Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
15 Nov 2023, 3:00 pmClosed
EXECUTIVE OFFICER
112/2, ERODE ROAD, PERUNDURAI TOWN PANCHAYAT OFFICE, PERUNDURAI-638052, ERODE DISTRICT
Providing of BT Road From Perundurai , Madathupalayam Road to Mayaavenue Back Side of Velusamy House in Perundurai Town Panchayat - Erode District.
2023_DTP_387111_1
123/2023
Open Tender
Civil Works
Works
180 days
PERUNDURAI
Single Cover system and III Class Contractor
2 documents required · 2 mandatory
₹0
₹17,000
23 Jan 2024
8 Nov 2023
15 Nov 2023
8 Nov 2023
15 Nov 2023
8 Nov 2023
8 Nov 2023 - 15 Nov 2023
Amount
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Providing and laying Well Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH Earthen Road
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Premix Carpet with Seal Coat Type "A" for 20mm thickness using 0.18 cum of 13.20 mm IRC size HBG metal and 0.09 cum of 11.20 mm IRCsize HBG metal with 14.60 kg of the 60/70 Graded Bulk Bitumen for premixing 10 Sq.m of Premix Carpet and 0.09 cum of 6.70 mm IRC size HBG metal with 9.80 Kg of 60/70 Graded Bulk Bitumen for Seal Coat Type "A" per 10 sq.m including cost and conveyance of materials to the work site and stacking heating the bitumen in bitumen boiler heating the aggregates and mixing the with bitumen in mini not mix plant to premix carpet only rolling by 80 – 100 KN power roller for premix carper application of bitumen for seal coat over premix carpet etc., including hire charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges and fuel chargers for Mini Hot Mix Plant bitumen boiler, power roller and all other tools and plant employed etc., complete.
Providing and laying of hot applied thermoplastic compound f2.5mm thick including refllectorising glass beads @ 250grms per sqm area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 the Finished surface to be level, uniform and free from steaks and holes etc., complete as per MORT & H Specification No.803
V. SUNDARAM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_461325.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .