Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC AOC issue |
| 2 | L2₹10.0 L+₹24,609.56 (2.51%)Rejected-Finance | ₹10.0 L+₹24,609.56 (2.51%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹10.1 L+₹34,453.39 (3.52%)Rejected-Finance | ₹10.1 L+₹34,453.39 (3.52%) | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹9.8 L
EMD Value
₹98,438
Closing Date
20 May 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Repairing work and construction of chamber in front of Gurudwara at rambag under zone 04 ward 59.
2026_NNKAN_1146796_1
40/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
Ward-59
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,438
1 Sept 2026
16 May 2026
20 May 2026
16 May 2026
20 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work mechanical in surface excavation by means (Hydraulic excavator)/manual means foundation trenches or drain (not exceeding 1.5m in width or 10sqm on plan), excavated soil and disposal of surplus excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m including dressing and sides and ramming of | 173 | cum | 215 | ₹37,195 |
| 2 | Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 1.50-3.00Rmt) | 173 | cum | 269 | ₹46,537 |
| 3 | Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 3.00-4.50Rmt) | 173 | cum | 323 | ₹55,879 |
| 4 | Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 4.50-6.00Rmt) | 148 | cum | 377 | ₹55,796 |
| 5 | Add extra for every additional lift of 1.5m or part thereof in excavation/hanking excavated or stacked materials. All kinds of soil (from 6.00-7.00Rmt) | 99 | cum | 431 | ₹42,669 |
| 6 | Open timbering in case of shaft wells cesspit manhole and the like including strurtting etc all comp. | 510 | sqm | 76.12 | ₹38,821.2 |
| 7 | Making Bundha By Empty Cement Bags (Gunny Bags) Filled With Local Sand & Tightened Using Sutli And Carriage Up Site Including Etc All Complete | 500 | bags | 42 | ₹21,000 |
| 8 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of Ikm also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 554.5 | cum | 125 | ₹69,312.5 |
| 9 | Supplying and filling in plinth with sand under under floors, including watering, ramming. cosolidating and dressing complete. | 22.5 | cum | 900 | ₹20,250 |
| 10 | Providing, laying, spreading and compacting stone agreegate of specific size to water bound macadam-3 speicfication including spreading in uniform thickness, hand packing, rolling with 3-wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and chamber, applying and requisite brooming type of screening/binding materials to fill up the agareteates watering and compacting | 14.6 | cum | 3,847 | ₹56,166.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2144721.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.66 MB
BOQ_2144721.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .