| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹169.8 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹187.2 Cr+₹17.4 Cr (10.3%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KEVADIYA CONSTRUCTION PVT LTD L1 | N.P PATEL & CO L2 |
|---|---|---|---|---|---|
| 1.00Schedule - 1 - Collection System | |||||
| 2.00Earth work excavation and depositing on bank with initial lead of 1-m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size of boulders as directed by Departmental engineer. | |||||
| 3.00 | 0 to 2m depth | 1,58,165.5 | M³ | 1,800 ₹28,46,97,900 Lowest | 1,850 ₹29,26,06,175 |
| 4.00Earthwork excavation and depositing on bank with initial lead of 1-m and initial lift of 2m in Soft Disintegrated Rock, laterite, soft rock or kankar, not required blasting as directed by Departmental engineer. | |||||
| 5.00 | 0 to 2m depth | 3,108.08 | M³ | 2,000 ₹62,16,160 Lowest | 2,500 ₹77,70,200 |
| 6.00Earth work excavation for Pipe Laying work by removing dense medium rock using controlled blasting method by drilling blast holes using compressor and jack hammer including dewatering wherever necessary, cost of gelatin, electric detonator, icensed shot fireman, labour for filling earth in gunny bags, labour for excavation of earth, conveyance of earth including cost of gunny bags, M.S Plates, barricading, putting up road diversion boards and providing red light signal during night, removal of debris etc., where open blasting is prohibited and as directed by Engineer in charge. | |||||
| 7.00 | 1.5 to 2m depth | 8,611 | M³ | 2,200 ₹1,89,44,200 Lowest | 3,000 ₹2,58,33,000 |
| 8.00 | 2 to 3m depth | 4,393.3 | M³ | 2,400 ₹1,05,43,920 Lowest | 3,500 ₹1,53,76,550 |
| 9.00Earth work excavation for Pipe Laying work by removing hard rock using controlled blasting method by drilling blast holes using compressor and jack hammer including stacking,dewatering wherever necessary, cost of gelatin, electric detonator, licensed shot fireman, labour for filling earth in gunny bags, labour for excavation of earth, conveyance of earth including cost of gunny bags, M.S Plates, barricading, putting up road diversion boards and providing red light signal during night, removal of debris etc., where open blasting is prohibited | |||||
| 10.00 | 0 to 2m depth | 12,646.4 | M³ | 2,500 ₹3,16,16,000 Lowest | 3,250 ₹4,11,00,800 |
Tender Value
₹118.9 Cr
EMD Value
₹1.2 Cr
Closing Date
19 Dec 2023, 3:00 pmClosed
Commissioner, Dindigul City Municipal Corporation
9/13, Main road, Corporation Office, Dindigul
Under Ground sewerage scheme to the left out areas in Dindigul City Municipal Corporation
2023_MAWS_382338_1
7695 / 2023/ E2
Open Tender
Civil Works
Works
1095 days
UGSS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.2 Cr
Yes
9/13, Main road, Corporation Office, Dindigul
11 Jan 2024
26 Oct 2023
19 Dec 2023
26 Oct 2023
19 Dec 2023
26 Oct 2023
7 Nov 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Schedule - 1 - Collection System | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead of 1-m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size of boulders as directed by Departmental engineer. | - | - | - | - |
| 3 | 0 to 2m depth | 1,58,165.5 | M³ | - | - |
| 4 | Earthwork excavation and depositing on bank with initial lead of 1-m and initial lift of 2m in Soft Disintegrated Rock, laterite, soft rock or kankar, not required blasting as directed by Departmental engineer. | - | - | - | - |
| 5 | 0 to 2m depth | 3,108.08 | M³ | - | - |
| 6 | Earth work excavation for Pipe Laying work by removing dense medium rock using controlled blasting method by drilling blast holes using compressor and jack hammer including dewatering wherever necessary, cost of gelatin, electric detonator, icensed shot fireman, labour for filling earth in gunny bags, labour for excavation of earth, conveyance of earth including cost of gunny bags, M.S Plates, barricading, putting up road diversion boards and providing red light signal during night, removal of debris etc., where open blasting is prohibited and as directed by Engineer in charge. | - | - | - | - |
| 7 | 1.5 to 2m depth | 8,611 | M³ | - | - |
| 8 | 2 to 3m depth | 4,393.3 | M³ | - | - |
| 9 | Earth work excavation for Pipe Laying work by removing hard rock using controlled blasting method by drilling blast holes using compressor and jack hammer including stacking,dewatering wherever necessary, cost of gelatin, electric detonator, licensed shot fireman, labour for filling earth in gunny bags, labour for excavation of earth, conveyance of earth including cost of gunny bags, M.S Plates, barricading, putting up road diversion boards and providing red light signal during night, removal of debris etc., where open blasting is prohibited | - | - | - | - |
| 10 | 0 to 2m depth | 12,646.4 | M³ | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tendernotice_2.pdf
PDF • 1.11 MB
Tendernotice_3.pdf
PDF • 0.87 MB
Tendernotice_4.pdf
PDF • 16.06 MB
Tendernotice_5.pdf
PDF • 0.24 MB
Tendernotice_6.pdf
PDF • 0.46 MB
Tendernotice_7.pdf
PDF • 0.37 MB
Tendernotice_8.pdf
PDF • 0.55 MB
BOQ_455668.xls
BOQ • 6.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .