| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹9.4 LAccepted-AOC | ₹9.4 L | 1ST | Accepted-AOC L1 BIDDER |
| 2 | 2ND₹9.8 L+₹46,861.18 (5.00%)Rejected-Finance 53 67 R N GUHA RD KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹9.8 L+₹46,861.18 (5.00%) | 2ND | Rejected-Finance 2ND LOWEST |
| 3 | 3RD₹9.9 L+₹53,981.77 (5.75%)Rejected-Finance | ₹9.9 L+₹53,981.77 (5.75%) | 3RD | Rejected-Finance 3RD LOWEST |
Tender Value
₹9.6 L
EMD Value
₹20,000
Closing Date
19 Feb 2026, 11:00 amClosed
EE(C)/BR-IV
213B, C.R. AVENUE, KOL - 6
DEVELOPMENT OF FOOTPATH AND PASSAGE BY LAYING PAVER BLOCK AT NITAI HALDER STREET, 70, PATHURIA GHATA STREET AND ITS SURROUNDING IN WARD NO 21 UNDER BR IV.
2026_KMC_1003448_1
KMC/EE(C)/BR-IV/21/28/25-26/R
Open Tender
CIVIL WORKS
Percentage
30 days
BOROUGH-IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
1 Aug 2026
10 Feb 2026
21 Feb 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil | 28.74 | M3 | 79.9 | ₹2,296.48 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof (c ) Extra rate for each addl floor over the rate of ground floor. | 10.22 | M3 | 50 | ₹511.14 |
| 3 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 14.37 | M3 | 5,498 | ₹79,011.42 |
| 4 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 588.47 | SQM | 24 | ₹14,123.16 |
| 5 | blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CL.No.3.3 of IS: 15658) as per Table 2 of IS :15658 with flexural strength/breaking load as per Annexure G of IS:15658.on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clanse 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will he us per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 af IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 50mm thick (ii) Coloured Decorative (12th Corrigenda & addenda dated14.10.2020) | 588.47 | %SQ | 875 | ₹5,14,906.88 |
| 6 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 0.1 | %M3 | 93,621 | ₹8,969.55 |
| 7 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 240.9 | MTR | 8.17 | ₹1,968.15 |
| 8 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 240.9 | MTR | 8.17 | ₹1,968.15 |
| 9 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 240.9 | MTR | 18.24 | ₹4,394.02 |
| 10 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 481.8 | M3 | 298.22 | ₹1,43,682.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_2459730.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .