Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.7 L
EMD Value
₹5,500
Closing Date
4 Nov 2026, 1:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE-WS(W)
KMC, 212, Rashbehari Avenue, Kolkata -700019
RESTORATION FOR FILTERED WATER SUPPLY AGAINST CONTAMINATION AT 11B/1, 11/J,11H BEDIA DANGA 2ND LANE WITH SOME ALLIED WORKS IN WD NO - 67.
2026_KMC_1045304_1
KMC/WS/PG_67/T-15/26-27
Open Tender
CIVIL WORKS
Percentage
12 days
AT 11B/1, 11/J, 11H BEDIA DANGA 2ND LANE
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,500
Yes
8 Oct 2026
8 Oct 2026
6 Nov 2026
8 Oct 2026
4 Nov 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C | 26.19 | MTR | 192 | ₹5,028.48 |
| 2 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day | 42.2 | MTR | 214 | ₹9,030.8 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 15 | MTR | 240 | ₹3,600 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation | 10 | MTR | 319 | ₹3,190 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.8 Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptusor other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately. a) 75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/other approved timber posts @ 1.60m apart (i) Railing with 4 rows. | 65.07 | %M3 | 119.27 | ₹7,760.3 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 348 | KG | 61 | ₹21,228 |
| 7 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately.(ii) 900 mm. x 600 mm. size of board. | 143 | %MT | 14 | ₹2,002 |
| 8 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.13 Hire & labour charges for diesel generating set for lighting including fuel,300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period. | 6 | EA | 91 | ₹546 |
| 9 | CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] | 13 | EA | 74 | ₹962 |
| 10 | CHAPTER - III TAKING OUT PIPES AND SPECIALS Cast Iron / Ductile Iron Pipes and Specials M.S. Pipes and Specials Shifting house connection or stand post connection from existing main to new main after excavation through any kind of soil and road materials up to required depth. dismantling existing ferrule with all fittings. plugging hole of old main with G.I. plug. drilling and tapping the new main. refixing the ferrule on the new main with serviceable old G.I pipes and other specials (New G.l. pipes and other specials. if required to be installed shall be paid extra) and back filling the trench with excavated materials all complete as per specification and direction of the Engineer- in-Charge. | 13 | EA | 822 | ₹10,686 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_2562678.xls
BOQ • 0.35 MB
tbid.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .