Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | -31.33% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | -30.31% | ₹1.7 L | L2 | Admitted-Finance |
| 3 | L3₹1.8 LAdmitted-Finance | -28.20% | ₹1.8 L | L3 | Admitted-Finance |
| 4 | L4₹1.9 LAdmitted-Finance | -23.50% | ₹1.9 L | L4 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
18 Feb 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Bhaderwah
Permanent Restoration for Kassa link road.
2026_PWDJK_302552_2
e-NIT No. 80 of 2025-26 Dt. 07-02-2026
Open Tender
Civil Works
30 days
Bhaderwah
These documents are to be submitted as non-sensitive document from my document area of bidder
3 documents required · 3 mandatory
₹600
Executive Engineer
₹5,000
24 Feb 2026
7 Feb 2026
19 Feb 2026
7 Feb 2026
18 Feb 2026
7 Feb 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Dumping stone including cost of stones in Horizontal on level
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
Carriage of Materials
Sand and Aggregate for an Avg. distance of 32 Kms by MT
Stone for an Avg. distance of 5 Kms by MT
Excavated Mulba for an Avg. distance of 2 Kms ny MT
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_981904.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid