Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 64 SHANKAR MARRIAGE HOME WEST ARJUN NAGAR AGRA | AGRA | AGRA | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 7C GOVIND NAGAR MATHURA | MATHURA | MATHURA | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 323 SHAMBHU NAGAR SHIKOHABAD DISTRICT FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical UTTAR PRADESH UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
₹14.8 Cr
EMD Value
₹29.6 L
Closing Date
17 Dec 2025, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widening and Strengthening work on 3.75 M. to 5.50 M. of Chhata-Taroli road (ODR) in Distt. Mathura
2025_CEAGR_1098046_1
489114M-AC/2025-26 dated 10-10-2025
Open Tender
Civil Works
Item Wise
365 days
Mathura
Widening and Strengthening
2 documents required · 2 mandatory
₹2,360
₹29.6 L
Yes
Agra
20 Jan 2026
10 Dec 2025
17 Dec 2025
10 Dec 2025
17 Dec 2025
10 Dec 2025
12 Dec 2025
Construction of Road (Including Diversion for Box Culvert Also) Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6).
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MoRT&H clause 305 (3.16) & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. (Carted Earth)
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete and including all machinery charges & including all labour, T&P etc required for proper completion of the work. as directed by Engineer Incharge. As per MoRT&H clause 401(b).
Consolidation of machine crushed stone ballast of approved quarry of 63~45mm size to water bound macadam of G-2 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work as per MORT&H specifications no 404 (4.11A)
Consolidation of machine crushed stone ballast of approved quarry of 53~22.4 mm size to water bound macadam of G-3 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work. as per MORT&H specifications no 404 (4.9).
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.
Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.60 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading-II, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For BC)
Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 509 Complete in all respects. Grading-II
Supply and Laying of 350mm dia NP-3 Pipe etc. complete.
Supply and Laying of 600mm dia NP-3 Pipe etc. complete.
Supply and Laying of 1000mm dia NP-3 Pipe etc. complete.
Construction of RCC Box Culvert (3.00Mtr., 4.00Mtr, 5.00Mtr., & 3.00Mtr. Skew including Retaining wall with Stone Masonry ) Construction of Retaining Wall in separoter of the road with Coursed rubble Stone Masonry in 1:6 Cement & Coarse Sand Mortar including all labour and T&P etc. complete. As directed by Engineer in charge.
Plain Cement Concrete (PCC Grade M15) in Top of Wall complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MORT&H Specification no. 304 (12.1).
Sand Filling in Foundation Trenches as per Drawing & Technical Specification. As per MORT&H Specification no. 304 (12.03).
PCC 1:3:6 in Foundation of Retaining wall Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8GCase - II
Plain/Reinforced cement concrete (RCC M-30) in sub-structure complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.05
Furnishing and Placing Reinforced/ Prestressed cement concrete (RCC M-30) in super-structure as per drawing and Technical Specification. As per MORT&H Specification no. 14.1C Case II
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications, all complete as per clause 2702. As per MORT&H Specification no. 14.4
Construction of 2x4 Span RCC Minner Brige Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MORT&H Specification no. 304 (12.1).
Sand Filling in Foundation Trenches as per Drawing & Technical Specification. As per MORT&H Specification no. 304 (12.03).
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8GCase - II
Plain/Reinforced cement concrete (RCC M-30) in sub-structure complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.05
Furnishing and Placing Reinforced/ Prestressed cement concrete (RCC M-30) in super-structure as per drawing and Technical Specification. As per MORT&H Specification no. 14.1C Case II
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications, all complete as per clause 2702. As per MORT&H Specification no. 14.4
Common Item for Minor Bridge and Culverts Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level and above plinth levelThermo-mechanically Treated bars of grade Fe-500D or more. DSR No- 5.22A.6
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.8
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. As per MORT&H Specification no. 13.9
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. As per MORT&H Specification no. 13.10
Dismantling R.C.C. work manually by mechenical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as directed by Engineer-In-Charge. As per S.I. no. 15.30
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In mud mortar. As per S.I. no. 15.7.1
Boring with 100 dia casing pipe including lowering & extraction, assembling, loading, unloading & cartage etc (hire charges only).
Empty Cement Bags of good condition (Plastic) filled with Carted Earth including filling, stiching and stacking at side of filling.
Part-B Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Part-B Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 38)
Part-B Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 38)
Part-B Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 38)
Part-B Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 38)
Part-B Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 38)
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done.
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.50 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.52 MB
BOQ_2022120.xls
BOQ • 0.32 MB
SBDAddendumChhataTaroli.pdf
Tender Documents • 2.20 MB
SBDChhata-Taroli.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .