| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹30.0 L (18.9%)Admitted-Finance 2 947 NELLAI NAGAR DHARMAPURI | DHARMAPURI | DHARMAPURI | TAMIL NADU | 636701 | ₹1.9 Cr+₹30.0 L (18.9%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹36.0 L (22.7%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹1.9 Cr+₹36.0 L (22.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.0 Cr+₹38.8 L (24.4%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹2.0 Cr+₹38.8 L (24.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MANICKAVASAGAM L2 | K DHINAKARAN L3 | M s Kumaresan and co L1 | JD ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling Of PCC using deploying machine and transporting idebris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance , loading, unloading etc. complete | 79 | Cum | 300 ₹23,700 | 1,000 ₹79,000 | 200 ₹15,800 Lowest | 1,000 ₹79,000 |
| 2.00 | Earth work excavation for foundation including for all charges of soil all labour charges including initial lead, lift, etc., complete. For Hard gravelly soil | 1,441 | Cum | 100 ₹1,44,100 Lowest | 300 ₹4,32,300 | 150 ₹2,16,150 | 250 ₹3,60,250 |
| 3.00 | Earth work excavation for foundation including for all charges of soil all labour charges including initial lead, lift, etc., complete. For Soft Disintegrated Rock not requiring blasting. | 202 | Cum | 130 ₹26,260 Lowest | 300 ₹60,600 | 200 ₹40,400 | 250 ₹50,500 |
| 4.00 | Earth work excavation for foundation including for all charges of soil all labour charges including initial lead, lift, etc., complete. For Medium rock and dense medium rock not requiring blasting. | 101 | Cum | 250 ₹25,250 Lowest | 300 ₹30,300 | 300 ₹30,300 | 250 ₹25,250 Lowest |
| 5.00 | Earth work excavation for foundation including for all charges of soil all labour charges including initial lead, lift, etc., complete. For Hard rock wedging and chesseling | 101 | Cum | 600 ₹60,600 | 300 ₹30,300 Lowest | 500 ₹50,500 | 1,000 ₹1,01,000 |
| 6.00 | PCC 1:3:6, using 12 to 20mm HBG metal without formwork for foundation and oil sump, including cost of cement, all materials, labour, lead, lift, etc. complete. | 139 | Cum | 5,600 ₹7,78,400 | 7,000 ₹9,73,000 | 4,000 ₹5,56,000 Lowest | 4,500 ₹6,25,500 |
| 7.00 | PCC1:2:4 using 12 to 20mm HBG metal for pipe support without formwork for foundation including cost of cement all materials, labour,lead,lift., etc complete | 6 | cum | 6,300 ₹37,800 | 8,000 ₹48,000 | 6,000 ₹36,000 | 4,500 ₹27,000 Lowest |
| 8.00 | PCC1:2:4 using 12 to 20mm HBG metal for pipe support with formwork for foundation including cost of cement all materials, labour,lead,lift., etc complete | 4 | cum | 6,300 ₹25,200 | 8,000 ₹32,000 | 6,000 ₹24,000 Lowest | 9,000 ₹36,000 |
| 9.00 | RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete. For Raft | 205.51 | Cum | 8,900 ₹18,29,039 | 8,000 ₹16,44,080 | 5,000 ₹10,27,550 Lowest | 5,000 ₹10,27,550 Lowest |
| 10.00 | RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete. For Pedastal | 170.1 | Cum | 9,900 ₹16,83,990 | 8,000 ₹13,60,800 | 7,000 ₹11,90,700 Lowest | 12,000 ₹20,41,200 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
15 Jul 2024, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Construction of structural plinth ,cable duct ,supply of Transformer Gantry tower ,LV towers ,oil sump and allied civil works at the existing K.R.Thoppur 400/230-110 kV SS for the newly proposed 500 MVA Interconnecting Transf.in between Auto V and II
2024_EB_458748_1
TP1-09/2024-25 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
120 days
K.R.THOPPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.7 L
Yes
31 Jul 2024
1 Jul 2024
16 Jul 2024
1 Jul 2024
15 Jul 2024
1 Jul 2024
Amount
Dismantling Of PCC using deploying machine and transporting idebris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance , loading, unloading etc. complete
Earth work excavation for foundation including for all charges of soil all labour charges including initial lead, lift, etc., complete. For Hard gravelly soil
Earth work excavation for foundation including for all charges of soil all labour charges including initial lead, lift, etc., complete. For Soft Disintegrated Rock not requiring blasting.
Earth work excavation for foundation including for all charges of soil all labour charges including initial lead, lift, etc., complete. For Medium rock and dense medium rock not requiring blasting.
Earth work excavation for foundation including for all charges of soil all labour charges including initial lead, lift, etc., complete. For Hard rock wedging and chesseling
PCC 1:3:6, using 12 to 20mm HBG metal without formwork for foundation and oil sump, including cost of cement, all materials, labour, lead, lift, etc. complete.
PCC1:2:4 using 12 to 20mm HBG metal for pipe support without formwork for foundation including cost of cement all materials, labour,lead,lift., etc complete
PCC1:2:4 using 12 to 20mm HBG metal for pipe support with formwork for foundation including cost of cement all materials, labour,lead,lift., etc complete
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete. For Raft
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete. For Pedastal
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete. For Slab 150 mm thick
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete,oil sump. For Cover slab
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete. For Column
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete,oil sump. For beam
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement, for precast cover slab & walls concrete. For oil sump Beam
RCC 1:1.5:3 mix using 12-20mm HBG machine crushed metal with form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc., complete, but excluding cost of steel reinforcement . For oil sump wall
Supplying and fabricating and placing in position of MS/RTS steel reinforcement of grade Fe 500 for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete
Labour charges for Transport and erection of substation towers including tightening of bolts and nuts with washers,final checking before loading the structures, cost of all labour, T&P, lead and lift etc. complete.
Brick work in CM 1:5 using chamber burnt bricks second II class for cable duct including cost of all materials, all labour charges, lead, lift, etc. complete.
Plastering with CM 1:3, mix 12mm thick for concerete work including all cost of all materials labour lead lift curing etc complete.
White washing two coats by using emulsion paint over primer coat with white colour for ceilings including cost of all materials, labour, lead, lift etc., complete.
Colour washing 2 Coats over a base coat of primer using Exterior weather coat using Asian APEX or Equivalent of approved Brand,quality and colour for outer wall surfaces for all floors including cost of all labours to work at all levels cost of materials brushes scaffolding charges etc. complete complying with standard specification and as directed.
Refilling the foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Labour charges for transporting of RCC cover slab from curing tank to duct and fixing in correct position etc., complete.
Fabriaction, galvanising and supply of foundation bolts of 20 mm Dia bolt of 900mm and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Fabriaction, galvanising and supply of foundation bolts of40 mm Dia bolt of 1225 mm Length and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site.
Fabriaction, galvanising and supply of foundation bolts of 56 mm Dia bolt of 1400 mm and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site.
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Supplying and spreading of stone dust 5 CM including cost of all materials , lead , lift watering and levelling the surface etc., complete
Supplying and spreading of metal jelly of size 20 mm thickness of 15 cm over stone dust including cost of all materials , lead , lift watering and levelling the surface etc., complete
Supplying and fixing of GI Angle for cable duct including cost of all materials , lead , lift etc., complete.
Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cmX60cm of best approved quality as per standard specification etc., complete complying with standard specifications
Supply and erection of 3 phase suguna (or) any other approved make 400V/440/50 cycle motor (3HP) having ISI make (or) as approved by the Board Engineer at site and delivery unit with foot valve v-belt arrangement including cost of all materials, labour, erection charges,400/440V L&T make starter to suit the compressor including the cost of all materials , labour, lead as per the instruction of Engineer in charge at site complete in all respects
Supply of NP3 class RCC pipe 300mm dia conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing, charges including loading, unloading transport and delivery in good condition at work site etc., complete as directed by the departmental officers as per standard specification
Supplying and laying of 4 core 16 sqmm copper PVC armoured LTUG Cable including cost of cable, lead,lift labour charges etec., complete.
Supplying, Transportation, fabrication, galvanising of standard towers, various structure for 400 KV SS and 230 KV tower parts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer.
Supplying, Transportation, fabrication, galvanising of standard Bolts and nuts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
MANICKAVASAGAM (BID ID -1075388)
K DHINAKARAN (BID ID -1079663)
JD ENTERPRISES (BID ID -1082693)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .