Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.0 LAccepted-AOC KALIAPPA COMPLEX THRICHY ROAD RANGANATHAPURAM SULUR COIMBATORE 641 402 | COIMBATORE | COIMBATORE | TAMIL NADU | 641402 | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹99.6 L+₹3.5 L (3.66%)Rejected-Finance DOOR NO 6 1 JOTHI NAGAR 6TH STREET VARATHARAJAPURAM UPPLIPALAYAM PO COIMBATORE 641015 | COIMBATORE | COIMBATORE | TAMIL NADU | 641015 | L2 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 3 | L3₹99.6 L+₹3.5 L (3.67%)Rejected-Finance 121004 | L3 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 4 | L4₹1.1 Cr+₹9.3 L (9.71%)Rejected-Finance NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L4 | Rejected-Finance BEING NOT LOWEST TENDER | |
| 5 | L5₹1.1 Cr+₹13.3 L (13.8%)Rejected-Finance 606 80 FEET ROAD 7TH BLOCK 2ND PHASE BANASHANKARI 3RD STAGE BANGALORE 560 085 | BENGALURU URBAN | KARNATAKA | 560085 | L5 | Rejected-Finance BEING NOT LOWEST TENDER |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
13 Nov 2020, 6:00 pmClosed
GE AF SULUR
Garrison Engineer AF Sulur Military Engineer Services Kangayampalayam Post Sulur Coimbatore 641 401
OUTSOURCING FOR MANNING AND OPERATION OF WATER SUPPLY ELECTRIC SUPPLY INSTALLATION AC PLANT REPAIR MAINT OF WATER SUPPLY INSTALLATIONS AND OTHER MISC WORKS AT AF STN SULUR
2020_MES_387436_1
8368/E8
Open Tender
Miscellaneous Works
Item Rate
334 days
GE AF SULUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Yes
GE AF SULUR
₹1.7 L
Yes
19 Dec 2020
17 Oct 2020
14 Nov 2020
17 Oct 2020
13 Nov 2020
7 Nov 2020
17 Oct 2020 - 6 Nov 2020
Amount
SCHEDULE A BOQ
Manning & Operation by providing outsourcing services to Main receiving DWR Sub Stn, MAFI - 1 & 2 Pole Sub Station at Technical Area by employing one Electrician (Skilled) per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, including Sundays & Holidays, comprising the following works :- (i) Monitoring/operatting including replacing blown out fuses, as and when required, of Two/Four pole structure with Air break switches and expulsion fuse units - 2 Nos. (ii) Monitoring/ operatting HT 11 KV VCB/RMU Panels, indoor type - 03 Nos. (iii) Monitoring checking and watering Earthing system. (iv) Monitoring/operating as and when required LT Panel Boards with LT ACB and MCCBs & APFC Panel - 11 Nos (v) Monitoring/operatting Transformers and Isolation transformers - 6 Nos including checking oil level, silica gel in breather and leakage as directed.
Basic rate for (01) one independent Electrician operator in one shift.
Employer's contribution towards EPF for (01) one independent Electrician operator in one shift.
Employer's contribution towards ESIC for (01) one independent Electrician operator in one shift.
Bonus for (01) one independent Electrician operator in one shift.
Overheads and profit for (01) one independent Electrician operator in one shift.
Labour Welfare Cess for (01) one independent Electrician operator in one shift.
Manning & Operation by providing outsourcing services to Power Station - 2 ( MAFI ) at Tech area by employing one Electrician (Skilled) per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, including Sundays & Holidays, comprising the following works :- (i) Monitoring/ operatting HT 11 KV VCB Panel , 630 Amps,250 MVA,66 KA consisting of two incomming, one bus copler, one bus riser and two outgoing. indoor type- 01 No. (ii) Monitoring checking and watering Earthing system. (iii) Monitoring/operating as and when required LT Panel Boards with LT ACBs and MCCBs & APFC Panel - 4 Nos (iv) Monitoring/operatting Transformer - 1 No and Isolation Transformer -01 No including checking oil level, silica gel in breather and leakage as directed (v) Monitoring/ operatting of DG set (vi) Maintaining Log Book for Installation.
Basic rate for (01) one independent Electrician operator in one shift.
Employer's contribution towards EPF for (01) one independent Electrician operator in one shift.
Employer's contribution towards ESIC for (01) one independent Electrician operator in one shift.
Bonus for (01) one independent Electrician operator in one shift.
Overheads and profit for (01) one independent Electrician operator in one shift.
Labour Welfare Cess for (01) one independent Electrician operator in one shift.
Manning & Operation by providing outsourcing services of DG Sets at LCA Hangers by employing one FGM (Skilled) per shift of 8 hrs for 3 Shifts, 24 Hrs per day, including Sundays & Holidays, comprising the following works :- (i) Operating Diesel Gen Set 03 Nos 810 KVA during electric supply failure. (ii) Maintain DG Set synchorise panel always in working condition. (iii) Monitoring/ operating 03 No compact sub stn 630 KVA. (iv) Monitoring/operating as and when required LT Panel Boards with LT ACBs and MCCBs & APFC Panel - 6 Nos
Basic rate for (01) one independent FGM operator in one shift.
Employer's contribution towards EPF for (01) one independent FGM operator in one shift.
Employer's contribution towards ESIC for (01) one independent FGM operator in one shift.
Bonus for (01) one independent FGM operator in one shift.
Overheads and profit for (01) one independent FGM operator in one shift.
Labour Welfare Cess for (01) one independent FGM operator in one shift.
Note for Item No. 2 to 22 : The rate quoted shall be deemed to be included for the following provisions :- (a) No of shifts : Three shift per day
(b) Rates quoted by contractor shall be inclusive of GST as applicable, basic labour rate, Employer's contribution for EPF, Employer contribution for ESIC, Bonus, Overhead and profit of contractor and labour welfare cess etc.
(c) No of labours : One Govt ITI qualified having minimum 04 years experience in relevant trade i.e. skilled electricians for each shift. (Shift timing 6.00 Hrs to 14.00 Hrs, 14.00 Hrs to 22.00 Hrs and 22.00 hrs to 06.00 Hrs)
(d) No RAR shall be admitted for payment if wage and attendance register of Trades personnel engaged are not produced alongwith RAR/ FB.
(e) Wage paid by the contractor to the persons employed shall not be less than the minimum wages fixed by State/ Central Government from time to time whichever is higher.
(f) The contractor shall be responsible for the EPF, ESI, bonus, Safety etc. and insurance of all trademen employed by him as per existing Labour Rules/ Acts/ Regulations.
(g) Manpower employed by the contractor will be detailed in high security area, it will be the sole responsibility of the contractor to arrange security pass immediately after commencement of work to avoid interruption in smooth functioning of the installation.
(h) Tech qualification and experience certificate of all employed operators shall be submitted by the contractor to Engineer-in-Charge within the 10 days of Acceptance of tender.
(j) In case of manpower employed at any installations/ plant found absent from duty a fine of Rs. 1000.00 per shift will be recovered the dues of the contractor and no amount will be paid for that shift.
(k) The firm/ Contractor shall be solely and fully responsible to his employed manpower for any accident/ damage during maintenance and operation period. The department will not entertain any claim compensation etc. on this account and shall have no liability in this regard.
(l) The operating staff shall be capable for attending minor defects/ rectification. Necessary tools should be provided by the contractor without any extra cost.
(m) Duty staff will ensure proper upkeep and operation of all installed machinery and other electrical fittings, fixtures and proper shift wise operating record of each plant in log sheets duly signed by shift duty operator and contractor.
(n) Duty staff will maintain the installation, machinery, control panels and the premises clean and tidy and will report break downs or any affects immediately to the Engineer-in-Charge/ concern JE.
(o) DHPP (Diesel) shall be issued by department however, by using DG Operators diesel should be collected from AFS (MT)/ MES (MT) section and transportation upto DG installation by the contractor without any extra cost.
(p) The operating staff should record the voltages and amperes, consumption of diesel and readings etc., in the daily log sheet.
(q) It may be noted that contractor shall be sole responsible for any mishappening occurs including accident/ injury due to deploying of inexperience unskilled persons.
(r) Operator must be skilled & must have knowledge of operation & maintenance of AC Plants, DG Sets, Panel etc.
(s) Consumable stores such as cotton waste, Grease including tools required shall be provided by the contractor.
(t) Operator must be skilled & must have knowledge of operation & maintenance of Electrical Sub Stns including VCBs, Transformers, Pump Sets, DG Sets, Panel etc.
(u) Consumable stores such as cotton waste, Grease including tools required shall be provided by the contractor
(v) Operator must ensure cleanliness of VCBs, Transformers, Pump Sets/DG Sets/Panels
(w) The rate quoted by the contractor shall be inclusive of Life insurance for the tradesmen employed by him in case of untoward incident such as injuries, fracture or casualty while on duty.
(x) Carrying out minor repairs viz. replacing blown out fuses, recharging MCCBs, priming of pumps, repair to pipe lines as directed.
(y) Inform the JE/AGE E&M inchrge of any electric faults, water supply failure, Diesel requirement for Gen Sets and any other mishappenings.
(z) Any Major repair of Machineries, replacement of batteries and filing of Diesel for Gen Set will be carried out by the MES
(aa) Any other work, not specifically mentioned above, but ordered by the Engr-in-Charge for the smooth functioning of Sub Station, Pump House and supplying of Electricity/water.
Manning & Operation by providing outsourcing services to AC plants 15 TR capacity - 2 Nos at SEW and CRRW and 12 TR capacity- 2 No at OTF and AVRO Hanger Air cooled Package type make GEA and 2 x 8.5 TR at P-15 (clean room) bldg Make-Blue Star incl the Electrical control panel LT etc at CRRW Complex by engaging one Refg Mech (Skilled) per Shift of 8 hrs for 3 Shift, 24 Hrs per day, including Sundays & Holidays, including the following works :- (a) Operating Diesel Gen Set 20 KVA & 62.5 KVA during Electric Supply failiure (b) Maintaining Log Book for Gen Set & AC Plants. (c) Carrying out minor repairs viz. replacing blown out fuses, recharging MCCBs as directed.
Basic rate for (01) one independent Refg Mech operator in one shift.
Employer's contribution towards EPF for (01) one independent Refg Mech operator in one shift.
Employer's contribution towards ESIC for (01) one independent Refg Mech operator in one shift.
Bonus for (01) one independent Refg Mech operator in one shift.
Overheads and profit for (01) one independent Refg Mech operator in one shift.
Labour Welfare Cess for (01) one independent Refg Mech operator in one shift.
Manning & Operation by providing outsourcing services to AC plants 3 x 16.5 TR capacity Air cooled Package type make GEA incl the Electrical control panel LT etc at OPERA-I by engaging one Refg Mech (Skilled) per Shift of 8 hrs for 3 Shifts, 24 Hrs per day, including Sundays & Holidays , including the following works :- (a) Operating Diesel Gen Set 125 KVA during Electric Supply failiure (b) Maintaining Log Book for Gen Set & AC Plants. (c) Carrying out minor repairs viz. replacing blown out fuses, recharging MCCBs as directed. Note:-(i) OPERA-I-Operating of two Nos AC plants, Compressor Sets and related Condensers, AHUs shall be carried out simultaneously at one time with the third one as Stand by on a Rotation Basis each not exceeding 12 hours working at a stretch all as directed by Engr-in-charge.
Basic rate for (01) one independent Refg Mech operator in one shift.
Employer's contribution towards EPF for (01) one independent Refg Mech operator in one shift.
Employer's contribution towards ESIC for (01) one independent Refg Mech operator in one shift.
Bonus for (01) one independent Refg Mech operator in one shift.
Overheads and profit for (01) one independent Refg Mech operator in one shift.
Labour Welfare Cess for (01) one independent Refg Mech operator in one shift.
Note for Item No. 49 to 62 : The rate quoted shall be deemed to be included for the following provisions :- (a) No of shifts : Three shift per day
(b) Rates quoted by contractor shall be inclusive of GST as applicable, basic labour rate, Employer's contribution for EPF, Employer contribution for ESIC, Bonus, Overhead and profit of contractor and labour welfare cess etc.
(c) No of labours : One Govt ITI qualified having minimum 04 years experience in relevant trade i.e. Refrigerator/ AC Machnic for each shift. (Shift timing 6.00 Hrs to 14.00 Hrs, 14.00 Hrs to 22.00 Hrs and 22.00 hrs to 06.00 Hrs)
(d) No RAR shall be admitted for payment if wage and attendance register of Trades personnel engaged are not produced alongwith RAR/ FB.
(e) Wage paid by the contractor to the persons employed shall not be less than the minimum wages fixed by State/ Central Government from time to time whichever is higher.
(f) The contractor shall be responsible for the EPF, ESI, bonus, Safety etc. and insurance of all trademen employed by him as per existing Labour Rules/ Acts/ Regulations.
(g) Manpower employed by the contractor will be detailed in high security area, it will be the sole responsibility of the contractor to arrange security pass immediately after commencement of work to avoid interruption in smooth functioning of the installation.
(h) Tech qualification and experience certificate of all employed operators shall be submitted by the contractor to Engineer-in-Charge within the 10 days of Acceptance of tender.
(j) In case of manpower employed at any installations/ plant found absent from duty a fine of Rs. 1000.00 per shift will be recovered the dues of the contractor and no amount will be paid for that shift.
(k) The firm/ Contractor shall be solely and fully responsible to his employed manpower for any accident/ damage during maintenance and operation period. The department will not entertain any claim compensation etc. on this account and shall have no liability in this regard.
(l) The operating staff shall be capable for attending minor defects/ rectification. Necessary tools should be provided by the contractor without any extra cost.
(m) Duty staff will ensure popper upkeep and operation of all installed machinery and other electrical fittings, fixtures and proper shift wise operating record of each plant in log sheets duly signed by shift duty operator and contractor.
(n) Duty staff will maintain the installation, machinery, control panels and the premises clean and tidy and will report break downs or any affects immediately to the Engineer-in-Charge/ concern JE.
(o) DHPP (Diesel) shall be issued by department however, by using DG Operators diesel should be collected from AFS (MT)/ MES (MT) section and transportation upto DG installation by the contractor without any extra cost.
(p) The operating staff should record the voltages and amperes, consumption of diesel and readings etc., in the daily log sheet.
(q) It may be noted that contractor shall be sole responsible for any mishappening occurs including accident/ injury due to deploying of inexperience unskilled persons.
(r) Operator must be skilled & must have knowledge of operation & maintenance of AC Plants, DG Sets, Panel etc.
(s) Consumable stores such as cotton waste, Grease including tools required shall be provided by the contractor.
(t) Operator must ensure cleanliness of AC Plants/DG Sets/Panels.
(u) The rate quoted by the contractor shall be inclusive of Life insurance for the tradesmen employed by him in case of untoward incident such as injuries, fracture or casualty while on duty.
(v) Inform the JE/AGE E&M inchrage of any electric faults, water supply failure, Diesel requirement for Gen Sets and any other mishappenings.
(w) Any Major repair of Machineries, replacement of batteries and filing of Diesel for Gen Set will be carried out by the MES.
(x) Any other work, not specifically mentioned above, but ordered by the Engr-in-Charge for the smooth functioning of AC Plants and DG Sets.
Manning & Operation by providing outsourcing services to LCA Pump House and LCA Fire Fighting installation by employing one FGM (Skilled) labours per Shift of 8 hrs for 3 shift, 24 Hrs per day, including Sunday and Holiday comprising the following work :- (a) Operating Pump sets 8.2 HP-02 No (b) Pump Set 62 HP-1 No. (c) Diesel driven pump set 62 HP-1 No (d) Jockey pump set 4 HP-1 No (e) Operation of DG set 62.5 KVA as required (f) Maintaining Log Book for Gen Set and pump sets (g) Maintaining adequate level of water storage in semi UG sump, OH reservoir, operation of valve for filling and distribution as directed. (h) Operators has to make necessary laison with operators at Booster pump house/ Kalpa Vihar pump house for maintaining required vevel of water storage in reservoir (j) Operator is responsible to maintain required chlorine residual to source as directed by Engineer-in-Charge. A cholorine measuring kit shall be available at installation and the cost of same is deemed to be included in the quoted rate. (k) Maintaining record of timing for supply of water complete all as specified and directed by Engineer-in-Charge.
Basic rate for (01) one independent FGM operator in one shift.
Employer's contribution towards EPF for (01) one independent FGM operator in one shift.
Employer's contribution towards ESIC for (01) one independent FGM operator in one shift.
Bonus for (01) one independent FGM operator in one shift.
Overheads and profit for (01) one independent FGM operator in one shift.
Labour Welfare Cess for (01) one independent FGM operator in one shift.
Note for Item No. 86 to 92 : The rate quoted shall be deemed to be included for the following provisions :- (a) No of shifts : Three shift per day
(b) Rates quoted by contractor shall be inclusive of GST as applicable, basic labour rate, Employer's contribution for EPF, Employer contribution for ESIC, Bonus, Overhead and profit of contractor and labour welfare cess etc.
(c) No of labours : One Govt ITI qualified having minimum 04 years experience in relevant trade. (Shift timing 6.00 Hrs to 14.00 Hrs, 14.00 Hrs to 22.00 Hrs and 22.00 hrs to 06.00 Hrs)
(d) No RAR shall be admitted for payment if wage and attendance register of Trades personnel engaged are not produced alongwith RAR/ FB.
(e) Wage paid by the contractor to the persons employed shall not be less than the minimum wages fixed by State/ Central Government from time to time whichever is higher.
(f) The contractor shall be responsible for the EPF, ESI, bonus, Safety etc. and insurance of all trademen employed by him as per existing Labour Rules/ Acts/ Regulations.
(g) Manpower employed by the contractor will be detailed in high security area, it will be the sole responsibility of the contractor to arrange security pass immediately after commencement of work to avoid interruption in smooth functioning of the installation.
(h) Tech qualification and experience certificate of all employed operators shall be submitted by the contractor to Engineer-in-Charge within the 10 days of Acceptance of tender.
(j) In case of manpower employed at any installations/ plant found absent from duty a fine of Rs. 1000.00 per shift will be recovered the dues of the contractor and no amount will be paid for that shift.
(k) The firm/ Contractor shall be solely and fully responsible to his employed manpower for any accident/ damage during maintenance and operation period. The department will not entertain any claim compensation etc. on this account and shall have no liability in this regard.
(l) The operating staff shall be capable for attending minor defects/ rectification. Necessary tools should be provided by the contractor without any extra cost.
(m) Duty staff will ensure popper upkeep and operation of all installed machinery and other electrical fittings, fixtures and proper shift wise operating record of each plant in log sheets duly signed by shift duty operator and contractor.
(n) Duty staff will maintain the installation, machinery, control panels and the premises clean and tidy and will report break downs or any affects immediately to the Engineer-in-Charge/ concern JE.
(o) DHPP (Diesel) shall be issued by department however, by using DG Operators diesel should be collected from AFS (MT)/ MES (MT) section and transportation upto DG installation by the contractor without any extra cost.
(p) The operating staff should record the voltages and amperes, consumption of diesel and readings etc., in the daily log sheet.
(q) It may be noted that contractor shall be sole responsible for any mishappening occurs including accident/ injury due to deploying of inexperience unskilled persons.
(r) Operator must be skilled & must have knowledge of operation & maintenance of Pump Sets, DG Sets, Panel etc.
(s) Consumable stores such as cotton waste, Grease including tools required shall be provided by the contractor.
(t) Operator must ensure cleanliness of Pump Sets/DG Sets/Panels.
(u) The rate quoted by the contractor shall be inclusive of Life insurance for the tradesmen employed by him in case of untoward incident such as injuries, fracture or casualty while on duty.
(v) Checking of leakage /water level in the radiator, checking of leakage of oil from the engine, compressor etc, shall be carried out by the operator.
(w) Inform the JE/AGE E&M incharge of any electric faults, water supply failure, Diesel requirement for Gen Sets and any other mishappenings.
(x) Any Major repair of Machineries, replacement of batteries and filling of Diesel for Gen Set will be carried out by the MES
(y) Any other work, not specifically mentioned above, but ordered by the Engr-in-Charge for the smooth functioning of Pump House and supplying of water complete all as specified and directed
(z) The unit rate is deemed to be included for jungle clearance / surface dressing around 5 mtr from plinth protection.
Maintenance and running of Tractor with Jungle jim for Grass / Vegetation cutting along the Runway sides all as directed by engaging FGM (Skilled) Jungle Jim operator in general shift from 0900 to 1700 Hrs, excluding Sundays & Holidays, including the following works :- (a) Operating Jungle Jim as directed (b) Maintaining Log Book for Jungle Jim. Note : - (i) Rate quoted shall be deemed to consider for 01 shift (General Shift) of 08 hours per day (ii) The Operator shall have a valid driving licence for operating the Tractor and Jungle jim. (iii) The Operator shall carry out routine day to day and periodical maintenance of plant and equipment to ensure uninterrupted operation all as directed by Engineer-in-Charge. (iv) Diesel required for running the Tractor will be filled by the Department.
Basic rate for (01) one independent FGM operator in one shift.
Employer's contribution towards EPF for (01) one independent FGM operator in one shift.
Employer's contribution towards ESIC for (01) one independent FGM operator in one shift.
Bonus for (01) one independent FGM operator in one shift.
Overheads and profit for (01) one independent FGM operator in one shift.
Labour Welfare Cess for (01) one independent FGM operator in one shift.
Note for item No 118 to 124 :- Rates quoted by contractor shall be inclusive of GST as applicable, basic labour rate, Employer's contribution for EPF, Employer contribution for ESIC, Bonus, Overhead and profit of contractor and labour welfare cess etc.
Taking down defective centrifugal pump set 40 HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, replacement of any defective parts, carrying out necessary lathe work, re-assembling and shifting from workshop to site, re-installation at location as directed by Engr-in-Charge, testing on full load capacity at least for 8 hrs, complete all as specified and as directed. (Supply of spare parts shall be measured and paid for separately under respective items here-in-after). Make of Pump : BATLIBOL Note :- (a) The spares shall be measured and paid seperately in the relevent items given below. (b) Cost of labour for replacement of spares and transportation are deemed to be incl in the quoted rate. (c) The pumpset shall be spared for one week for repair from the date of complaint given by AGE/ JE E/M regarding breakdown. The Contractor is responsible for making alternate arrangement of pump set in case of time required more than one week. (d) In case services affected due to delay in repair of pump set, a penalty of Rs 1000 per day will be levied from the contractor. (e) Please note that this penalty is exclusively other than the condition 56 of IAFW-2249 and shall be treated as interim condition of the contract. (f) The decision of the Accepting Officer in this regard shall be final and binding.
Supply only Ball bearing suitable for 40 HP motor pump as per manufacturer's design complete all as specified and as directed. Make : Tata/SKF/NBC
Supply only coupling bolt with nuts suitable for 40 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only coupling Rubber Bush suitable for 40 HP motor pump as per manufacturer's design complete all as specified and as directed..
Supply only split casing gaskets suitable for 40 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only shaft sleeves suitable for 40 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only Air cock grease nipple suitable for 40 HP motor pump as per manufacturer's design complete all as specified and as directed.
Remetaling of shaft, turning, grinding as per the required size and polishing including provision of neck rings of impellers suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only water seal suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only bronze impeller suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply and fix CI foot valve 80mm dia to suction line of exisiting pumping set with bolts, nuts, rubber packings, etc including taking out old unserviceable one by dismantling suction pipe from pump set all as specified and directed.
Construction of Valve Chamber of size 1000 X 1000 X 1000 mm internal size suitable for Sluice Valve, with PCC 1:4:8, Type D2, using 40mm graded aggregate for foundation, 230 mm thick Brickwork with old size Fly Ash Bricks in Cement Mortar 1:6, 40 mm thick PCC, 1:2:4, Type B1, using 20mm graded aggregate Coping, rendering in CM 1:4, 15 mm thick including provision of Mild Steel Sheet Cover 3 mm thick with 40 X 40 X 6 mm size Angle Iron frame work embedded in concrete with suitable hinges and locking arrangements including two coat of synthetic enamel black paint over a coat of red oxide zinc chrome primer to steel surfaces and including necessary earth work excavation in any type of soil etc., removal of surplus soil off the premises complete all as specified.
Excavation for taking out brocken CI/DI pipe line upto 200/150mm dia, cutting of CI/DI pipe line upto 200mm dia at two portion with the help of electrical driven pipe cutter and levelling the cutting face of pipe with the electric driven grinder and then CI/DI welding by electric welding machine, fixing detacheble joint, tail piece etc then concreteting by PCC (1:4:8) type D-2 using 40 mm graded stone aggregate as in foundation filling and mass condrete, after repair of same pipe line, returning filling of excavated materials including removal of surplus soil complete all as specified.
110 mm outer dia of pipe of 3 Layer PP-R Polyproplyne random copolymer concealed SDR 11 (PN 10) UV stabilized and antimicrobial fusion welded havIng thermal stability for hot and cold water supply including all PP-R plain & brass threaded polypropyelene random fittings fixing complete to walls, floors, ceilings, under trenches including taking down of existing GI/CI unserviceable pipes complete all as specified and directed. Make : SFMC, Reliance Industries, KPT.
Note for item No 139 :- (a) The unit rate shall be include for taking down existing GI pipe and connections and all fittings as directed.
(b) The unit rate shall be include the cost of short lengths, with all pipe fittings such as bends, tees, short pieces connectors, elbows, reducers, unions, sockets etc and fixing accssories such as pipe hooks, screws clamps etc
(c ) Wall thickness of pipes shall be all as per IS : 15801
110 mm outer dia PP-R Gate Valves (Brass insert) with iron wheel head screwed both ends for iron pipes and including taking out unserviceable Gate valves complete all as specified and directed.
Supply and fix, sluice valve with cast iron body and gun metal/steel spindle and hand operated iron wheel, both ends flanged and drilled including nuts, bolts, washers and gaskets, class PN 1.6, for 100mm dia bore pipe, including disconnecting, taking out old and removal, complete all as specified and directed.
Flat Three Core PVC Insulated & PVC Sheathed Industrial Cable for Submersible Pump Motors 1100 Volt, conforming to IS 694, 4 sq mm nominal area complete including taking out old unserviceable cable complete all as specified and directed.Make : Havells/ Polycab/ Plaza
Taking down defective centrifugal pump set 25 HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, replacement of any defective parts, carrying out necessary lathe work, re-assembling and shifting from workshop to site, re-installation at location as directed by Engr-in-Charge, testing capacity at least for 8 hrs on load, complete all as specified and as directed. (Supply of spare parts shall be measured and paid for separately under respective items here-in-after). Make of Pump : M/s BE Pvt Ltd/ Kirloskar Note :- (a) The spares shall be measured and paid seperately in the relevent items given below. (b) Cost of labour for replacement of spares and transportation are deemed to be incl in the quoted rate. (c) The pumpset shall be spared for one week for repair from the date of complaint given by AGE/ JE E/M regarding breakdown. The Contractor is responsible for making alternate arrangement of pump set in case of time required more than one week. (d) In case services affected due to delay in repair of pump set, a penalty of Rs 1000 per day will be levied from the contractor. (e) Please note that this penalty is exclusively other then the condition 56 of IAFW-2249 and shall be treated as interim condition of the contract. (f) The decision of the Accepting Officer in this regard shall be final and binding.
Supply only Ball bearing suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. Make : Tata/SKF/NBC
Supply only coupling bolt with nuts suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only coupling Rubber Bush suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only split casing gaskets suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only shaft sleeves suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only Air cock grease nipple suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only water seal suitable for 25HP motor pump as per manufacturer's design complete all as specified and as directed.
150 mm bore Ductile Iron Pressure Pipes, Centrifugally Cast [Spun], Class "K-9" with Socket and Spigot ends conforming to IS - 8329 in standard lengths suitable for Push-On Rubber Gasket Jointing with inside Cement Mortar Lining and Black Bitumen external coating including taking down the existing pipe complete all as specified and as directed.
DI fittings Bend,(any type ,radius and angle) tapers any type (straight, bend,increasing,decreasing or double socket etc), Tee pieces, connection pieces, collers, caps and plugs complete all as specified and directed
Cleaning/ overhauling of squirrel cage induction motor by dismantling stator and rotor assembly, carryout necessary tesing of windings to findout any core loss in windings, test of insulation resistance, etc. Applying of proper insulation material for strengthening of insulation, cleaning the casing and slots with wire brush, washing out dust and carbon particles with proper chemical solution, replacement unserviceable bearing, bush, carryour re-alignment of crank shaft re-assembling stator and rotor assemblies, testing complete all as specified and directed for capacity 20 HP to 30 HP. Note:- (a) Rewinding of stator and rotor if required will be measured and paid seperately. (b) Cost of Transportation to and from the local workshop is deemed to be incl in the quoted rate.
Rewinding of stator core with proper gauge and amount of highly insulated copper wire as existing, testing complete.
Rewinding of rotor core with proper gauge and amount of highly insulated copper wire as existing, testing complete.
Excavation in trenches not exe 1.5m wide and not exc 1.5 mtr depth for laying cable, pipes etc and not exc 10 sqm on plan and getting out in hard/ dense soil complete all as specified and directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in hard and dense soil.
Removing excavated materials not exceeding 50m distance and depositing where directed at level not exceeding 1.5 m above the starting point
Riddling Sand obtained from excavation for cable protection 8cm under the cable and 15cm above the cable in trench and get the thick layer of 18cm after ramming. Note :-The rate is deemed to be included for in case sufficient sand not obtained from excavation, the required additional qty obtain from out side land as directed by the Engineer-in-Charge.
Fly ash cable protection cover including taking down existing bricks of any size.
XLPE insulated,screened, PVC Bedded, galvanised steel strip or wire armoured, electric power cable heavy duty with aluminium condutor 1100Volts grade cross sectional area 95 Sqmm 3.5 core laid in trenches /ducts/fixed to wall/pole/ inside panel/ drawn through pipe including cable glands and terminal sockets, taking down existing cable etc all as specified and directed. Note : Excavation and earth work shall be measured and paid seperately. Make : KEI/ Polycab/ Havells
Cutting existing road/PCC/Drain for laying of DI/GI or any type of pipe including necessary earth work, excavation exc 600mm depth but not exc 1mtr depth, wide 800mm including making existing surface with PCC 1:2:4 type B1 using 20mm aggregate thickness of concrete is 150mm complete all as specified and directed.
Note for item No 165 :- The tendere shall take into consideration for following points while quoting his rate for this item and the unite rate is deemed be included for :-
(i) Earth work excavation in any type of soil
(ii) Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc. 25 cm thick complete all as specified and as directed.
(iii) Removing excavated material to out side MD land
(iv) Laying of any type/any bore of pipe in trenches including taking down any description. Supply of pipe will be measured and paid separately
(v) 150 mm thick PCC 1:2:4 type B1 as in road
Supply only GI pipe 80 mm bore medium grade for cable protection complete all as specified and as dierced by Engr-in-Charge. Make : Tata, Jindal, Surya Prakash Note : The unit rate is included for supply only and cutting existing road , excavation, Laying of any type/any bore of pipe in trenches including taking down any description and 150 mm thick PCC 1:2:4 type B1 as in road will be measured and paid separately.
Supply, installation, commissioning and testing of Factory assembled, Floor mounted, free standing, type tested LT Feeder Pillar Panels, with canopy, as per electrical specifications for outdoor installation, to be made of IP65 Polycarbonate modular enclosures. The Enclosures made of Polycarbonate, should be weather/ vermin proof, anti-acid, anti-corrosive, UV resistance in accordance with IEC 61439-1, Fire retardant and Self-extinguishing in accordance with IEC 60695-2-11, UL subject 94 for flammability V-0, should pass glow wire test for 960° in accordance with 60695-2-11. Degree of protection against mechanical load should be IK 08 (5 Joule) in accordance with IEC 62262, IP 65 in accordance with IEC 60529 & IEC60439-1, should have Dielectric Properties, RoHS compliant & Halogen free. The manufacturer of boards/panel shall submit a copy of type test reports as per above-mentioned norms either from UL/ERDA/CPRI/NABL labs in India. The panels should be modular and compartmentalized in construction with opaque and transparent doors, properly tightened to base with thermoplastic screws having sealing gaskets of extruded silicon rubber to withstand adverse weather effects. The depth of modular enclosures should be above 200mm for air circulation & to minimize temp rise. Panel should be fitted with 01 No polycarbonate IP 65, 9W LED translucent bulk head luminaire, 6500K, PF > 0.95 under canopy for easy maintenance. Panel should be fitted outside with 01 No of 16A 3P IP 65 industrial socket and 01 No of 32A 5P IP 65 industrial socket. 3 phase and neutral 250 amps current carrying capacity copper bus bar insulated with colour coded heat shinkable sleeves with SMC/DMC insulators, complete with the following switch gears and mounting the panel board on ground with PCC (1:3:6) bedding upto a height of 45 cm above ground level, including dismantling and taking out old u/s LT Panel Board and remove from site reconnecting existing LT Cables with new panel board complete all as directed :-
Rectification of existing defective flanged joints with rubber or fibre gasket complete with necessary nuts, bolts and washers for 100 mm dia GI/DI/MS pipes complete all as directed. Note:- a) quoted rates are inclusive of cutting of GI/DI/MS Pipes, jointing materials and preparation of new flanged sockets and refixing the same at existing place. (b) Necessary excavation shall be measured and paid separately under respective items of BOQ
Servicing/ cleaning of water fountain consisting of submersible/ hollow well pump set 1 HP to 3 HP and connected accessories like pipe rings/ jets/ nozles/ suction and delivery pipes/ cable and electrical controlls, and any other efforts to make smooth flow of water through the pipes and nozles complete all as directed. Note :- (a) Replacement of unserviceable nozles upto 5 Nos, clamps, welding upto 12 stiches are deemed to be incl in the quoted rate. (b) Repair to the pumpset and replacement of cables will be measured and paid seperately under relevant items.
Dismantling pump and motor of submersible pump set for capacity upto 10 HP to carry out repairs and replacements at local workshop, duly replacing worn out parts, applying one coat of spray painting with synthetic enamel paint of existing colour and testing complete all as specified and directed. Note :- (a) The spares shall be measured and paid seperately in the relevent items given below. (b) Cost of labour for replacement of spares and transportation are deemed to be incl in the quoted rate. (c) The pumpset shall be spared for one week for repair from the date of complaint given by AGE/ JE E/M regarding breakdown. The Contractor is responsible for making alternate arrangement of pump set in case of time required more than one week. (d) In case services affected due to delay in repair of pump set, a penalty of Rs 500 per day will be levied from the contractor. (e) Please note that this penalty is exclusively other then the condition 56 of IAFW-2249 and shall be treated as interim condition of the contract. (f) The decision of the Accepting Officer in this regard shall be final and binding.
Supply only GM Bush.
Supply only sleeve MS key for impeller
Supply only SS coupling bearing.
Supply only oil seal thrust bearing.
Supply only Sand Guard.
Sluice Valve, Cast Iron body, Stainless Steel Spindle, Gun Metal Rings including Wheel for operation, Flanged and Drilled, suitable for 150 mm dia pipes, confirming to IS - 14846, Class PN -1.6, Long Body type including all Joints with Rubber Gasket and Jointing Materials, Bolts, Nuts, Washer complete including taking down existing UNSV sluice Valve all as specified and as directed.
Supply and lay UPVC pipe class “SCH 40” 100 mm dia, conforming to IS 13592 with all fittings (specials) and fixtures including disconnecting and taking out old unserviceable pipe with specials complete all as specified and directed.
90 mm outer dia of pipe of 3 Layer PP-R Polyproplyne random copolymer concealed SDR 7.4 (PN 16) UV stabilized and antimicrobial fusion welded havIng thermal stability for hot and cold water supply including all PP-R plain & brass threaded polypropyelene random fittings fixing complete to walls, floors, ceilings, under trenches including taking down of existing GI/CI unserviceable pipes complete all as specified and directed. Make : SFMC, Reliance Industries, KPT.
Note for item No 185 :- (a) The unit rate shall be include for taking down existing GI pipe and connections and all fittings as directed.
(b) The unit rate shall be include the cost of short lengths, with all pipe fittings such as bends, tees, short pieces connectors, elbows, reducers, unions, sockets etc and fixing accssories such as pipe hooks, screws clamps etc
(c ) Wall thickness of pipes shall be all as per IS : 15801
90 mm outer dia PP-R Gate Valves (Brass insert) with iron wheel head screwed both ends for iron pipes and including taking out unserviceable Gate valves complete all as specified and directed.
Disconnecting the delivery pipe line of submersible pump sets of any capacity from water mains to take out by lifting column pipe of 50mm dia alongwith submersible cable and pump set from shallow well of any depth for servicing of submersible pump sets of any capacity at site, re-assembling the column pipe and re-connection of submersible cable with pump set and lowering in the shallow/open well, testing and commissioning all as specified and directed. Note:- (a) The cost of tools and equipments reqd for lifting/ lowering of pipes and pumps are deemed to be incl in the quoted rate.
Supply only 110 mm outer diameter of pipes in cutting road portion 3 Layer PP-R Polyproplyne random copolymer concealed SDR 7.4 (PN 16 @ 20°C) UV stabilized and antimicrobial fusion welded havIng thermal stability for hot and cold water supply including all PP-R plain & brass threaded polypropyelene random fittings complete Note : The unit rate is included for supply only and cutting existing road , excavation, Laying of any type/any bore of pipe in trenches including taking down any description and 150 mm thick PCC 1:2:4 type B1 as in road will be measured and paid separately
Supply only 90 mm outer diameter of pipes in cutting road portion 3 Layer PP-R Polyproplyne random copolymer concealed SDR 7.4 (PN 16 @ 20°C) UV stabilized and antimicrobial fusion welded havIng thermal stability for hot and cold water supply including all PP-R plain & brass threaded polypropyelene random fittings complete Note : The unit rate is included for supply only and cutting existing road , excavation, Laying of any type/any bore of pipe in trenches including taking down any description and 150 mm thick PCC 1:2:4 type B1 as in road will be measured and paid separately
XLPE insulated,screened, PVC Bedded, galvanised steel strip or wire armoured, electric power cable heavy duty with aluminium condutor 1100Volts grade cross sectional area 70 Sqmm 3.5 core laid in trenches /ducts/fixed to wall/pole/ inside panel/ drawn through pipe including cable glands and terminal sockets, taking down existing cable etc all as specified and directed. Note : Excavation and earth work shall be measured and paid seperately. Make : KEI/ Polycab/ Havells
Supply only 80 mm bore of pipe high density polyethylene pipes (HDPE) of pressure rating 6 kgf/ cm2 laid in trenches for cable protection passing under road/ floor or for fixing to poles complete all as specified and directed. Note : The unit rate is included for supply only and cutting existing road , excavation, Laying of any type/any bore of pipe in trenches including taking down any description and 150 mm thick PCC 1:2:4 type B1 as in road will be measured and paid separately.
63 mm outer dia of pipes 3-layer PP-R (Polypropylene random copolymer) pipes concealed pipes SDR 7.4 (PN-16 @ 20°C) UV stablised and anti microbial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings, including taking down existing pipe of any description complete to walls, ceilings or in floors etc. all as specified and directed. Make : SFMC, Reliance Industries, KPT
Note for item No 195 :- (a) The unit rate shall be include for taking down existing GI pipe and connections and all fittings as directed.
(b) The unit rate shall be include the cost of short lengths, with all pipe fittings such as bends, tees, short pieces connectors, elbows, reducers, unions, sockets etc and fixing accssories such as pipe hooks, screws clamps etc
(c ) Wall thickness of pipes shall be all as per IS : 15801
Supply and fixing 63 mm outer dia PP-R Gate Valves (Brass insert) with iron wheel head screwed both ends for iron pipes and including taking out unserviceable Gate valves complete all as specified and directed.
Supply only 63 mm outer diameter of pipes in cutting road portion 3 Layer PP-R Polyproplyne random copolymer concealed SDR 7.4 (PN 16 @ 20°C) UV stabilized and antimicrobial fusion welded havIng thermal stability for hot and cold water supply including all PP-R plain & brass threaded polypropyelene random fittings complete Note : The unit rate is included for supply only and cutting existing road , excavation, Laying of any type/any bore of pipe in trenches including taking down any description and 150 mm thick PCC 1:2:4 type B1 as in road will be measured and paid separately
Construction of Valve Chamber of size 600mmx 600mmx 600mm (internal) internal size suitable for Sluice Valve, with 150 mm thick PCC 1:4:8, Type D2, using 40mm graded aggregate for foundation, 200 mm thick Brickwork with old size Fly Ash Bricks in Cement Mortar 1:6, 40 mm thick PCC, 1:2:4, Type B1, using 20mm graded aggregate Coping, rendering in CM 1:4, 15 mm thick including provision of Mild Steel Sheet Cover 3 mm thick with 40 X 40 X 6 mm size Angle Iron frame work embedded in concrete with suitable hinges and locking arrangements including two coat of synthetic enamel black paint over a coat of red oxide zinc chrome primer to steel surfaces and including necessary earth work excavation in any type of soil etc., removal of surplus soil off the premises complete all as specified.
Supply, installation, commissioning and testing of Factory assembled, Floor mounted, free standing, type tested LT Feeder Pillar Panels, with canopy, as per electrical specifications for outdoor installation, to be made of IP65 Polycarbonate modular enclosures. The Enclosures made of Polycarbonate, should be weather/ vermin proof, anti-acid, anti-corrosive, UV resistance in accordance with IEC 61439-1, Fire retardant and Self-extinguishing in accordance with IEC 60695-2-11, UL subject 94 for flammability V-0, should pass glow wire test for 960° in accordance with 60695-2-11. Degree of protection against mechanical load should be IK 08 (5 Joule) in accordance with IEC 62262, IP 65 in accordance with IEC 60529 & IEC60439-1, should have Dielectric Properties, RoHS compliant & Halogen free. The manufacturer of boards/panel shall submit a copy of type test reports as per above-mentioned norms either from UL/ERDA/CPRI/NABL labs in India. The panels should be modular and compartmentalized in construction with opaque and transparent doors, properly tightened to base with thermoplastic screws having sealing gaskets of extruded silicon rubber to withstand adverse weather effects. The depth of modular enclosures should be above 200mm for air circulation & to minimize temp rise. Panel should be fitted with 01 No polycarbonate IP 65, 9W LED translucent bulk head luminaire, 6500K, PF > 0.95 under canopy for easy maintenance. Panel should be fitted outside with 01 No of 16A 3P IP 65 industrial socket and 01 No of 32A 5P IP 65 industrial socket. 3 phase and neutral 400 amps current carrying capacity copper bus bar insulated with colour coded heat shinkable sleeves with SMC/DMC insulators, complete with the following switch gears and mounting the panel board on ground with PCC (1:3:6) bedding upto a height of 45 cm above ground level, including dismantling and taking out old u/s LT Panel Board and remove from site reconnecting existing LT Cables with new panel board complete all as directed :-
Earthing with Galvanised Earth Plate Electrode 600x600x 6mm thick burried directly in Ground (Earth Pit not less than 2.25 Metre below Ground Level) with Top edge of the Plate not less than 1.50 Metre below Ground Level, connected with Galvanised Earth Strip of size 25x6mm by means of Bolts, Nuts, Check Nuts and Washers of GI or Steel and connected Earthing Testing Point/Bus-bar including GI 40mm bore (dia) light grade Protection Pipe, Earth Plate surrounded by a packed thickness of Char Coal or Coke Dust mixed with Common Salt, Magneisum Sulphate (1 : 1 : 0.5) in alternate layers of not exc 150mm thick, PCC Pit in Cement Concrete 1:3:6 (20mm graded stone aggregate) and Pre-cast RCC Cover Slab of size 350x350x50 mm in Cement Concrete 1:2:4 (20mm graded stone aggregate), reinforced with 10mm dia TMT Bars @ 100mm Centre to Centre in both ways, GI Wire Mesh, Funnel with GI Watering Pipe 20mm bore (dia) medium grade including necessary Excavation in Soft/Loose Soil, Returning, Filling in and Removal of surplus Spoil upto a distance of 50.00 Metre and all as shown in Electrical Plate No. 3 of MES Schedule Part-I and Testing on Completion including taking down old unserviceable one, complete all as per specified and as directed.
Note for item No 204 :- (a) All Joints should be joined by Exothermic Welding or Brazing.
(b) After completion of work earthing shall be tsested by the contractor in presence of Engineer-in-Charge, User and proper record shall be maintained duly signed by all concerned.
(c) Earth resistance tester shall be provided by the contractor. It should be caliberated from authorised company/ lab.
(d) After testing if desired earth resistance of less than 5 Ohm is not obtained, the earthing will be redone at no extra cost to Govt till desired result is obtained.
PRIYA ENTERPRISES
Neptune Engineers and Builders
devan enterprises
Lucky Enterprises
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .