Head CLG, CPD, Mumbai
15th Floor, Maker Tower-E, Cuffe Parade, Mumbai
Conductor Supported Platform Project
2026_ONGC_297735_1
ZW1PC26008
Global Tenders
Miscellaneous Works
Lump-sum
734 days
Offshore Mumbai
As per Tender Document
14 documents required · 14 mandatory
₹0
₹1.9 Cr
Yes
Mumbai
7 Jan 2027
13 Nov 2026
8 Jan 2027
13 Nov 2026
7 Jan 2027
27 Dec 2026
13 Nov 2026 - 27 Nov 2026
25 Nov 2026
120 days
Appendix A-10 Format for Milestone Payment Formula for "Conductor Supported Platform Project"
(A) (B) (C) (D) (E) Consortium Member (1) Consortium Member (2)
1.1 Insurance 2.65 2.65 85 a. Upon submission of certificate of insurance (Cover Note) for insurance policy(s) specific for the project (including Contractor’s All Risk (CAR) policy) acceptable to Company in terms of clause 7.3 of GCC and proof of 100% premium paid to Insurance Company. X X
15 b. Upon submission of original CAR Insurance Policy(s) and other policy(s), as per Clause 7.3 of Contract, specific for the project and its acceptance by Company or Completion of Project, which ever is later. X X
Sub-Total: Insurance 2.65 2.65
Note: Milestone Payment against insurance will be made in the respective currencies of the lump sum quote of the bidder
(A) (B) (C) (D) (E) Consortium Member (1) Consortium Member (2)
2.0 PROCUREMENT OF MATERIAL – STRUCTURAL (Note:1. Basis of Milestone achievement shall be total weight of tubular, wide flange beams, etc. as per MTO‘s for which order is placed. Total tonnage shall be provided during design engineering)
2.1 N-25 Platform
2.1(i) Substructure, Substructure appurtenances, piles & conductors 28.35 25.44 5 60 35 a. Upon progressive placement of PO and acceptance by vendor. b. Upon progressive dispatch from vendor works and submission of supporting documents thereof. c. Upon progressive arrival at fabrication yard, submission of mill inspection and test reports, verification of receipt of material by TPI/ CA and clearance of punch points related to above procurement milestones, if any X X
2.1(ii) Deck (Super structure) facilities as per scope of work. 2.91 X X
Sub-total: Procurement of Material-Structural 28.35 28.35
3.0 PROCUREMENT OF EQUIPMENT & MATERIALS EXCLUDING STRUCTURAL
3.1 N-25 Platform
3.1(i) Deck (Super structure) facilities including aluminum Helideck as per scope of work 17.77 17.10 5* 10* (5+5) 60 20 5 a. Upon progressive Placement of LOI/ PO and acceptance by Vendor. b1. 05% Upon progressive approval of prelim Purchase Specifications at 1st Stage, for PS items, as applicable. # b2. 05% Upon progressive approval of final Purchase Specification at 2nd Stage, for PS items, as applicable. # c. Upon progressive dispatch from vendor works and submission of inspection & dispatch documents d. Upon progressive arrival at fabrication yard/ site submission of material test certificates and test reports, verification by TPI/CA and acceptance by Company. e. Upon progressive submission of release note of Certification Agency & clearance of punch points related to the above procurement milestones, if any. X X
3.1(ii) Cathodic Protection 0.67 X X
Sub-total: Procurement of equipment & materials excluding structural 17.77 17.77
Notes: * Applicable where the selected vendor is from ONGC’s vendor list or where PQD has already been approved by ONGC before place-ment of LOI. For others, where PQD is not approved before LOI, payment against milestones a & b above (i.e. placement of LOI & up-on approval of PS) will be released together and Contractor will get 15% on completion of milestone ‘a’ and ‘b’ together. # For non-PS-items, 10% (b1 & b2 above) shall be clubbed with dispatch of material milestone (c).
4.0 FABRICATION – STRUCTURAL
4.1 N-25 Platform
4.1(i) Substructure, Substructure appurtenances, piles & conductors 22.35 16.93 85 10 5 a. Upon progressive completion of fabrication as certified by Company b. Upon completion of respective sail out. c. Upon clearance of Punch point related to the above fabrication milestones, if any X X
4.1(ii) Deck (Super structure) facilities as per scope of work 5.42 X X
Sub-total: Fabrication -Structural 22.35 22.35
5.0 FABRICATION-EXCLUDING STRUCTURAL
5.1 N-25 Platform
5.1(i) Deck (Super structure) facilities as per scope of work 3.88 3.42 85 10 5 a. Upon progressive completion of fabrication as certified by Company b. Upon completion of respective sail out c. Upon clearance of Punch point related to the above fabrication milestones, if any X X
5.1(ii) Cathodic Protection 0.46 X X
Sub-total: Fabrication - Excluding Structural 3.88 3.88
6.0 SURVEY (PRE-ENGINEERING / PRE-INSTALLATION/ POST-INSTALLATION)
6.1 N-25 Platform 3.38 3.38 40 20 40 a. Upon completion of pre-engineering survey and submission of complete survey report and its acceptance by Company. b. Upon completion of pre-installation survey and submission of complete survey report and its acceptance by Company. c. Upon completion of post- installation survey and submission of complete survey report and its acceptance by Company X X
Sub-total: Surveys 3.38 3.38
7.0 DESIGN ENGINEERING
7.1 N-25 Platform 2.53 2.53 100 Upon progressive completion of Engineering as approved and certified by Company X X
Sub-total: Design Engineering 2.53 2.53
8.0 INSTALLATION (INCLUDING TRANSPORTATION)
8.1 Substructure, Substructure appurtenances, piles, conductors
8.1(i) N-25 Platform 3.40 3.40 5 75 10 5 5 a. Upon arrival of Substructure, piles , conductors at offshore site b. Upon completion of installation of Substructure including driving of piles, conductors & drilldeck c. Upon completion of respective grouting, installation of Substructure appurtenances and re- moval of installation aids. d. Upon acceptance of conductors when the drilling bit (26 inch) passes successfully through the conductor or two years from the date of taking over the platform whichever is earlier (Refer note 10 under General notes). e. Upon clearance of punch points related to Installation, if any X X
8.2 Deck (Super structure) facilities as per scope of work
8.2(i) N-25 Platform 0.78 0.78 5 85 10 a. Upon arrival of respective items at offshore site. b. Upon completion of installation of respective items. c. Upon Clearance of punch points of installation, if any X X
Sub-total: Installation 4.18 4.18
9.0 HOOK-UP, PRE-COMMISSIONING & COMMISSIONING
9.1 Well Platforms
9.1(i) N-25 Platform 10.91 10.91 80 10 10 a. Upon progressive completion of work. b. Upon completion of commissioning. c. Upon submission of Certificate of Approval for the facilities from Certification Agency X X
Sub-total: Hook-up, Pre-commissioning & Commissioning 10.91 10.91
Total Weightage of I.A 96 96
10.0 LIQUIDATION OF FINAL PUNCH POINTS
10.1 Liquidation of Final Punch Points 2 % of I.A of A-3 2.00 100 Upon completion of Punch Points related to Hookup, Pre-com- missioning, commissioning activity, if any X X
Sub-Total: Liquidation of Punch Points 2.00 2.00
11.0 AS-BUILT DOCUMENTATION
11.1 As-Built Documentation 2 % of I.A of A-3 2.00 100 Upon submission of As-built drawing, documents, Software Files (as applicable), Vendor dossiers, Operation & Mainte- nance Manuals etc. for the Project Scope and acceptance by Company. X X
Sub-Total: As-Built Documentation 2.00 2.00
12.0 GOODS AND SERVICE TAX
12.1 Good and Service Tax 100% of I.C of A- 3 100.00 Payable at actual, limited to the amount indicated herein, along with relevant milestone as per invoice under Goods and Service Tax rules subject however to provisions of change in law as per clause no. 7.6 (Subsequent legislation) of GCC. X X
13.0 CUSTOMS DUTY
13.1 Customs Duty 100% of I.B of A- 3 100.00 Reimbursement at actual limited to the amount indicated herein on submission of documentary proof viz. bill of entry in original duly endorsed by the Custom Authority and the amount of duty paid thereof along with relevant supporting documents subject however to provisions of change in law as per clause 7.6 (subsequent legislation) of GCC. X X
1. The requirement of dispatch/sail out wherever referred shall be the “Bill of Lading” for dispatch (as applicable) and certificate of carrier for sail out (as applicable).
2. Basis of Milestone achievement for Sl. no 3 (Procurement of Equipment & Materials Excl. Structural) shall be as per weight factors of major equipment as per Annexure – 1 wherever applicable.
3. All yard and offshore related activities to be inspected and certified by Certification Agency/ Third Party Inspection Agency.
4. Release notes shall be issued by Certification Agency.
5. Milestones to be submitted Platform wise/ Pipeline Segment Wise.
6. For single bidder/ joint venture, bidder to indicate 100% against percentage breakup of weight factor against each activity.
7. For Consortium bidder, where payment is to be made to each consortium member, consortium bidder should insert additional column for each consortium member and indicate percentage breakup of weight factor against each activity to be performed by each member. Payment will be made accordingly.
8. Refer para 2.6 (ii) above, though job is there against this line item, but not being considered for milestone payment and hence milestone weightage is not mentioned.
S No Items % Payment to each consortium member if applicable
Consortium member 1 Consortium member 2
1 Steel for Structural steel X X
2 Diesel fuel X X
10. Payment for the activity / milestone under Sl no 8.1(d)(Substructure, Substructure appurtenances, piles & conductors) can be considered for release subject to submission of performance bank guarantee (equivalent to 5% milestone payment plus GST) valid for a period of two years beyond the date of taking over of the platform.
11. The Bidder shall give self-certification for local content in the quoted item (goods/works/services) at the time of tendering. However, at the time of execution of the project, for all contracts above INR 10 Crore, the contractor/ supplier shall be required to give local content certification duly certified by cost/ chartered accountant in practice. For cases where it is not possible to provide certification by Cost/Chartered Accountant at the time of execution of project, the supplier shall be permitted to provide the certificate for local content from Cost/ Chartered Accountant after completion of the contract, but not later than Final Bill submitted by the contractor/supplier. In case the contractor/ supplier does not meet the stipulated local content requirement and the category of the supplier changes from Class-I to Class- 11/ Non-local or from Class-I I to Non-local, a penalty upto 10% of the contract value shall be imposed by ONGC. The same shall be recovered from the Final Bill(s) and/or Security deposit or any other amount due to the contractor/supplier in ONGC. However, contract once awarded shall not be terminated on this account. Payment of last 10% of Contract value shall be made only after receipt of aforesaid certificate for local content from Cost/ Chartered Accountant.
Annexure- 1 to Appendix-A10 (Weight Factor for major equipment for Well Platforms
S No Equipment/ items Weight Factor (%)
1 Pipes, Fittings and Flanges 3.00
2 Valves - Ball, Globe, Gate, Check, Control and Safety 10.00
3 Piping Specialty items 7.00
1 Deck Crane 13.00
3 RTU/SCADA System 7.00
4 Pressure Instruments (Pressure Indicator, Pressure Transmitter, Pressure Switches) 5.00
5 Temperature Instruments (Temperature Indicator, Temperature Transmitter, Temperature Element) 5.00
6 Flow Instruments (Senior Orifice, Flow Transmitter, Restricted Orifice) 5.00
7 Safety Items 6.00
8 Hydro-electric Shutdown Panels 5.00
9 F&G Detection and Suppression System 6.00
10 Electrical items like transfomers, switchgear, solar panel system etc. 5.00
11 Wellhead Hookup material 4.00
12 Navigation Aid 2.00
13 Electro Hydrualic System 5.00
14 Miscellaneous (Other than above items) 5.00
BID PACKAGE FOR CONDUCTOR SUPPORTED PLATFORM PROJECT PART – III APPENDICES
I.A. LUMP SUM PRICE
Price (Indicate Currency*/Currencies*)
Sr. No. ITEM Unit rate (per MT) FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.A (i) a. Lump sum price of materials, excluding b, for execution of entire work scope as described in the bid document incl. addendum, if any (EXCLUDING Customs duty, if applicable on imported materials/equipment/items as per 3.4.1). Not Applicable X X
b. Price of steel, excluding taxes and duties, for Structural steel for total estimated weight of 3000 MT * (E) y* (currency) (E) x (y) (currency)
Sub total I.A (i) [ I.A (i)a + I.A (i)b] X X
*The unit rates of steel for structural steel - (y) and total estimated weight of structural steel (E) indicated at I.A.(i)(b) above shall be used for dynamic price mechanism of steel in terms of GCC clause no. 3.5.3 (a). The rate of GST for dynamic price of steel [GCC clause no.3.5.3(a)] shall be considered as per GST rate applicable for LSTK Contract. The list of structural steel to be considered for steel price variation is brought out below at Annexure – B to Appendix A-3.
Sr. No ITEM Unit rate (per MT) FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.A (ii) (a) Lump sum price of services, excluding I.A (ii) (b) & I.A (ii) (c), for execution of entire work scope as described in the bid document incl. addendum, if any Not Applicable X X
Subtotal I.A (ii)(a) X X
Sr. No Marine Spread Mobilization & Demobilization** (one Mobilization and corresponding Demobilization will be taken as one unit) No. of Mob & Demob during schedule completion period Unit Rate (Foreign / Indian currency) Total cost of Marine Spread Mobilization & Demobilization
Foreign Currency (ies) Indian currency
I.A (ii) (b) a. Survey Spread X X X X
b. Dive Survey Spread X X X X
c. Saturation Diving Spread (DP Vessel) for diving Works X X X X
d. Subsea structure installation by Jack-up Rig NA NA NA NA
e. Deck Installation by Jack-up Rig NA NA NA NA
f. Hook-up and accommodation Barge Spread X X X X
g. Work Boat (Min 50 POB). X X X X
h. Supply Vessel (Locally Hired) X X X X
i. Transportation Spread (Cargo Barge + Tow Tug). X X X X
Subtotal I.A (ii) (b) X X
** This is Lump sum turnkey contract. Individual mob & demob rates quoted in Table IA(ii)(b) above is part of the bid evaluation and same shall also be referred for calculating the applicable Rate for mob & demob for change orders, if any, with reference to the original scope of work.
Sr. No Marine Spread operating cost*** (Excluding Mobilization & demobilization) Estimated Number of Barge Days by the bidder Total operating cost [FOREIGN CURRENCY (IES)] Total operating cost [INDIAN CURRENCY]
I.A (ii) (c) a. Survey Spread X X X
b. Dive Survey Spread X X X
c. Saturation Diving Spread (DP Vessel) for diving Works X X X
d. Subsea structure installation by Jack-up Rig NA NA NA
e. Deck Installation by Jack-up Rig NA NA NA
f. Hook-up and accommodation Barge Spread X X X
g. Work Boat (Min 50 POB). X X X
h. Supply Vessel (Locally Hired) X X X
i. Transportation Spread (Cargo Barge + Tow Tug). X X X
Subtotal I.A (ii) (c) X X
***This is Lump sum turnkey contract. Individual marine spread rates quoted in Table 1A (ii) (c) above is part of the bid evaluation and same shall also be referred for calculating the applicable operating Day Rate for change orders, if any, with reference to the original scope of work. All marine spreads rates should be inclusive of required associated support vessels, man power, consumables, etc.
FOREIGN CURRENCY (IES) INDIAN CURRENCY
Subtotal I.A.(ii) [ I.A.(ii) (a) + I.A.(ii) (b) + I.A.(ii) (c) ] X X
FOREIGN CURRENCY (IES) INDIAN CURRENCY
Subtotal I.A. [ I.A.(i) + I.A.(ii) ] X X
I.B. CUSTOMS DUTY (Basic Customs Duty)
Price (Indicate Currency/Currencies)
Sr. No. PARTICULARS FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.B i) Customs duty on “imported materials/equipment/items” as per Clause 3.4.1.1 X X
ii) Customs duty on imported materials/equipment/items and on Constructional Plant and equipment as per 3.4.1.3 X X
iii) Customs duty on “As built Documents” as per Clause 3.4.1.4 X X
Sub Total I.B. [I.B.(i) + I.B.(ii) + I.B.(iii)] X X
I.C. GOODS AND SERVICE TAX
Price (Indicate Currency/Currencies)
Sr. No. PARTICULARS FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.C Goods & Service tax (GST) as applicable on the quoted price in I.A and I.B X X
Subtotal I.C X X
I.D. TOTAL LUMP SUM PRICE
Price (Indicate Currency/Currencies
Sr. No. PARTICULARS FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.D Total Lump sum price for execution of the entire scope of work as per details in the bid document (I.A + I.B + I.C) X X
Note: i. In case of more than one foreign currency, add more columns. ii. Total lump sum price quoted by the bidder shall be inclusive of all costs inter alia, insurance, taxes and duties.
Local Content [prices for goods, works, or services including Indian Agent Commission sourced in India] For foreign bidders in Percentage (%)
Import Content (for Indian bidders) in Percentage (%)
1. Bidder to note that total lump sum price quoted at I.D is inclusive of all activities including Insurance, Survey, Design & Engineering, Procurement of Materials, Fabrication, Transportation, Offshore Installation, hook up, pre-commissioning, commissioning (where ever applicable) and dismantling / removal / transportation and handover of old dismantled scrap materials at ONGC, Nhava, all taxes & duties and all associated costs whatsoever for the entire scope of work as indicated in the bid package including Addendums if any. Bidder to refer Special conditions of contract for dismantling/removal/transportation and handover of old dismantled scrap materials at ONGC Nhava and include all corresponding costs as per scope in their total lump sum price. Bidder to also refer GST Rate notification 3/2017 under GST Act and Customs notification No. 23/2008 dated 01.03.2008, Customs notification No. 72/2017 dated 16.08.2017, Customs notification No. 50/2017 dated 30.06.2017 (including sl no 557B) and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time). Bidder to also refer notification 36/2025-Cus. dated 17.09.2025 (as amended from time to time) and other relevant notifications and its amendments till date issued under Customs Act and GST Act.
2. Bidder to note that cost of material shall include cost of all materials/equipment etc. required to be incorporated in the works including but not limited to aids for fabrication, transportation, installation, cost of mandatory spares, any special tools & tackles, lubricants, chemicals and consumables required for pre-commissioning, commissioning and start up (where applicable).
6. All the new and existing facilities under the tender are operated by ONGC and are covered under Petroleum Mining Lease.
8. In case of Consortium bid, the bidder may indicate the member wise payment schedule in the Appendix A – 10, Milestone payment Formula for their respective scope of work.
10. Bidders shall raise Invoices of each Milestones as per Milestone Payment Formula clearly showing material value and/or Services value as applicable for LSTK project.
11. The Bidders are to quote firm prices. Foreign bidders can quote the price and receive payments either in Indian Rupees or US Dollars or Euros or Pound Sterling or Yen or other relevant currencies, or a combination thereof. However, prices for goods, works, or services (including Indian Agent Commission) sourced in India must be quoted and shall be paid by ONGC only in Indian Rupees to the extent of their Local Content indicated in the bid. In all cases, Indian Agent commission shall be paid in INR only. Indian bidders are required to quote in INR only, however Indian bidders can quote and receive payment in foreign currency to the extent of their import content indicated in the bid. The freight and insurance elements must be quoted by Indian bidders in Indian Rupees only and payment will be made accordingly. The payment towards GST will be made by ONGC in Indian Rupees as per actuals, irrespective of Indian or Foreign bidder. For this purpose, the amount of GST paid as per the invoice signed by the officer duly authorized for this purpose will be taken into account. Currency once quoted will not be allowed to be changed.
12.a. Currency of quote (for Indian bidders) shall be INR only. b. Indian Bidders are required to quote the import content in percentage terms. c. To the extent of their quoted % of import content, bidders will be paid for in foreign currency(ies). d. Foreign currency payment will not exceed the quoted import content and payment will be regulated accordingly. However, total payment (including payments made in foreign currency) shall not exceed the lumpsum awarded price.
13. FOR INDIAN BIDDERS: 1 Definition of Import Content: Total value of goods, works, or services sourced from outside India 2 Indian bidders are required to quote in INR only. However, Indian bidders can quote and receive payment in foreign currency to the extent of their import content indicated above. The payment towards GST will be made by ONGC in Indian rupees as per actuals. 3 The bidder shall specify the foreign currency in which payment for the declared import content is requested. Payment against each invoice, limited to the declared import content portion, shall be made in specified foreign currency. The import content portion/percentage will be deducted from INR invoice value and paid in foreign currency. Foreign currency conversion from INR for the purpose of payment of the declared import content will be governed as follows: a. The closing currency exchange rate as applicable on the day prior to the price bid opening as per "Daily" Closing exchange rate published on Thomson Reuters internet site https://in.reuters.com/markets/currencies, upto three places of decimal, will be taken into account for conversion of INR into foreign currency. The exchange rates presently appearing on the right-hand corner of the exchange rate chart of the said internet site shall be considered as closing rate for the day. b. Where the time lag between opening of price bid and final decision exceeds three months, the currency exchange rate as above on the day prior to date of final decision will be adopted for conversion of INR into Foreign Currency.
14. FOR FOREIGN BIDDERS: Definition of local content: Total value of goods, works, or services sourced in India including Indian Agent Commission and excluding GST Advisory Note: The declared local content above should not be lower than the "Local Content confirmed under the Public Procurement (Preference to Make in India) (PPP-MII) Order, 2017, dated 19.07.2024 (as amended from time to time), issued by the Department for Promotion of Industry and Internal Trade (DPIIT), Government of India, under Order No. P-45021/2/2017-PP(BE-II)-Part(4) Vol.II Foreign bidders can quote the price and receive payments either in Indian Rupees or US Dollars or Euros or Pound Sterling or Yen or other relevant currencies, or a combination thereof. However, prices for goods, works, or services (including Indian Agent Commission) sourced in India must be quoted and shall be paid by ONGC only in Indian Rupees to the extent of their Local Content indicated in the bid. In all cases, Indian Agent commission shall be paid in INR only. Payments toward each invoice, corresponding to the local content specified in the bid, shall be made in INR. The local content portion /percentage will be deducted from forex invoice value (as per contractual rates) and paid in INR. Conversion from the quoted foreign currency to INR shall be carried out based on the following: a. The closing currency exchange rate as applicable on the day prior to the price bid opening as per "Daily" Closing exchange rate published on Thomson Reuters internet site https://in.reuters.com/markets/currencies, upto three places of decimal, will be taken into account for conversion of foreign currency into Indian Rupees. The exchange rates presently appearing on the right-hand corner of the exchange rate chart of the said internet site shall be considered as closing rate for the day. b. Where the time lag between opening of price bid and final decision exceeds three months, the currency exchange rate as above on the day prior to date of final decision will be adopted for conversion of foreign currency into Indian Rupees.
15. Bidders cost of material at I.A. (i) shall be the CIF cost (in case of import) / Ex-works cost (In case of domestic supplies).
16. If sucessful bidder is selected as per PPP-MII then, the bidder shall ensure that the percentage of local content declared in Appendix A-3 in accordance with relevant Para of ITB and the Public Procurement (Preference to Make in India) Order is actually achieved during execution of the Contract and shall submit Local Content Certification, duly certified by a Cost Accountant or Chartered Accountant in practice, during execution of the project but not later than submission of the Final Bill or before achieving ninety percent (90%) of financial progress, whichever is earlier. Failing submission of such certification within the stipulated time, ONGC shall withhold ten percent (10%) of the Contract Value, and payment of the last ten percent (10%) of the Contract Value shall be made only after receipt and acceptance of the aforesaid Local Content Certification, confirming compliance with the local content category declared at the time of tendering. Further, in the event the Contractor fails to meet the declared local content requirement resulting in change of supplier category from Class-I to Class-II/Non-Local or from Class-II to Non-Local, ONGC shall levy a penalty of ten percent (10%) of the Contract Value.
17. Prices to be quoted in I.A (i), I.A (ii) and its' sub-components are exclusive of GST. Applicable GST on the quoted price in I.A and I.B to be quoted separately in I.C’
18. Foreign currency payment will not exceed the quoted import content and payment will be regulated accordingly. However, total payment (including payments made in foreign currency) shall not exceed the lumpsum awarded price
19. Note on Invoicing Instructions: Indian Contractor: The Contractor shall raise separate invoices for the foreign currency component (attributable to and limited to the extent of quoted import content) and INR components of the Contract Price. Foreign Contractor: The Contractor shall raise separate invoices for the foreign currency component and INR component [attributable to the quoted Local Content {including but not limited to Goods, Works and / or Services (including Indian Agent’s Commission, wherever applicable) sourced / provided from within India} to be quoted, invoiced and paid for in INR only and not in foreign currency]. Common to Indian and Foreign Contractors: Under no circumstances shall foreign currency and INR amounts be commingled or included in the same invoice. The foreign currency invoice shall be processed for payment in accordance with the provisions of the Contract and shall further be subject to applicable RBI regulations, foreign exchange regulations, and other prevailing statutory requirements.”
20. The bidder shall be deemed to have visited and examined the site, fully acquainted themselves with the existing site conditions, including sub soil strata (if applicable), nature of work, and all factors affecting the execution of work before submission of the price bid.
II- UNIT ADJUSTMENT RATES
II. A For Pipelines - Deleted
II. B For Structural Steel - Deleted
II.C Details of fuel:
1. The total cost of diesel fuel required in the project shall be included by bidder in lump sum price I.D.
2. The total estimated quantity of diesel fuel for which Price adjustment shall be computed as per methodology indicated at GCC clause no. 3.5.3(b) is 500 KL.
III Details of Marine spread:
Marine spread loading for bid evaluation will not be done separately.
IV. COST REIMBURSABLE ADDITIONAL ITEMS (Cost plus %):
(COST PLUS PERCENTAGE)
1. Percentage fee applicable to cost of material used for extra work items. 0.075
2. Percentage fee applicable to equipment subcontracts for extra work. 0.075
3. Percentage fee applicable to labour subcontracts for extra work. 0.075
4. Percentage fee applicable to one year’s spares 0.075
Notes for item IV:
1. In respect of item 1) and 4) above, the percentage shall be applicable on CIF price (Offshore supply base/Contractors yard) for imported items/ FOR Destination price (Offshore supply base/contractors yard) for indigenous items. However, the same shall not be applicable on duties & taxes.
2. The above percentage will also be used by the Company to order bought-out items and extra equipment not included in the Bidding documents.
3. In respect of item 4) above, the cost shall be reimbursed as per provision of clause 5.16 of General Conditions of Contract.
V. CUSTOMS DUTY
Bidder shall furnish break-up of the amount included in the Total lump sum price towards meeting his obligation as per clause 3.4.1.3 of General Conditions of Contract pertaining to Customs Duty.
ITEM (1) Laws/Acts/Rules/regulations reference (2) Tariff indicating rate of tax/duty/fee/charge/levy (3) Amount indicating currency/ currencies (4)
a) Marine Spread x x x
i. Survey Spread x x x
ii. Dive Survey Spread x x x
iii. Saturation Diving Spread (DP Vessel) for diving Works x x x
iv. Subsea structure installation by Jack-up Rig x x x
v. Deck Installation by Jack-up Rig x x x
vi. Hook-up and accommodation Barge Spread x x x
vii. Work Boat (Min 50 POB). x x x
viii. Supply Vessel (Locally Hired) x x x
ix. Transportation Spread (Cargo Barge + Tow Tug). x x x
b) Bidder’s Constructional Plant (other than “a” above), Tools & tackles, consumables etc. likely to be imported into India with the undertaking to re-export (less quantities actually consumed in execution of Works) x x x
Notes for item V :
1. The break-up furnished above shall form the basis for adjustment only to the extent covered under clauses 7.6 (Change in Law) of General Conditions of Contract so far as it pertains to Customs Duty.
2. Bidder agrees that in case the Custom Duty actually levied/imposed on Bidder’s material consumables after deducting the admissible duty drawback/exemption is less that the amount(s) indicated above, then Company shall recover the difference between the net Custom Duty levied/Imposed, after taking into account the admissible duty drawback and the amount(s) indicated by the Bidder. Bidder to refer Customs notification no. 50/2017 (including Sl no 557B) dated 30.06.2017 and 72/2017 dated 16.08.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022, 23/2008-Cus. Dated 01.03.2008 and 36/2025-Cus. dated 17.09.2025 (As amended from time to time) of Govt. of India and all other amendments in the Act. Company shall reimburse custom duty on account of change in law against documentary evidence as per provisions of the contract in clause 3.4 subject to clause 7.6 of GCC. Bidder to also refer ITB clause 10.11 in this regard. Company shall bear the additional custom duty only if it becomes payable in terms of provisions of clause 7.6 of General Conditions of Contract.
3. Bidder shall indicate the details of Customs Law reference and Tariff indicating the duties of customs and rate under column (2) and (3) respectively in the un-priced bid also.
4. The total amount quoted above shall tally with total amount of custom duty quoted in lump sum price I-B (ii)- Customs duty for these items.
5. Change in law shall be applicable only in case of variation of rate of taxes and duties on supply of services to ONGC and not applicable on taxes and duties on input (Goods and Services), in line with clause 7.6.6 of GCC.
6. Change in law shall not be applicable to taxes and duties in respect of subcontractors, vendors etc. of contractors.
VI. CHANGE IN LAWS AND REGULATIONS (Refer clause 3.4 of GCC of tender Documents)
Laws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the Bidder while estimating the incidence of taxes, duties, fees, charges, levies etc. included in the Bidder’s lump sum prices for the Works (as quoted in the Appendix A-3 I.B. (i) & (iii ) and I.C) as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment of Contract Price in the event of change of Law in terms of Clause 7.6 of General Conditions of Contract are as under:
ITEM Bidding Documents Clause Reference Customs laws reference Tariff indicating rate of customs duty (CD) Amount included in the Total Lump sum Price at I.D
Customs duty on “imported materials/ equipment/items” 3.4.1.1 x x x
Customs duty (CD)-on As Built Documents 3.4.1.4 x x x
ITEM Bidding Documents Clause Reference GST Laws reference HSN / SAC Code Tariff indicating rate of GST Amount included in the Total Lump sum Price at I.D
Goods and Service tax 3.4 x x x x
Note for item VI: Refer general note 1
1) Bidder to also refer Customs notification No. 50/2017 (including Sl no 557B) dated 30.06.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time) and GST Rate notification 3/2017 under GST Act. Bidder to also refer notification 36/2025-Cus. dated 17.09.2025 (as amended from time to time) and any another relevant notifications & its amendments till date issued under Customs Act and GST Act.
2) Bidders to go through Clause 7.6 of General Conditions of Contract carefully, while furnishing the above table. If `Not applicable’ write `Not Applicable’.
3) The GST shown above shall tally with the same quoted in Lump sum price – I.C.-Goods and Service Tax.
4) The Customs duty shown above shall tally with total amount of custom duty quoted in lump sum price at I-B (i) & (iii).
5) Bidder shall indicate the details of GST reference and Tariff indicating rate of GST under column 3 and 4 respectively in the un-priced bid also.
6) Change in law shall not be applicable to taxes and duties in respect of subcontractors, vendors etc. of contractors.
7) Change in law shall be applicable only in case of variation of rate of taxes and duties on supply of services to ONGC and not applicable on taxes and duties on input (Goods and Services), in line with clause 7.6.6 of GCC.
VII. Disclosure for availing Deemed Export Benefit for domestic materials and Concessional Customs duty for import of materials:
Bidder shall disclosed the following:-
Sl. No. ITEM Amount (Currencies to be mentioned by the Bidder)
1 Value of domestic materials for which the bidder intend to avail Deemed Export Benefit / GST at concessional rates. X
2 CIF Value of Imported materials for which the bidder intend to avail Concessional rate of Customs Duty / GST. X
1) The total value of domestic materials and imported materials at above table shall be restricted to the quoted price as per I.A.
2) Bidder is allowed to change the indicated amount shown above during the execution based on detailed engineering but the sum of value of goods/ materials on which concessional Customs duties and GST is leviable shall be restricted to the sum of amount indicated price at table I.A.
3) For items under clause 3.4 of Part - II GCC, Certificate and/or Undertaking shall be issued by Company for items covered under list 33 of Notification 50/2017-Cus (including Sl no 557B) as amended by Notification 02/2022-Cus.
4) For items under clause 3.6 of Part - II GCC, PAC as per Deemed Export Policy and recommendatory letter for obtaining EC from DGH shall be issued by Company.
5) Bidder shall refer Customs notification No. 50/2017 (including Sl no 557B) dated 30.06.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time) and GST Rate notification 3/2017 under GST Act. Bidder to also refer notification 36/2025-Cus. dated 17.09.2025 (as amended from time to time) and any another relevant notifications & its amendments till date issued under Customs Act and GST Act.
VIII. Rental Rate Schedule:
(Company has furnished Rate Sheet and Fee Schedules in accordance with Clause 11.2 (d) of Part I “Instructions to Bidders” and Clause 8.1 of Part II “General Conditions of Contract).
Rental Rate Schedule shall be as per day basis, if required, same shall be calculated on pro rata basis. Rental rate schedule is attached at Annexure 1, 2 and 3 as under.
Rental Rate Schedule
S No Equipment Day Rate (INR)
1 Air Compressors: 14191
2 Generator Sets:
3 Nitrogen Generator 14315
4 Hydraulic Jack 5OT & Pump 10581
Hydraulic Jack 25T & Pump 8092
5 Welding Machines:
Diesel upto 400A 5601
Electric 300-600 A 1493
6 Cutting and Burning Outfits:
Multihead Plate Cutting Torch 1743
7 Miscellaneous :
Punch machine 1245
Pipe cut off. Machine 1805
UT machine 5228
Fitter tool box 934
Welder tool box 1245
B) TOOLS AND MISCELLANEOUS :
High Pressure 10892
Centrifugal 13693
Scaffolding Pipe 33
Scaffolding wooden plank 43
Scaffolding Clamp 18
11 Sand blasting & Painting With Air Compressor (excluding sand and/or paint) 15810
Chain Block 10T 374
Chain Block 20T 1058
The rates are inclusive of Percentage fee.
S No Description Rates( per day) in INR
1 Worker/Technician/welder/operator etc. 1820
2 Supervisor 6209
The rates are inclusive of Percentage fee.
S No Engineering Price in INR
1 Drawings 86076
3 Local Analysis of Deck 232962
4 Calculations 106739
5 Purchase Specifications 421388
6 Report 119693
7 Data Sheet 93784
8 Loop Diagram 46892
9 Control Architecture 179539
10 Site survey a) Engineers per day – 12954
b) Draftsman per day – 10492
c) Senior Engineer per day – 15738
The rates are inclusive of Percentage fee. However, all above rates are exclusive of GST. For Annexure-3, please note that site survey rates are on per day basis whereas for others it is based on number of engineering deliverables.
Annexure - A to Appendix A-3
Basis for Facility-wise breakup of lump-sum Cost Weight factors:
S No Facility Substructure including Load bearing conductors Weight Factor* Topside Weight factor
1 CONDUCTOR SUPPORTED PLATFORM 0.58 0.42 1
Note for Annexure-A:
*This weight factor shall be applicable only if Substructure is ready for drilling by Company.
1) Weight factors are as per I.A.
2) The weight factors shall be used to derive the item-wise cost from the lump-sum price quoted by the bidder for the purpose of calculation of Liquidated Damages and deletion of scope, if any.
Annexure B to Appendix A-3
List of structural steel to be considered / not to be considered for steel price variation are as per table below:
Structural Steel
Following structural steel items shall be considered for steel price variation: Substructure. Deck (framing including deck truss). Pile. Conductor. Jacket appurtenances (Boat landing, Barge bumper & riser protector).
Following structural steel items shall not be considered for steel price variation: Installation aid including trunions, lifting eyes, slings, shackles, sister plates, spreader bars/ frames, buoyancy tank etc. Rigging platforms Temporary members Sea fastening/ tie-down members All kinds of bumpers and guides required for fabrication and installation Nut Bolts/ fasteners Floor Platings Gratings Handrails Plates, stiffeners, ring stiffeners, gusset, doubler plates. Piping Support
BID PACKAGE FOR CONDUCTOR SUPPORTED PLATFORM PROJECT PART – III APPENDICES
I.A. LUMP SUM PRICE
Price (Indicate Currency*/Currencies*)
Sr. No. ITEM Unit rate (per MT) FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.A (i) a. Lump sum price of materials, excluding b, for execution of entire work scope as described in the bid document incl. addendum, if any (EXCLUDING Customs duty, if applicable on imported materials/equipment/items as per 3.4.1). Not Applicable X X
b. Price of steel, excluding taxes and duties, for Structural steel for total estimated weight of 3000 MT * (E) y* (currency) (E) x (y) (currency)
Sub total I.A (i) [ I.A (i)a + I.A (i)b] X X
*The unit rates of steel for structural steel - (y) and total estimated weight of structural steel (E) indicated at I.A.(i)(b) above shall be used for dynamic price mechanism of steel in terms of GCC clause no. 3.5.3 (a). The rate of GST for dynamic price of steel [GCC clause no.3.5.3(a)] shall be considered as per GST rate applicable for LSTK Contract. The list of structural steel to be considered for steel price variation is brought out below at Annexure – B to Appendix A-3.
Sr. No ITEM Unit rate (per MT) FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.A (ii) (a) Lump sum price of services, excluding I.A (ii) (b) & I.A (ii) (c), for execution of entire work scope as described in the bid document incl. addendum, if any Not Applicable X X
Subtotal I.A (ii)(a) X X
Sr. No Marine Spread Mobilization & Demobilization** (one Mobilization and corresponding Demobilization will be taken as one unit) No. of Mob & Demob during schedule completion period Unit Rate (Foreign / Indian currency) Total cost of Marine Spread Mobilization & Demobilization
Foreign Currency (ies) Indian currency
I.A (ii) (b) a. Survey Spread X X X X
b. Dive Survey Spread X X X X
c. Saturation Diving Spread (DP Vessel) for diving Works X X X X
d. Subsea structure installation by Jack-up Rig NA NA NA NA
e. Deck Installation by Jack-up Rig NA NA NA NA
f. Hook-up and accommodation Barge Spread X X X X
g. Work Boat (Min 50 POB). X X X X
h. Supply Vessel (Locally Hired) X X X X
i. Transportation Spread (Cargo Barge + Tow Tug). X X X X
Subtotal I.A (ii) (b) X X
** This is Lump sum turnkey contract. Individual mob & demob rates quoted in Table IA(ii)(b) above is part of the bid evaluation and same shall also be referred for calculating the applicable Rate for mob & demob for change orders, if any, with reference to the original scope of work.
Sr. No Marine Spread operating cost*** (Excluding Mobilization & demobilization) Estimated Number of Barge Days by the bidder Total operating cost [FOREIGN CURRENCY (IES)] Total operating cost [INDIAN CURRENCY]
I.A (ii) (c) a. Survey Spread X X X
b. Dive Survey Spread X X X
c. Saturation Diving Spread (DP Vessel) for diving Works X X X
d. Subsea structure installation by Jack-up Rig NA NA NA
e. Deck Installation by Jack-up Rig NA NA NA
f. Hook-up and accommodation Barge Spread X X X
g. Work Boat (Min 50 POB). X X X
h. Supply Vessel (Locally Hired) X X X
i. Transportation Spread (Cargo Barge + Tow Tug). X X X
Subtotal I.A (ii) (c) X X
***This is Lump sum turnkey contract. Individual marine spread rates quoted in Table 1A (ii) (c) above is part of the bid evaluation and same shall also be referred for calculating the applicable operating Day Rate for change orders, if any, with reference to the original scope of work. All marine spreads rates should be inclusive of required associated support vessels, man power, consumables, etc.
FOREIGN CURRENCY (IES) INDIAN CURRENCY
Subtotal I.A.(ii) [ I.A.(ii) (a) + I.A.(ii) (b) + I.A.(ii) (c) ] X X
FOREIGN CURRENCY (IES) INDIAN CURRENCY
Subtotal I.A. [ I.A.(i) + I.A.(ii) ] X X
I.B. CUSTOMS DUTY (Basic Customs Duty)
Price (Indicate Currency/Currencies)
Sr. No. PARTICULARS FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.B i) Customs duty on “imported materials/equipment/items” as per Clause 3.4.1.1 X X
ii) Customs duty on imported materials/equipment/items and on Constructional Plant and equipment as per 3.4.1.3 X X
iii) Customs duty on “As built Documents” as per Clause 3.4.1.4 X X
Sub Total I.B. [I.B.(i) + I.B.(ii) + I.B.(iii)] X X
I.C. GOODS AND SERVICE TAX
Price (Indicate Currency/Currencies)
Sr. No. PARTICULARS FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.C Goods & Service tax (GST) as applicable on the quoted price in I.A and I.B X X
Subtotal I.C X X
I.D. TOTAL LUMP SUM PRICE
Price (Indicate Currency/Currencies
Sr. No. PARTICULARS FOREIGN CURRENCY (IES) INDIAN CURRENCY
I.D Total Lump sum price for execution of the entire scope of work as per details in the bid document (I.A + I.B + I.C) X X
Note: i. In case of more than one foreign currency, add more columns. ii. Total lump sum price quoted by the bidder shall be inclusive of all costs inter alia, insurance, taxes and duties.
Local Content [prices for goods, works, or services including Indian Agent Commission sourced in India] For foreign bidders in Percentage (%)
Import Content (for Indian bidders) in Percentage (%)
1. Bidder to note that total lump sum price quoted at I.D is inclusive of all activities including Insurance, Survey, Design & Engineering, Procurement of Materials, Fabrication, Transportation, Offshore Installation, hook up, pre-commissioning, commissioning (where ever applicable) and dismantling / removal / transportation and handover of old dismantled scrap materials at ONGC, Nhava, all taxes & duties and all associated costs whatsoever for the entire scope of work as indicated in the bid package including Addendums if any. Bidder to refer Special conditions of contract for dismantling/removal/transportation and handover of old dismantled scrap materials at ONGC Nhava and include all corresponding costs as per scope in their total lump sum price. Bidder to also refer GST Rate notification 3/2017 under GST Act and Customs notification No. 23/2008 dated 01.03.2008, Customs notification No. 72/2017 dated 16.08.2017, Customs notification No. 50/2017 dated 30.06.2017 (including sl no 557B) and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time). Bidder to also refer notification 36/2025-Cus. dated 17.09.2025 (as amended from time to time) and other relevant notifications and its amendments till date issued under Customs Act and GST Act.
2. Bidder to note that cost of material shall include cost of all materials/equipment etc. required to be incorporated in the works including but not limited to aids for fabrication, transportation, installation, cost of mandatory spares, any special tools & tackles, lubricants, chemicals and consumables required for pre-commissioning, commissioning and start up (where applicable).
6. All the new and existing facilities under the tender are operated by ONGC and are covered under Petroleum Mining Lease.
8. In case of Consortium bid, the bidder may indicate the member wise payment schedule in the Appendix A – 10, Milestone payment Formula for their respective scope of work.
10. Bidders shall raise Invoices of each Milestones as per Milestone Payment Formula clearly showing material value and/or Services value as applicable for LSTK project.
11. The Bidders are to quote firm prices. Foreign bidders can quote the price and receive payments either in Indian Rupees or US Dollars or Euros or Pound Sterling or Yen or other relevant currencies, or a combination thereof. However, prices for goods, works, or services (including Indian Agent Commission) sourced in India must be quoted and shall be paid by ONGC only in Indian Rupees to the extent of their Local Content indicated in the bid. In all cases, Indian Agent commission shall be paid in INR only. Indian bidders are required to quote in INR only, however Indian bidders can quote and receive payment in foreign currency to the extent of their import content indicated in the bid. The freight and insurance elements must be quoted by Indian bidders in Indian Rupees only and payment will be made accordingly. The payment towards GST will be made by ONGC in Indian Rupees as per actuals, irrespective of Indian or Foreign bidder. For this purpose, the amount of GST paid as per the invoice signed by the officer duly authorized for this purpose will be taken into account. Currency once quoted will not be allowed to be changed.
12.a. Currency of quote (for Indian bidders) shall be INR only. b. Indian Bidders are required to quote the import content in percentage terms. c. To the extent of their quoted % of import content, bidders will be paid for in foreign currency(ies). d. Foreign currency payment will not exceed the quoted import content and payment will be regulated accordingly. However, total payment (including payments made in foreign currency) shall not exceed the lumpsum awarded price.
13. FOR INDIAN BIDDERS: 1 Definition of Import Content: Total value of goods, works, or services sourced from outside India 2 Indian bidders are required to quote in INR only. However, Indian bidders can quote and receive payment in foreign currency to the extent of their import content indicated above. The payment towards GST will be made by ONGC in Indian rupees as per actuals. 3 The bidder shall specify the foreign currency in which payment for the declared import content is requested. Payment against each invoice, limited to the declared import content portion, shall be made in specified foreign currency. The import content portion/percentage will be deducted from INR invoice value and paid in foreign currency. Foreign currency conversion from INR for the purpose of payment of the declared import content will be governed as follows: a. The closing currency exchange rate as applicable on the day prior to the price bid opening as per "Daily" Closing exchange rate published on Thomson Reuters internet site https://in.reuters.com/markets/currencies, upto three places of decimal, will be taken into account for conversion of INR into foreign currency. The exchange rates presently appearing on the right-hand corner of the exchange rate chart of the said internet site shall be considered as closing rate for the day. b. Where the time lag between opening of price bid and final decision exceeds three months, the currency exchange rate as above on the day prior to date of final decision will be adopted for conversion of INR into Foreign Currency.
14. FOR FOREIGN BIDDERS: Definition of local content: Total value of goods, works, or services sourced in India including Indian Agent Commission and excluding GST Advisory Note: The declared local content above should not be lower than the "Local Content confirmed under the Public Procurement (Preference to Make in India) (PPP-MII) Order, 2017, dated 19.07.2024 (as amended from time to time), issued by the Department for Promotion of Industry and Internal Trade (DPIIT), Government of India, under Order No. P-45021/2/2017-PP(BE-II)-Part(4) Vol.II Foreign bidders can quote the price and receive payments either in Indian Rupees or US Dollars or Euros or Pound Sterling or Yen or other relevant currencies, or a combination thereof. However, prices for goods, works, or services (including Indian Agent Commission) sourced in India must be quoted and shall be paid by ONGC only in Indian Rupees to the extent of their Local Content indicated in the bid. In all cases, Indian Agent commission shall be paid in INR only. Payments toward each invoice, corresponding to the local content specified in the bid, shall be made in INR. The local content portion /percentage will be deducted from forex invoice value (as per contractual rates) and paid in INR. Conversion from the quoted foreign currency to INR shall be carried out based on the following: a. The closing currency exchange rate as applicable on the day prior to the price bid opening as per "Daily" Closing exchange rate published on Thomson Reuters internet site https://in.reuters.com/markets/currencies, upto three places of decimal, will be taken into account for conversion of foreign currency into Indian Rupees. The exchange rates presently appearing on the right-hand corner of the exchange rate chart of the said internet site shall be considered as closing rate for the day. b. Where the time lag between opening of price bid and final decision exceeds three months, the currency exchange rate as above on the day prior to date of final decision will be adopted for conversion of foreign currency into Indian Rupees.
15. Bidders cost of material at I.A. (i) shall be the CIF cost (in case of import) / Ex-works cost (In case of domestic supplies).
16. If sucessful bidder is selected as per PPP-MII then, the bidder shall ensure that the percentage of local content declared in Appendix A-3 in accordance with relevant Para of ITB and the Public Procurement (Preference to Make in India) Order is actually achieved during execution of the Contract and shall submit Local Content Certification, duly certified by a Cost Accountant or Chartered Accountant in practice, during execution of the project but not later than submission of the Final Bill or before achieving ninety percent (90%) of financial progress, whichever is earlier. Failing submission of such certification within the stipulated time, ONGC shall withhold ten percent (10%) of the Contract Value, and payment of the last ten percent (10%) of the Contract Value shall be made only after receipt and acceptance of the aforesaid Local Content Certification, confirming compliance with the local content category declared at the time of tendering. Further, in the event the Contractor fails to meet the declared local content requirement resulting in change of supplier category from Class-I to Class-II/Non-Local or from Class-II to Non-Local, ONGC shall levy a penalty of ten percent (10%) of the Contract Value.
17. Prices to be quoted in I.A (i), I.A (ii) and its' sub-components are exclusive of GST. Applicable GST on the quoted price in I.A and I.B to be quoted separately in I.C’
18. Foreign currency payment will not exceed the quoted import content and payment will be regulated accordingly. However, total payment (including payments made in foreign currency) shall not exceed the lumpsum awarded price
19. Note on Invoicing Instructions: Indian Contractor: The Contractor shall raise separate invoices for the foreign currency component (attributable to and limited to the extent of quoted import content) and INR components of the Contract Price. Foreign Contractor: The Contractor shall raise separate invoices for the foreign currency component and INR component [attributable to the quoted Local Content {including but not limited to Goods, Works and / or Services (including Indian Agent’s Commission, wherever applicable) sourced / provided from within India} to be quoted, invoiced and paid for in INR only and not in foreign currency]. Common to Indian and Foreign Contractors: Under no circumstances shall foreign currency and INR amounts be commingled or included in the same invoice. The foreign currency invoice shall be processed for payment in accordance with the provisions of the Contract and shall further be subject to applicable RBI regulations, foreign exchange regulations, and other prevailing statutory requirements.”
20. The bidder shall be deemed to have visited and examined the site, fully acquainted themselves with the existing site conditions, including sub soil strata (if applicable), nature of work, and all factors affecting the execution of work before submission of the price bid.
II- UNIT ADJUSTMENT RATES
II. A For Pipelines - Deleted
II. B For Structural Steel - Deleted
II.C Details of fuel:
1. The total cost of diesel fuel required in the project shall be included by bidder in lump sum price I.D.
2. The total estimated quantity of diesel fuel for which Price adjustment shall be computed as per methodology indicated at GCC clause no. 3.5.3(b) is 500 KL.
III Details of Marine spread:
Marine spread loading for bid evaluation will not be done separately.
IV. COST REIMBURSABLE ADDITIONAL ITEMS (Cost plus %):
(COST PLUS PERCENTAGE)
1. Percentage fee applicable to cost of material used for extra work items. 0.075
2. Percentage fee applicable to equipment subcontracts for extra work. 0.075
3. Percentage fee applicable to labour subcontracts for extra work. 0.075
4. Percentage fee applicable to one year’s spares 0.075
Notes for item IV:
1. In respect of item 1) and 4) above, the percentage shall be applicable on CIF price (Offshore supply base/Contractors yard) for imported items/ FOR Destination price (Offshore supply base/contractors yard) for indigenous items. However, the same shall not be applicable on duties & taxes.
2. The above percentage will also be used by the Company to order bought-out items and extra equipment not included in the Bidding documents.
3. In respect of item 4) above, the cost shall be reimbursed as per provision of clause 5.16 of General Conditions of Contract.
V. CUSTOMS DUTY
Bidder shall furnish break-up of the amount included in the Total lump sum price towards meeting his obligation as per clause 3.4.1.3 of General Conditions of Contract pertaining to Customs Duty.
ITEM (1) Laws/Acts/Rules/regulations reference (2) Tariff indicating rate of tax/duty/fee/charge/levy (3) Amount indicating currency/ currencies (4)
a) Marine Spread x x x
i. Survey Spread x x x
ii. Dive Survey Spread x x x
iii. Saturation Diving Spread (DP Vessel) for diving Works x x x
iv. Subsea structure installation by Jack-up Rig x x x
v. Deck Installation by Jack-up Rig x x x
vi. Hook-up and accommodation Barge Spread x x x
vii. Work Boat (Min 50 POB). x x x
viii. Supply Vessel (Locally Hired) x x x
ix. Transportation Spread (Cargo Barge + Tow Tug). x x x
b) Bidder’s Constructional Plant (other than “a” above), Tools & tackles, consumables etc. likely to be imported into India with the undertaking to re-export (less quantities actually consumed in execution of Works) x x x
Notes for item V :
1. The break-up furnished above shall form the basis for adjustment only to the extent covered under clauses 7.6 (Change in Law) of General Conditions of Contract so far as it pertains to Customs Duty.
2. Bidder agrees that in case the Custom Duty actually levied/imposed on Bidder’s material consumables after deducting the admissible duty drawback/exemption is less that the amount(s) indicated above, then Company shall recover the difference between the net Custom Duty levied/Imposed, after taking into account the admissible duty drawback and the amount(s) indicated by the Bidder. Bidder to refer Customs notification no. 50/2017 (including Sl no 557B) dated 30.06.2017 and 72/2017 dated 16.08.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022, 23/2008-Cus. Dated 01.03.2008 and 36/2025-Cus. dated 17.09.2025 (As amended from time to time) of Govt. of India and all other amendments in the Act. Company shall reimburse custom duty on account of change in law against documentary evidence as per provisions of the contract in clause 3.4 subject to clause 7.6 of GCC. Bidder to also refer ITB clause 10.11 in this regard. Company shall bear the additional custom duty only if it becomes payable in terms of provisions of clause 7.6 of General Conditions of Contract.
3. Bidder shall indicate the details of Customs Law reference and Tariff indicating the duties of customs and rate under column (2) and (3) respectively in the un-priced bid also.
4. The total amount quoted above shall tally with total amount of custom duty quoted in lump sum price I-B (ii)- Customs duty for these items.
5. Change in law shall be applicable only in case of variation of rate of taxes and duties on supply of services to ONGC and not applicable on taxes and duties on input (Goods and Services), in line with clause 7.6.6 of GCC.
6. Change in law shall not be applicable to taxes and duties in respect of subcontractors, vendors etc. of contractors.
VI. CHANGE IN LAWS AND REGULATIONS (Refer clause 3.4 of GCC of tender Documents)
Laws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the Bidder while estimating the incidence of taxes, duties, fees, charges, levies etc. included in the Bidder’s lump sum prices for the Works (as quoted in the Appendix A-3 I.B. (i) & (iii ) and I.C) as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment of Contract Price in the event of change of Law in terms of Clause 7.6 of General Conditions of Contract are as under:
ITEM Bidding Documents Clause Reference Customs laws reference Tariff indicating rate of customs duty (CD) Amount included in the Total Lump sum Price at I.D
Customs duty on “imported materials/ equipment/items” 3.4.1.1 x x x
Customs duty (CD)-on As Built Documents 3.4.1.4 x x x
ITEM Bidding Documents Clause Reference GST Laws reference HSN / SAC Code Tariff indicating rate of GST Amount included in the Total Lump sum Price at I.D
Goods and Service tax 3.4 x x x x
Note for item VI: Refer general note 1
1) Bidder to also refer Customs notification No. 50/2017 (including Sl no 557B) dated 30.06.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time) and GST Rate notification 3/2017 under GST Act. Bidder to also refer notification 36/2025-Cus. dated 17.09.2025 (as amended from time to time) and any another relevant notifications & its amendments till date issued under Customs Act and GST Act.
2) Bidders to go through Clause 7.6 of General Conditions of Contract carefully, while furnishing the above table. If `Not applicable’ write `Not Applicable’.
3) The GST shown above shall tally with the same quoted in Lump sum price – I.C.-Goods and Service Tax.
4) The Customs duty shown above shall tally with total amount of custom duty quoted in lump sum price at I-B (i) & (iii).
5) Bidder shall indicate the details of GST reference and Tariff indicating rate of GST under column 3 and 4 respectively in the un-priced bid also.
6) Change in law shall not be applicable to taxes and duties in respect of subcontractors, vendors etc. of contractors.
7) Change in law shall be applicable only in case of variation of rate of taxes and duties on supply of services to ONGC and not applicable on taxes and duties on input (Goods and Services), in line with clause 7.6.6 of GCC.
VII. Disclosure for availing Deemed Export Benefit for domestic materials and Concessional Customs duty for import of materials:
Bidder shall disclosed the following:-
Sl. No. ITEM Amount (Currencies to be mentioned by the Bidder)
1 Value of domestic materials for which the bidder intend to avail Deemed Export Benefit / GST at concessional rates. X
2 CIF Value of Imported materials for which the bidder intend to avail Concessional rate of Customs Duty / GST. X
1) The total value of domestic materials and imported materials at above table shall be restricted to the quoted price as per I.A.
2) Bidder is allowed to change the indicated amount shown above during the execution based on detailed engineering but the sum of value of goods/ materials on which concessional Customs duties and GST is leviable shall be restricted to the sum of amount indicated price at table I.A.
3) For items under clause 3.4 of Part - II GCC, Certificate and/or Undertaking shall be issued by Company for items covered under list 33 of Notification 50/2017-Cus (including Sl no 557B) as amended by Notification 02/2022-Cus.
4) For items under clause 3.6 of Part - II GCC, PAC as per Deemed Export Policy and recommendatory letter for obtaining EC from DGH shall be issued by Company.
5) Bidder shall refer Customs notification No. 50/2017 (including Sl no 557B) dated 30.06.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time) and GST Rate notification 3/2017 under GST Act. Bidder to also refer notification 36/2025-Cus. dated 17.09.2025 (as amended from time to time) and any another relevant notifications & its amendments till date issued under Customs Act and GST Act.
VIII. Rental Rate Schedule:
(Company has furnished Rate Sheet and Fee Schedules in accordance with Clause 11.2 (d) of Part I “Instructions to Bidders” and Clause 8.1 of Part II “General Conditions of Contract).
Rental Rate Schedule shall be as per day basis, if required, same shall be calculated on pro rata basis. Rental rate schedule is attached at Annexure 1, 2 and 3 as under.
Rental Rate Schedule
S No Equipment Day Rate (INR)
1 Air Compressors: 14191
2 Generator Sets:
3 Nitrogen Generator 14315
4 Hydraulic Jack 5OT & Pump 10581
Hydraulic Jack 25T & Pump 8092
5 Welding Machines:
Diesel upto 400A 5601
Electric 300-600 A 1493
6 Cutting and Burning Outfits:
Multihead Plate Cutting Torch 1743
7 Miscellaneous :
Punch machine 1245
Pipe cut off. Machine 1805
UT machine 5228
Fitter tool box 934
Welder tool box 1245
B) TOOLS AND MISCELLANEOUS :
High Pressure 10892
Centrifugal 13693
Scaffolding Pipe 33
Scaffolding wooden plank 43
Scaffolding Clamp 18
11 Sand blasting & Painting With Air Compressor (excluding sand and/or paint) 15810
Chain Block 10T 374
Chain Block 20T 1058
The rates are inclusive of Percentage fee.
S No Description Rates( per day) in INR
1 Worker/Technician/welder/operator etc. 1820
2 Supervisor 6209
The rates are inclusive of Percentage fee.
S No Engineering Price in INR
1 Drawings 86076
3 Local Analysis of Deck 232962
4 Calculations 106739
5 Purchase Specifications 421388
6 Report 119693
7 Data Sheet 93784
8 Loop Diagram 46892
9 Control Architecture 179539
10 Site survey a) Engineers per day – 12954
b) Draftsman per day – 10492
c) Senior Engineer per day – 15738
The rates are inclusive of Percentage fee. However, all above rates are exclusive of GST. For Annexure-3, please note that site survey rates are on per day basis whereas for others it is based on number of engineering deliverables.
Annexure - A to Appendix A-3
Basis for Facility-wise breakup of lump-sum Cost Weight factors:
S No Facility Substructure including Load bearing conductors Weight Factor* Topside Weight factor
1 CONDUCTOR SUPPORTED PLATFORM 0.58 0.42 1
Note for Annexure-A:
*This weight factor shall be applicable only if Substructure is ready for drilling by Company.
1) Weight factors are as per I.A.
2) The weight factors shall be used to derive the item-wise cost from the lump-sum price quoted by the bidder for the purpose of calculation of Liquidated Damages and deletion of scope, if any.
Annexure B to Appendix A-3
List of structural steel to be considered / not to be considered for steel price variation are as per table below:
Structural Steel
Following structural steel items shall be considered for steel price variation: Substructure. Deck (framing including deck truss). Pile. Conductor. Jacket appurtenances (Boat landing, Barge bumper & riser protector).
Following structural steel items shall not be considered for steel price variation: Installation aid including trunions, lifting eyes, slings, shackles, sister plates, spreader bars/ frames, buoyancy tank etc. Rigging platforms Temporary members Sea fastening/ tie-down members All kinds of bumpers and guides required for fabrication and installation Nut Bolts/ fasteners Floor Platings Gratings Handrails Plates, stiffeners, ring stiffeners, gusset, doubler plates. Piping Support
BID EVALUATION MATRIX (TECHNICAL BID MATRIX)
Name of Work: Conductor Supported Platform Project
Tender No.: ZW1PC26008
1. All bidders shall fill this Bid Matrix completely and submit it as a separate file named “Bid Matrix” with the techno-commercial bid, confirming compliance against each BEC requirement.
2. Bidder shall submit supporting documents and invariably indicate their exact location (page number, annexure, appendix, document name, etc.) in the Cross Reference column.
3. Bidder shall enter “Confirmed”, “Not Confirmed”, or “Not Applicable”, as appropriate, in the Bidder’s Response column. Conditional confirmation is not acceptable unless specifically permitted in the bidding documents.
4. Only the light-blue cells in the Bidder’s Response and Cross Reference columns are to be filled by the bidder.
BEC Ref. No. Technical BEC Requirement Bidder’s Response Cross Reference / Document Location
1.0 Only the bidders who quote for the complete Scope of Work including optional items (if any) as described in the Bidding Documents, addendum (if any) and any subsequent information given to the bidder shall be considered.
2.0 Bidder shall offer only 4-legged Conductor Supported Offshore Well Head Platform (CSP). The entire facility, including the substructure and topside shall be designed for installation by Jack-up Drilling Rig (Free issued by Company). Bidder, in its techno- commercial (unpriced) bid, is required to confirm that their design is based on the design parameters provided in the bidding Documents. Note: 1) A Conductor Supported Wellhead Platform (CSP) is an offshore structure relatively lighter than conventional structure that uses well conductors for both as permanent foundation of the structure, drilling and as a support for the topside decks. 2) Conductors are the outermost casings (steel pipes) installed into the seabed to provide a stable foundation for the well. They isolate shallow water and soil layers, protect against washouts or shallow gas hazards, establish a circulation path for drilling fluids, and provide structural support for subsequent casing strings and wellhead equipment. 3) A Jack-up Drilling Rig is a mobile, self-elevating offshore structure with a buoyant hull and large, retractable legs that can be lowered to the seabed to lift the entire structure above the water, creating a stable, fixed base primarily used for drilling for oil and gas.
3.0 Health, Safety and Environment: Bidder must confirm compliance to all HSE criteria specified in bidding documents in general and to clauses 10.0 to 10.11 of Part-II of Volume-I of bidding documents in particular.
5.0 Experience/ capability of the bidder: Experience / capability of the bidder shall be as under-
5.0(a) The Bidder shall submit the documentary evidence in support of his experience and capability, as required, along with Techno-Contractual unpriced bid as per Appendix A-9.
5.0(b) Single bidder: Single bidder shall meet the experience criteria himself.
5.0(c) Incorporated Joint Venture Company In case the bidder is an Incorporated Indian Joint Venture Company, registered in India and incorporated under the Companies Act and any amendments thereunder, then the technical experience criteria laid down in the Technical BEC should be met as under: (i) The Joint Venture Company by itself should meet the experience criteria OR (ii) Any Partner in the Joint Venture Company having a stake of at least 26% in the Joint Venture Company should meet the technical experience criteria stipulated in the tender on its own and cannot rely on any other arrangement such as Consortium or Supporting Company of the JV Partner for meeting the technical experience criteria. Documentary evidence in support of the above should be submitted along with the techno-commercial bid. (iii) In case of (ii) above, an undertaking from the Joint Venture Partner, based on whose experience the JV seek qualification, shall be submitted with the techno commercial bid stating they shall maintain minimum 26% shareholding in the JV till the execution of the contract.
5.0(d) Consortium Bids (i) In case of Consortium bids, leader and members of consortium should themselves meet the experience criteria covering the respective activities of work to be performed by them on their own and not through any other arrangement like through Supporting Company, Parent/ Subsidiary/ Sister Subsidiary/ Co-Subsidiary/ Technical Collaboration/ Sub-contracting. Necessary documentary evidence to this effect should be submitted with techno-commercial bid. The members of Consortium shall decide the Leader of Consortium. The Leader of Consortium shall have minimum 51% stake in terms of bid value, as reflected in the MOU executed by the Consortium members. Each member of Consortium shall remain jointly and severally liable to ONGC. For this purpose the role and scope of work to be performed by the respective Consortium members expressed as a percentage of bid value should be indicated in the Memorandum of Understanding (MOU) submitted along with techno-commercial bid as per format provided in the tender. (ii) Notwithstanding the provisions that the members of Consortium shall be jointly and severally liable to ONGC, the Leader of Consortium should undertake unconditional acceptance of primary responsibility of executing the entire ‘Scope of work’ of this tender. The confirmation should be submitted along with the techno-commercial bid. (iii) A constituent of the Consortium shall not be permitted to participate either in an individual capacity as a bidder or as a member of another Consortium in the same tender. (iv) Only that Consortium member who has undertaken a particular activity in execution of a contract shall be considered as having technical experience of that particular activity. (v) The overall responsibility of Project Management of entire project shall be that of the Leader of the Consortium. Subsequent to completion of above project, Consortium leader shall be considered as having experience of all the activities by himself and he shall be qualified in future tenders of Western Offshore as having the experience of executing such Engineering, Procurement, Construction & Installation (EPCI) projects.
Common Note for sub-clauses (a) to (d) a) Successful bidder/ Contractor/ Leader of Consortium shall be required to perform by themselves (and not through other arrangement like through Supporting Company, Parent/ Subsidiary/ Sister Subsidiary/ Co-Subsidiary/ Technical Collaboration/ Sub-contracting) Project Management and at least one of main activities based on which they are seeking their qualification. b) In case of Consortium bids, all Consortium partner(s), other than the Leader of Consortium, shall also be required to perform by themselves (and not through arrangement like through Supporting Company, Parent/ Subsidiary/ Sister Subsidiary/ Co-Subsidiary/ Technical Collaboration/ Sub-contracting) one of the project activities (other than the activity(ies) indicated by the Leader of Consortium to be performed by Leader) Accordingly, Bidder shall submit the “Proforma for Work Experience” (Appendix B-5) and proposed “Division of Project Activities and Location of Work Centre” (Appendix B-6) of Volume –I along with the bid. In case the bidder is proposing sub-contracting for any activity, sub-contractors’ name shall be intimated in Proforma “Division of Project Activities and Location of Work Centre” (Appendix B-6) of Volume –I.
5.1 The Bidder must possess, prior to the deadline of submission of bids, experience of having executed as EPCI contractor at least (A) One (1) new Conductor Supported Offshore Well Head Platform (Oil or Gas or combination of oil, gas & water, 4-legged, all 4-legs designed as conductors). The Conductor Supported Well Head Platform should have been installed by Jack-up Drilling rig. (Bidder shall give a certificate issued from Operator/MWS/End user clearly stating that all 4-legs were designed as conductors & it was installed by Jack-up Drilling Rig. In the absence of certificate issued from Operator/MWS/End user, the bidder shall submit suitable engineering document to establish the same along with an undertaking from the bidder stating that all 4-legs were designed as conductors & it was installed by Jack-up Drilling Rig). Bidder to indicate the following: i) name of the operator of the CSP, ii) owner/operator and name of Jack up Drilling Rig, iii) any other details etc. for the above-mentioned project to establish the credential) OR (B) One (1) new 4-Legged (minimum) Offshore Oil or Gas or Water Injection Process Platform OR Living Quarter Platform OR Well Head Plat form. Note-1 (a) for 5.1(B): EPCI Project of above facilities must necessarily consist of 4-legged fixed offshore structure along with Jacket and Piles. Note-1 (b) : The experience for 5.1(A) & (B) above needs to be on EPCI basis by bidder. However In case bidder is seeking qualification based on 5.1(B) above, they should necessarily form consortium with consortium partner having experience of 5.1(A) above. Note 2: i) The project(s) should have been completed during the last fifteen years. ii) The bidder must have successfully accomplished all activities for the EPCI project listed above, including Project Management, Detail Engineering, Procurement, Fabrication, Transportation, Installation, Hook-Up, Testing and Pre-commissioning. Note 3: No part completion certificate shall be considered to meet above criteria; unless it can be clearly established based on the submitted documents that bidder has already successfully completed part facility Scope of Work of Similar Complexity in a broader scope project on EPCI basis as envisaged in this main BEC clause and Note-1 above and handed over to the contractee for use. For evaluation purpose; such EPCI jobs accompanied by Part Completion Certificate will be considered as completed. Note 4: For meeting the requirement above, the period reckoned shall be the period prior to the originally scheduled date of opening of the techno-commercial bid.
5.2 The Bidder (Either a single entity which includes Incorporated Indian Joint Venture OR a Consortium comprising of two or more partners being jointly and severally liable to the Company) must himself have the relevant experience in Project Management for completed offshore project(s) (based on which bidder is seeking experience in clause 5.1 above) and for at least one of the following main activities: a) Fabrication of Substructure or Deck of Conductor Supported Offshore Well Head Platform (4-legged, all 4-legs designed as conductors). b) Installation of Substructure or Deck of Conductor Supported Offshore Well Head Platform (4-legged, all 4-legs designed as conductors). c) Fabrication of 4-legged (minimum) Jacket or Deck of Oil or Gas Process Platform or Water Injection Platform or Living Quarter Platform or Well Head Platform. d) Installation of 4-legged(minimum) Jacket or Deck of Oil or Gas Process Platform or Water Injection Platform or Living Quarter Platform or Well Head Platform. In case of Consortium bid, other Consortium partner(s) should also have the experience of performing at least one distinct project activity as indicated in 5.1(Note-2(ii)), other than Project Management (which shall be done by the Leader) based on his own experience. However, Leader of Consortium bidder should have experience of Project Management and at least one activity as listed at either (a) or (b) or (c) or (d) above.
5.3 The overall responsibility of project management of entire project shall be that of Successful bidder/ Contractor/ Leader of Consortium (in case of Consortium). Successful bidder/ Contractor/ Leader of Consortium (in case of Consortium) shall also be required to perform by themselves (and not through other arrangement like through supporting company, Parent/ Subsidiary/ Sister Subsidiary/ Co-subsidiary/ Technical collaboration/ Sub-contracting), Project Management and at least one of following main activities based on which they are seeking their qualification in Clause No. 5.2. a) Fabrication of Substructure or Deck of Conductor Supported Offshore Well Head Platform. b) Installation of Substructure or Deck of Conductor Supported Offshore Well Head Platform. In case of contractor being a Consortium, all Consortium partner(s), other than the Leader of Consortium, shall also be required to perform by themselves (and not through other arrangement like through supporting company, Parent/ Subsidiary/ Sister Subsidiary/ Co-subsidiary/ Technical Collaboration/ Sub-contracting) one of the project activities based on which they are seeking their qualification under clause 5.2 above [other than the activity(ies) indicated by the Leader of Consortium to be performed by Leader]. Note: This clause shall be evaluated to assess the bidder’s commitment and responsibility to be taken by him in the instant project on the basis of experience qualified in Clause 5.2 above, that is Project Management and at least one of the activity(ies) as mentioned in clause 5.3(a) and (b) and intimated in “Division of Project Activities and Location of Work Centre” (Appendix B-6).
5.4 Save as provided in sub-para 5.3 above, for the purpose of assessment of experience and capability of executing the Work, the experience and capability of the executing agencies i.e., main bidder, Consortium partners, in executing the aforesaid activities listed in sub-para 5.1 above and indicated in Appendix B-5 and Appendix B6 for the respective Scope of Work, shall be evaluated. In case of sub-contracting, the bidder shall submit commitment letters on the letterhead of sub-contractors/ agencies proposed in Appendix B-6.
5.7 Verification and certification of documents pertaining to Technical Bid Evaluation Criteria (BEC) All documents (excluding ONGC issued documents related to bidder’s experience and Bidders self-undertakings) in support of Technical Criteria of Bid Evaluation Criteria (BEC) furnished by the bidders should be verified and certified by any one of the independent third-party inspection agency listed at Appendix-TPIA-1. a) TPIA shall verify the authenticity, and completeness of the documents pertaining to the bidder’s past experience, job execution records, and other relevant documents submitted in support of the Technical BEC. b) The verification must be marked “Verified from Original” and “the authenticity of the original were established” and include the name and contact details of the certifying officer and the branch of the TPIA conducting the verification. c) The TPIA must issue a certificate in the format prescribed in Appendix TPIA-2. This certificate must be submitted by the bidder along with their techno-commercial bid. d) All costs for third-party verification and certification are to be borne by the bidder. ONGC assumes no liability—financial or otherwise—for disputes between the bidder and the TPIA. e) The certifying TPIA must be accredited under “NABCB Type A” in accordance with ISO/IEC 17020 and listed on the QCI-NABCB website. The accreditation must be valid as on the date of verification. Note: Agencies as per TPIA-1 should have valid ONGC empanelment accreditation on the day of certification.
6.0 Pile and conductor remedial works: Compliance with design criteria specified in bidding documents and clause 5.6 of part II of volume I of bidding documents
7.0 Unconditional acceptance of Conditions for Procurement / Selection of Makes and Vendors as per Clause No. 5.2.3 of Part II of Volume I of Bidding Documents
8.0 Any additional soil testing or re-examination of soil data provided in the Bidding Document required by the bidders and additions / alterations / interpretations on account of any such matter shall be to the cost and time of the bidder.
9.0 Saturation Diving: Bidder must agree to provide saturation diving and other special diving equipment on the marine spread as per bidding documents requirement during the period of installation in the lump sum prices.
10.0 Pre-engineering / pre-construction / post-installation survey: Bidder must agree to undertake pre-engineering, pre-construction and post-installation surveys and/or to comply with the provisions of Clause 5.4 of Part-II of Volume I of Bidding Documents
11.0 Acceptance of Constructional Plant and Equipment as per Clauses 5.11 of Part-II of Volume I of Bidding Documents.
12.0 a) Bidder must furnish the following undertakings from the original Equipment Manufacturer (s), along with his bid: (i) The OEM shall provide the maintenance / service / calibration facilities in India, for all the equipment to be supplied under the contract, if awarded to him by ONGC. (ii) The bidder shall indicate the source of their bought-out items and also the names of the original equipment/materials manufacturer for the major components. The OEM shall guarantee the 'lifetime supply' (i.e. 7 years in case of electronic equipment/items and 10 years in case of mechanical equipment/items) of spares for all the equipment to be supplied under the contract, if awarded to him by ONGC. (iii) The OEM undertakes to enter into Annual Maintenance Contract for 'lifetime' (i.e. 7 years in case of electronic equipment/items and 10 years in case of mechanical equipment/items) for all the equipment to be supplied under the contract, if awarded to him by ONGC. In case the OEM declines / fails to honour any of his above commitments, business dealings with such OEM shall be considered for banning from future business dealings. b) In case of any difficulty in submitting above commitments from any OEMs at the bidding stage, the bidder shall submit his own undertaking to the effect that the undertaking required in sub Para (a) above from those OEM(s) will be furnished at the detailed engineering stage. However, in case successful bidder fails to submit the same at the detailed engineering stage, ONGC reserves the rights to cancel the contract, forfeit the Performance Security and take suitable action for banning such bidders from future business dealings with ONGC as deemed fit.
13.0 An undertaking shall be submitted by the bidder along with the bid that they have carefully gone through the guidelines/notifications issued by Govt. of India which are also available at Deity’s official website i.e. URL www.meity.gov.in/ www.makeinindia.com for providing preference to Domestically Manufactured Electronics products (DMEP) in Government procurement and in case contract is awarded to them, until & unless there are compelling technical reasons for not doing so, which shall also be specified by them in their bid, they will give preference to specified domestically manufactured electronic items for execution of the contract. Further, the contractor shall provide complete details i.e. name of Domestic Manufacturer, value of DMEP utilized for execution of EPCI contract, to ONGC.
16.0 The sub-contractor are required to have relevant experience on its own and not through any other arrangement like through Supporting Company, Parent/ Subsidiary/ Sister Subsidiary/ Co-subsidiary/Technical Collaboration / Sub-contracting. The Bidder shall submit undertaking in this regard.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Annexure-87 (i) Volume IV Part 1_PL Routes & Clearance for Drilling Rig_N 25.pdf
Tender Documents • 0.95 MB
Annexure-87 (ii) Volume IV Part 2_Soil Investigation Report_N 25_Part 1.pdf
Tender Documents • 12.65 MB
Annexure-87 (iii) Volume IV Part 2_Soil Investigation Report_N 25_Part 2.pdf
Tender Documents • 23.48 MB
Annexure-87 (iv) Volume IV Part 3_Shallow Seismic & Seabed Survey Report_N 25.pdf
Tender Documents • 2.20 MB
Annexure-87 (v) Volume IV Part 4_Indicative SLD_N 25.pdf
Tender Documents • 0.23 MB
Annexure-87 (vi) Volume IV Part 5_Well Fluid Properties Oil + Gas Wells and Free Gas Wells_N 25.pdf
Tender Documents • 0.20 MB
Annexure-86 (i) Volume III Part A1_Functional Specifications_Piping Structure Mech.pdf
Tender Documents • 13.51 MB
Annexure-86 (ii) Volume III Part A2_Functional Specifications_Inst Elec Welding Pipeline.pdf
Tender Documents • 25.35 MB
Annexure-86 (iii) Volume III Part B_IRT.pdf
Tender Documents • 2.58 MB
Vol_I_Appendix A-11 Offshore SVL Revision 12.4.pdf
Tender Documents • 1.20 MB
Vol_I_Appendix A-16 Rev 10.8 List of Agencies.pdf
Tender Documents • 0.44 MB
Vol_I_Appendix A-17.pdf
Tender Documents • 0.12 MB
Vol_I_Appendix A10.xlsx
Tender Documents • 0.06 MB
Vol_I_Appendix A3.xls
Tender Documents • 0.13 MB
Vol_I_Appendix C-10.pdf
Tender Documents • 1.33 MB
Vol_I_Appendix C-8 DCI MCI.pdf
Tender Documents • 1.18 MB
Vol_I_Appendix C-9.pdf
Tender Documents • 0.64 MB
Vol_I_Bidder Response Sheet.xls
Tender Documents • 0.13 MB
Vol_I_IP.pdf
Tender Documents • 0.23 MB
Vol_I_Technical BEC with appendices.pdf
Tender Documents • 0.59 MB
Vol_I_Technical_SCC.pdf
Tender Documents • 0.48 MB
Vol_I_Vol I_ Part III Appendices.docx
Tender Documents • 0.28 MB
Vol_I_Vol I_PartIV_BEC_CSPP.docx
Tender Documents • 0.08 MB
Vol_I_Vol-I I ITB.docx
Tender Documents • 0.19 MB
Vol_I_Vol-I-II GCC_CSPP.docx
Tender Documents • 0.31 MB
Vol_I_Vol_I_PartIV_Technical_Bid_Matrix.xlsx
Tender Documents • 0.02 MB
Annexure-82 Volume II_Section 2_Description of work (Basic Bid Work)- R0.pdf
Tender Documents • 1.17 MB
Annexure-83 Volume II_Section 3_Design Criteria.pdf
Tender Documents • 7.10 MB
Annexure-84 Volume II_Section 4_Pipeline Contents.pdf
Tender Documents • 0.15 MB
Annexure-85 Volume II_Section 5_Pre-Commissioning, Commissioning Procedure & Performance Tests.pdf
Tender Documents • 0.54 MB
Annexure-81 Volume II_Section 1_Background & General-R0.pdf
Tender Documents • 0.32 MB
Corr1.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .