Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance 3A NEXT TO DPC CIRCLE OPP THAR DRY PORT MAIN PAL ROAD JODHPUR | JODHPUR | JODHPUR | RAJASTHAN | -8.51% | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.9 Cr+₹7.3 L (1.91%)Admitted-Finance | -6.76% | ₹3.9 Cr+₹7.3 L (1.91%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 Cr+₹14.2 L (3.72%)Admitted-Finance | -5.11% | ₹4.0 Cr+₹14.2 L (3.72%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 Cr+₹17.6 L (4.61%)Admitted-Finance NURSERY SCHOOL 1 SECTOR 33 SUNCITY KURUKSHETRA ROAD KAITHAL 136027 HARYANA | KAITHAL | KAITHAL | HARYANA | 136027 | -4.29% | ₹4.0 Cr+₹17.6 L (4.61%) | L4 | Admitted-Finance |
| 5 | L5₹4.1 Cr+₹31.3 L (8.20%)Admitted-Finance | -1.01% | ₹4.1 Cr+₹31.3 L (8.20%) | L5 | Admitted-Finance |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
4 Apr 2022, 6:00 pmClosed
Additional Chief Engineer PHED Region IInd Jodhpur
Additional Chief Engineer PHED Region IInd Jodhpur
(296) WORK OF PROVIDING F.H.T.C.S IN 02 NOS VILLAGES OF SAMDARI BLOCK COVERED FROM PINDARAN OHSR OF IGNP BASED WATER SUPPLY PROJECT UMEDSAGAR-DHAWA-SAMDARI-KHANDAP PART-III, TEHSIL KALYANPUR, DISTRICT BARMER
2022_PHCJO_264023_15
NIT NO. 282-296/2021-22
Open Tender
Civil Works - Water Works
Percentage
180 days
Barmer
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
12042-EE PHED Dn. Balotra
₹8.4 L
Yes
30 May 2022
14 Mar 2022
5 Apr 2022
14 Mar 2022
4 Apr 2022
14 Mar 2022
eProcurement System Government of Rajasthan Created By: Manoj Prakash Mathur Created Date/Time: 30-May-2022 05:16 PM Tender Title: NIT No 296/2021-22 Tender ID: 2022_PHCJO_264023_15
Tender Inviting Authority: OFFICE OF THE ADDITIONAL CHIEF ENGINEER, P.H.E.D. REGION-II-JODHPUR
Name of Work: WORK OF PROVIDING F.H.T.C.'s IN 02 NOS VILLAGES OF SAMDARI BLOCK COVERED FROM PINDARAN OHSR OF IGNP BASED WATER SUPPLY PROJECT UMEDSAGAR-DHAWA-SAMDARI-KHANDAP PART-III, TEHSIL KALYANPUR, DISTRICT BARMER
Contract No: 296/2021-22
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 B R CONSTRUCTION COMPANY(GSTN-08AJUPB8785C2ZQ) 41757525.12 -1.01 41335774.12 Four Crore Thirteen Lakh Thirty Five Thousand Seven Hundred and Seventy Four
2.00 SHREE HARI CONSTRUCTION COMPANY(GSTN-08AOCPR1105H1Z9) 41757525.12 -1.00 41339949.87 Four Crore Thirteen Lakh Thirty Nine Thousand Nine Hundred and Fourty Nine
3.00 godara construction co.(GSTN-08APSPR3570D1ZI) 41757525.12 -4.29 39966127.29 Three Crore Ninty Nine Lakh Sixty Six Thousand One Hundred and Twenty Seven
4.00 RAMAYAN CONSTRUCTION COMPANY(GSTN-08AAXFR6707J1ZF) 41757525.12 -6.76 38934925.21 Three Crore Eighty Nine Lakh Thirty Four Thousand Nine Hundred and Twenty Five
5.00 M/s BR Saran Kotda(GSTN-NA) 41757525.12 -5.11 39623715.59 Three Crore Ninty Six Lakh Twenty Three Thousand Seven Hundred and Fifteen
6.00 M. B CONSTRUCTION(GSTN-NA) 41757525.12 -8.51 38203959.73 Three Crore Eighty Two Lakh Three Thousand Nine Hundred and Fifty Nine
Lowest Amount Quoted BY: M. B CONSTRUCTION(38203959.73)
BOQ Summary Details Tender Title: NIT No 296/2021-22 Tender ID: 2022_PHCJO_264023_15
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M. B CONSTRUCTION 38203959.73 L1
2 RAMAYAN CONSTRUCTION COMPANY 38934925.21 L2
3 M/s BR Saran Kotda 39623715.59 L3
4 godara construction co. 39966127.29 L4
5 B R CONSTRUCTION COMPANY 41335774.12 L5
6 SHREE HARI CONSTRUCTION COMPANY 41339949.87 L6
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
TD_Eproc_296.pdf
Tender Documents • 4.33 MB
BOQ_471270.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .