Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-Finance | ₹18.2 L | L1 | Accepted-Finance ACCEPT |
| 2 | L2₹18.2 L+₹2,005.38 (0.11%)Accepted-Finance | ₹18.2 L+₹2,005.38 (0.11%) | L2 | Accepted-Finance ACCEPT |
| 3 | L3₹18.2 L+₹2,369.99 (0.13%)Accepted-Finance | ₹18.2 L+₹2,369.99 (0.13%) | L3 | Accepted-Finance ACCEPT |
Tender Value
₹21.5 L
EMD Value
₹36,461
Closing Date
10 Jun 2026, 2:00 pmClosed
EO NP DOSTPUR
NAGAR PANCHAYAT DOSTPUR
MO KAJIYAN DAKSHIN ME TALAB SE PULIYA TAK COVERD RCC NALA NIRMAN KARYA.
2026_DOLBU_1153087_1
44/NPDSUL/2026-27
Open Tender
Civil Works
Piece-work
DOSTPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,151
Yes
FC
₹36,461
Yes
15 Jun 2026
25 May 2026
10 Jun 2026
25 May 2026
10 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm.in depth but exceeding 1.5 m in width etc. complete as per SOR 2.6.1 | 292.5 | cum | 125 | ₹36,562.5 |
| 2 | Disposal of Malwa 3 Km distance etc. complete AS per SOR 231(a)3 Same item no 1 for 100% | 292.5 | cum | 146.2 | ₹42,763.5 |
| 3 | Sand Filling and compaction at site with all etc. complete. As per SOR 12. (iii) | 37.5 | cum | 400 | ₹15,000 |
| 4 | P/L GSB for G1 by providing C. Grade Material Spreding in uniform layers with proper etc. complete As per Analysis | 18.75 | cum | 3,402.41 | ₹63,795.19 |
| 5 | P/L cement concrete 1:1.5:3 cement coarse sand &20 mm graded stone aggregate etc. complete.As per SOR.5.1.2. | 103.15 | cum | 8,120 | ₹8,37,578 |
| 6 | Centering & Shuttering etc. complete Raft As per SOR.5.9.1. | 20 | sqm | 170 | ₹3,400 |
| 7 | Centering & Shuttering etc. complete Wall As per SOR. 5.9.2 | 356 | sqm | 330 | ₹1,17,480 |
| 8 | Centering & Shuttering etc. complete Slab As per SOR.5.9.3. | 225 | sqm | 370 | ₹83,250 |
| 9 | Mild Steel in R.C.C. Work etc. complete As per Analysis | 77.65 | qtl | 7,768.44 | ₹6,03,243.99 |
| 10 | Dewatering of water with 5 HP Desial pumb at site with all complete | 100 | hour | 200 | ₹20,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_2160126.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .