Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹34.8 L+₹1.9 L (5.78%)Rejected-Finance 205 IIND PHASE INDUSTRIAL AREA BARMER 344001 | BARMER | BARMER | RAJASTHAN | 344001 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹38.5 L+₹5.6 L (17.0%)Rejected-Finance | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹46 L+₹13.1 L (39.8%)Rejected-Finance | L4 | Rejected-Finance Other than lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
25 Mar 2020, 6:00 pmClosed
GE AF UTARLAI
GARRISON ENGINEER AIR FORCE UTARLAI PB NO 11 BARMER (RAJ) PIN 344001
REPAIR TO TOP SURFACE OF RUNWAY IN TECH AREA AT AF STN UTARLAI
2020_MES_330668_1
8711/04/E8 dt 03 Mar 2020
Open Tender
Civil Works
Item Rate
180 days
GE AF UTARLAI
As per NIT
7 documents required · 7 mandatory
₹500
GE AF UTARLAI
₹98,000
Yes
9 Apr 2020
3 Mar 2020
26 Mar 2020
3 Mar 2020
25 Mar 2020
13 Mar 2020
Amount
Removal of Rubbers deposits from runway surfaces (Rigid and / or Flexible) using waterblasting cum vaccuming system with suitable operating pressure and water pressure without use of any chemical & causing no damage to the existing surfaces complete all as specified and directed. Notes : - (i) The work shall be carried out through authorised and qualified applicator . (ii) Total Rubbers deposits should be removed and the Debries/Water to be Vaccumed Simultaneously leaving no FOD so that the Runway is available for operation immediately. (iii) The Machine make to be deployed for Runway Rubbers Removal shall have E-in-C's approved eg. SH8000, SH5000 , Sk3000 of make STRIP HOG or equivalent. (iv) Rubber Deposit Should be in solid form when finally disposed off outside of MOD land . (v) In any emergency condition, the machine (along with workers) shall be vacate from the Runway in less than 3 minutes without leaving FOD . (vi) Friction Test shall be carried out before and after Rubbers Deposits removal operation.The requisite friction testing machine will be arranged by the contractor at his own cost. Nothing extra will be admissible to the contractor on this account .Tenderer is hereby advised to keep this factor in mind before quoting his rates. Detailed description of friction test machine is available in the Office of Engineer-in-Charge . (vii) After carrying out rubber removal operation on the Runway, the friction reading of the rubber removed segment /area should be minimum 0.55 µ. (viii) Work to be carried out by truck-mounted mechanically operated machine under strict supervision of related experienced person.
National Rewinding Works
M.Ramanaiah
Ruchira Associates
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .