Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.3 LAccepted-AOC | ₹20.3 L Quoted ₹17.2 L | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status |
| 2 | Rejected-Technical BELTIKARI BASAHAT PALI ROAD DIPKA DIST KORBA CG | KORBA | CHHATTISGARH | 495119 | - | - | Rejected-Technical Rejected as the bidder attains L-3 status |
| 3 | Rejected-Technical JANGAL SIDE TELSARA ROAD BANKI MONGRA POST KORBA DISTT KORBA C G PIN 495447 | KORBA | CHHATTISGARH | 495447 | - | - | Rejected-Technical Rejected as the bidder attains L-4 status |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected as the bidder attains L-5 status |
| 5 | Rejected-Technical 0 GOPAL GANJ CHABUTRA KE SAMNE PRATAPGARH PRATAPGARH PRATAPGARH RAJASTHAN 312605 UDYAM RJ 27 0002563 | PRATAPGARH | RAJASTHAN | 312605 | - | - | Rejected-Technical Rejected as the bidder attains L-2 status |
| Sl No | Description | Qty | Unit | HANUMAN PRASAD PANDEY L4 | V R ENTERPRISES L2 | GOVIND KASHYAP L3 | MS ENTERPRISES L5 | S.K.ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Regular cleaning of spilled over coal/slush/dust etc. from in and around belt conveyor walkway, platforms of discharge house, tail end, below return belt etc. and disposing removed/ dust/ muck/ coal pieces on belt conveyor during maintenance/shift change over etc. when belt is not in operation. | 2,99,244 | Sq. mtr | 3 ₹9.0 L | 1.7 ₹5.1 L | 2 ₹6.0 L | 2.3 ₹6.9 L | 2.01 ₹6.0 L |
| 2.00 | Removing, gathering and stacking of coal/slush/loose, earth much etc. deposited in and around CHP structures, crushers, drive house, take up structures etc. during operation of plant, where it can not be disposed on conveyor belts and has to be removed, gathered manually and stacked within a lead of 50 mtrs away from CHP structures (columns, gantry support, bunker), Belt structure, Crusher structures etc. as per instructions of Engineer Incharge | 7,387.2 | Cum | 80 ₹5.9 L | 98 ₹7.2 L | 40 ₹3.0 L | 50 ₹3.7 L | 53.96 ₹4.0 L |
| 3.00 | Assistance in cleaning in back-shifts (second and night shift) for smooth operation of feeder breakers, secondary crushers, belt conveyors, bunker gate for loading of trucks from steel bunkers of all running feeder breaker circuit at Mini CHP for a period of 180 days. Scope of work: To provide assistance of 02 nos. unskilled manpower in back shifts (second and night shift) i.e. 04 nos. unskilled manpower per day for cleaning in back-shifts (second and night shift) for smooth operation of feeder breakers, secondary crushers, belt conveyors, bunker gate for loading of trucks from steel bunkers of all running feeder breaker circuit at Mini CHP. | 180 | Day | 3,800 ₹6.8 L | 2,799 ₹5.0 L | 7,000 ₹12.6 L | 7,200 ₹13.0 L | 4,000 ₹7.2 L |
| 4.00Note: The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 18 nos. | ||||||||
| 5.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - | - |
Tender Value
₹46.8 L
EMD Value
₹58,500
Closing Date
27 Aug 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Regular cleaning of spillage coal dust/slush/slurry etc including feeder breakers,associated secondary crushers and belt conveyors,steel bunkers etc of all running feeder breaker circuit at Mini CHP for a period of 180days at Dipka Expansion Project.
2025_SECL_341483_1
SECL/GM/DA/SO(EnM)/ e-tender/25-26/71 dtd-13/08/25
Open Tender
Electrical and Maintenance Works
180 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
3 documents required · 3 mandatory
₹58,500
7 Feb 2026
14 Aug 2025
29 Aug 2025
14 Aug 2025
27 Aug 2025
15 Aug 2025
14 Aug 2025 - 21 Aug 2025
Amount
Regular cleaning of spilled over coal/slush/dust etc. from in and around belt conveyor walkway, platforms of discharge house, tail end, below return belt etc. and disposing removed/ dust/ muck/ coal pieces on belt conveyor during maintenance/shift change over etc. when belt is not in operation.
Removing, gathering and stacking of coal/slush/loose, earth much etc. deposited in and around CHP structures, crushers, drive house, take up structures etc. during operation of plant, where it can not be disposed on conveyor belts and has to be removed, gathered manually and stacked within a lead of 50 mtrs away from CHP structures (columns, gantry support, bunker), Belt structure, Crusher structures etc. as per instructions of Engineer Incharge
Assistance in cleaning in back-shifts (second and night shift) for smooth operation of feeder breakers, secondary crushers, belt conveyors, bunker gate for loading of trucks from steel bunkers of all running feeder breaker circuit at Mini CHP for a period of 180 days. Scope of work: To provide assistance of 02 nos. unskilled manpower in back shifts (second and night shift) i.e. 04 nos. unskilled manpower per day for cleaning in back-shifts (second and night shift) for smooth operation of feeder breakers, secondary crushers, belt conveyors, bunker gate for loading of trucks from steel bunkers of all running feeder breaker circuit at Mini CHP.
Note: The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 18 nos.
Total impact of GST for the purpose of CTC
V R ENTERPRISES (BID ID -1178602)
GOVIND KASHYAP (BID ID -1178678)
HANUMAN PRASAD PANDEY (BID ID -1178558)
MS ENTERPRISES (BID ID -1178614)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid