Loading…
Loading…
Tender Value
₹4.7 L
EMD Value
₹9,500
Closing Date
9 Jun 2026, 9:00 am4d left
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O wire crate B.wall at Km. 0.380 to 0.403.80
2026_PWD_135439_1
PW/RMP/TA/2026-4003 dated 01.06.2026
Open Tender
Civil Works - Roads
EE B and R Division HPPWD Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
Yes
₹9,500
Yes
3 Jun 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
3 Jun 2026 - 9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 73.78 | Per cubic meter | 350 | ₹25,823 | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 8.57 | Per cubic meter | 559 | ₹4,790.63 | BI01010001010000000000000515BI0100001113 |
| 3 | Providing and laying boulder apron laid in wire crates mate with G.I.wire confirming to IS :280 & IS 4826 in 100mmx100mm mesh (weaved diagonally including 10% extra for laps and joints laid with stone boulder weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including hauling of materials through all modes of transportation within all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 134.78 | Per cubic meter | 3,286 | ₹4,42,887.08 | BI01010001010000000000000515BI0100001113 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_200610.xls
BOQ • 3.54 MB
SBD.pdf
Tender Documents • 2.81 MB
Download all tender documents and submit your bid