| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Awarded Contract Bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | ABUL FAZAL ABDULLAH L1 |
|---|---|---|---|---|
| 1.00 | Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. | 50 | each | 1,410 ₹70,500 Lowest |
| 2.00 | Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) | 13 | Meter | 1,100 ₹14,300 Lowest |
| 3.00 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | 20 | Meter | 12,100 ₹2,42,000 Lowest |
| 4.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (II) With dewatering (i) Depth upto 3 m | 265.85 | Cum | 145 ₹38,547.53 Lowest |
| 5.00 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) | 168.9 | Metre | 17,900 ₹30,23,310 Lowest |
| 6.00 | Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser, PCC Grade M15 for Pile Cap | 9.43 | Cum | 8,200 ₹77,358.8 Lowest |
| 7.00 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump | 159.73 | Cum | 10,400 ₹16,61,212.8 Lowest |
| 8.00 | Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) | 11.94 | tonne | 88,000 ₹10,50,896 Lowest |
| 9.00 | Integrity testing of pile using low strain / sonic integrity test / Sonic echo test method in accordance with is 14893 including surface preparartion of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results. all complete as per direction of Engineer - in - Charge. Note : The inclusion of the above them to the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. | 4 | Each / Test | 1,095 ₹4,380 Lowest |
| 10.00 | Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, Without plasticiser, RCC Grade M35, With Batching Plant, Transit Mixer and Concrete Pump Height upto 5m | 45.35 | Cum | 12,300 ₹5,57,792.7 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
17 Feb 2026, 2:00 pmClosed
Chief Engineer (EAP), PWRD, Fatasil Ambari, Assam
O/o Chief Engineer (EAP), PWRD, Fatasil Ambari, Guwahati-781025, Assam
CE/EAP/ARRBP/OCB/Bridge 1/Dhubri/20 R.C.C Br no 1by1 on Gorerhat to Bhagaduli Road over Sadbhuni River Channel
2026_PWRDW_50657_3
EAP/ARRBP/02/TENDERS/2024/60
Open Tender
Civil Works - Bridges
Item Rate
540 days
Dhubri district
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,900
₹2.8 L
Yes
O/o Chief Engineer (EAP), PWRD, Fatasil Ambari
22 Jun 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
3 Feb 2026 - 10 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. | - | each | 100 | - |
| 2 | Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) | - | Meter | 100 | - |
| 3 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | - | Meter | 10 | - |
| 4 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (II) With dewatering (i) Depth upto 3 m | - | Cum | 10 | - |
| 5 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) | - | Metre | 10 | - |
| 6 | Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser, PCC Grade M15 for Pile Cap | 1 | Cum | 10 | ₹9.99 |
| 7 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump | 0.8 | Cum | 10 | ₹7.99 |
| 8 | Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) | - | tonne | 10 | - |
| 9 | Integrity testing of pile using low strain / sonic integrity test / Sonic echo test method in accordance with is 14893 including surface preparartion of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results. all complete as per direction of Engineer - in - Charge. Note : The inclusion of the above them to the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. | - | Each / Test | 10 | - |
| 10 | Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, Without plasticiser, RCC Grade M35, With Batching Plant, Transit Mixer and Concrete Pump Height upto 5m | 1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.51 MB
BOQ_80638.xls
BOQ • 0.30 MB
SBD_Dhubri_20.pdf
Tender Documents • 2.49 MB
Drawing_Dhubri_20.pdf
Additional Documents • 1.42 MB
Technical_Specification.pdf
Additional Documents • 2.26 MB
ESMP_Dhubri_20.pdf
Additional Documents • 2.05 MB
AnnexureX_Rebid.pdf
Additional Documents • 1.76 MB
LOT.pdf
Additional Documents • 0.57 MB
LOF.pdf
Additional Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .