 783380 | ₹60.0 L+₹2.8 L (4.89%) | L3 | Rejected-AOC Not Awarded |
| 5 | L4₹61.0 L+₹3.8 L (6.64%)Rejected-AOC | ₹61.0 L+₹3.8 L (6.64%) | L4 | Rejected-AOC Not Awarded |
Tender Value
₹65 L
EMD Value
₹1.3 L
Closing Date
8 Feb 2022, 2:00 pmClosed
Director, Directorate of Soil conservation Deptt.,
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHUMI SHANGRAKHAN BHAWAN, R.G.B. ROAD, GUWAHATI-781005
Bhakrapara Kahidoba Water Harvesting cum Water Distribution Project
2022_SCD_24066_16
Tender/NIT/2021-22/4111 Date-13.01.2022
Open Tender
Civil Works
Works
90 days
Barpeta
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹1.3 L
Yes
29 Apr 2022
18 Jan 2022
8 Feb 2022
18 Jan 2022
8 Feb 2022
19 Jan 2022
Amount
PART A
Preparation of site, Removal of mud & cleaning the jungle etc. complete as directed.
E/w. in excavation for making diversion channel including removing the spoil including dressing, grading etc.
E/w. in filling for construction of Coffer Dam in front of head wall by head load with approved quality of soil with all lead & lift, ramming & compacting etc. as directed. leads and lift.
Earth work in excavation of foundation, trenches including filling up the trenches & removal of surplus spoil after & other deleterious matter, dressing of sides and bottom etc. without watering
E/W. below the Gully bed level including bailing out water etc.
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm. nominal size mechanically mixed, placed in foundation and complete by vibration including curing etc.
Providing R.C.C. work with R.C.C. grade M.20 in foundation, abatement of head wall, extension head wall, Apron, side wall of the spill way with gravel 6mm. to 20 mm. size reinforced with proper reinforcement as per design & specification as directed.
Supplying of Reinforcement (TMT) in position to reinforce Cement concrete work including cutting, banding, cranking with hooking, tying with two piles 0.9 mm.(20 S.W.G.) annealed wire as per specification etc. Completes as directed.
Cement plastering 12mm. thick in proper 1:3 including cleaning the surface & curing etc. complete as directed.
Cost of Rapidite Oil for quick setting of R.C.C. work.
E/w. in filling in front of head wall, extension head wall by the side of side wall by head load with approved quality of soil with all lead & lift ramming & compacting etc.
(Boulder laid without wire crates) Providing & laying boulder apron on river bed in front of structure for protection against scouring with stone boulder weighing not less than 40Kg each, complete as per drawing & technical specification.
Construction of earthen guide bund/periphery bund with approved soil/material obtained from borrow pits with all lift & leads, transporting to site, Spreading, grading to required slope etc. complete as directed.
Earth cutting in foundation of boulder revetment
(Boulder laid without wire crates) Providing & laying boulder apron on river bed in front of structure for protection against scouring with stone boulder weighing not less than 40Kg each, complete as per drawing & technical specification.
Construction of earthen guide bund/periphery bund with approved soil/material obtained from borrow pits with all lift & leads, transporting to site, Spreading, grading to required slope etc. complete as directed.
Turfing with sods :- Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other location etc. complete as directed.
Cost of Sign Board with erection cost
PART B
Preparation of site, Removal of mud & cleaning the jungle etc. complete as directed.
E/w. in excavation for making diversion channel including removing the spoil including dressing, grading etc.
E/w. in filling for construction of Coffer Dam in front of head wall by head load with approved quality of soil with all lead & lift, ramming & compacting etc. as directed. leads and lift.
Earth work in excavation of foundation, trenches including filling up the trenches & removal of surplus spoil after & other deleterious matter, dressing of sides and bottom etc. without watering
E/W. below the Gully bed level including bailing out water etc.
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm. nominal size mechanically mixed, placed in foundation and complete by vibration including curing etc.
Providing R.C.C. work with R.C.C. grade M.20 in foundation, abatement of head wall, extension head wall, Apron, side wall of the spill way with gravel 6mm. to 20 mm. size reinforced with proper reinforcement as per design & specification as directed.
Supplying of Reinforcement (TMT) in position to reinforce Cement concrete work including cutting, banding, cranking with hooking, tying with two piles 0.9 mm.(20 S.W.G.) annealed wire as per specification etc. Completes as directed.
Cement plastering 12mm. thick in proper 1:3 including cleaning the surface & curing etc. complete as directed.
Cost of Rapidite Oil for quick setting of R.C.C. work.
E/w. in filling in front of head wall, extension head wall by the side of side wall by head load with approved quality of soil with all lead & lift ramming & compacting etc.
(Boulder laid without wire crates) Providing & laying boulder apron on river bed in front of structure for protection against scouring with stone boulder weighing not less than 40Kg each, complete as per drawing & technical specification.
Earth cutting in foundation of boulder revetment
(Boulder laid without wire crates) Providing & laying boulder apron on river bed in front of structure for protection against scouring with stone boulder weighing not less than 40Kg each, complete as per drawing & technical specification.
Construction of earthen guide bund/periphery bund with approved soil/material obtained from borrow pits with all lift & leads, transporting to site, Spreading, grading to required slope etc. complete as directed.
Turfing with sods :- Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other location etc. complete as directed.
Cost of Sign Board with erection cost
PART C
Earth Work below the Gully bed level including bailing out water etc.
Boulder/Stone masonry work in cement mortar 1:6 with out face stone along the slope of the earthen bund including racking out joints & curing, supplying & carriage of stone complete as directed.
E/w. in filling in front of head wall, extension head wall by the side of side wall by head load with approved quality of soil with all lead & lift ramming & compacting etc.
Construction of earthen periphery bund along river bank with approved soil/material obtained from borrow pits with all lift & leads, transporting to site, Spreading, grading to required slope etc. complete as directed.
Turfing with sods :- Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other location etc. complete as directed.
Cost of Sign Board with erection cost
MR NABAJYOTI BARMAN
Jibon kishore Ray
PADMAVATI CONSTRUCTION
MR DIPAK DAS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .