Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.0 LAccepted-AOC | L1 | Accepted-AOC As per lottery M/s Amit Enterprise was declared as Winner-1 | |
| 2 | L1₹96.0 LRejected-AOC AT KHARIAR PO KHARLAR DIST NUAPADA | NUAPADA | ODISHA | 766104 | L1 | Rejected-AOC As per lottery M/s Sanjaya Kumar Agrawal was declared as Winner-2 | |
| 3 | L1₹96.0 LRejected-Finance PLOT NO 315 1802 1914 ROHINI VILLA BANIATANGI BAJAPUR SAI TEMPLE AREA KHURDA KHORDHA ODISHA 752060 | KHORDHA | ODISHA | 752060 | L1 | Rejected-Finance As per lottery held on dt.15.09.2023 at.11.30 AM,M/s Amit Enterprise was declared as Winner-1. | |
| 4 | L2₹1.0 Cr+₹5.6 L (5.88%)Rejected-Finance | L2 | Rejected-Finance As per lottery held on dt.15.09.2023 at.11.30 AM,M/s Amit Enterprise was declared as Winner-1. | |
| 5 | Rejected-Technical | - | Rejected-Technical The schedule F furnished by the bidder in Non judicial stamp paper is not as per the statutory format mentioned in the DTCN. |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
16 Jun 2023, 5:00 pmClosed
CGM PC
IDCO Towers,Janpath, Bhubaneswar
Construction of SFRC Compound Wall Barrier of 2.1mtr Height for both sides of Molten Metal Road at the end of ROW to prevent encroachment, Movement of Cattle and Machineries
2023_IDCO_89447_1
PC/EST/E-28-2023-24
National Competitive Bid
Civil Works - Others
Percentage
90 days
Aluminium Park, Angul
Please refer tender documents.
2 documents required · 2 mandatory
₹11,800
₹1.1 L
Yes
30 Jul 2024
30 May 2023
17 Jun 2023
30 May 2023
16 Jun 2023
30 May 2023
30 May 2023 - 13 Jun 2023
eProcurement System Government of Odisha Created By: Arpita Priyadarshinee Created Date/Time: 12-Sep-2023 04:30 PM Tender Title: Construction of SFRC Compound Wall Barrier of 2.1mtr Height for both sides of Molten Metal Road at the end of ROW to prevent encroachment, Movement of Cattle and Machineries Tender ID: 2023_IDCO_89447_1
Tender Inviting Authority: Chief General Manager (P&C), IDCO.
Name of Work: Construction of SFRC Compound Wall Barrier of 2.1mtr Height For Both Sides of Molten Metal Road at the ROW to Prevent Encroachment, Movement of Cattle and Machineries . (The bidders are required to Quote their rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed)
BID ID No: P&C/EST/E-28/2023-24
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Sanjaya Kumar Agrawal(GSTN-21AGCPA9123G1Z3) 11293220.000 -14.990 9600366.320 Ninty Six Lakh Three Hundred and Sixty Six
2.00 Amit Enterprise(GSTN-21AAQFA6225R1Z2) 11293220.000 -14.990 9600366.320 Ninty Six Lakh Three Hundred and Sixty Six
3.00 UTKAL UDYAN PRIVATE LIMITED(GSTN-21AABCU1101E1ZD) 11293220.000 -14.990 9600366.320 Ninty Six Lakh Three Hundred and Sixty Six
4.00 R.B.S Constructions(GSTN-21AAJFR3660G3ZC) 11293220.000 -9.990 10165027.320 One Crore One Lakh Sixty Five Thousand Twenty Seven
Lowest Amount Quoted BY: Sanjaya Kumar Agrawal,Amit Enterprise,UTKAL UDYAN PRIVATE LIMITED(9600366.320)
BOQ Summary Details Tender Title: Construction of SFRC Compound Wall Barrier of 2.1mtr Height for both sides of Molten Metal Road at the end of ROW to prevent encroachment, Movement of Cattle and Machineries Tender ID: 2023_IDCO_89447_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Sanjaya Kumar Agrawal 9600366.320 L1
2 Amit Enterprise 9600366.320 L1
3 UTKAL UDYAN PRIVATE LIMITED 9600366.320 L1
4 R.B.S Constructions 10165027.320 L2
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .