Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
22 Dec 2023, 3:00 pmClosed
EE(SDW)VI
WSTP Keshopur New Delhi
Replacement of sluice valves AND Foot Valves in Booster Pumping Station at Staff Quarters Keshopur
2023_DJB_251149_2
NIT NO. 05 (2023-2024) EE(SDW)VI
Open Tender
Miscellaneous Works
Works
30 days
WSTP Keshopur New Delhi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
AS PER NIT
₹2,200
Yes
10 Jan 2024
15 Dec 2023
22 Dec 2023
15 Dec 2023
22 Dec 2023
15 Dec 2023
Replacement of sluice valves & foot valves in Booster Pumping Station at Staff Quarters Keshopur :-Arrangement of all required safety equipments (i.e safety belts, folding ladders, safety helmets, safety shoes, face mask, safety goggles, oxygen kit etc.) for safety of man power during execution of work.
Dismantling of existing sluice valves, Foot Valves after cutting/removing of old rusted nut bolts of all flanges with gas cutter and manual labour.
Taking out of the existing pipeline of the pump sets one by one from the UGR with the help of Tripod, chain Pulley block and manual labour.
Dismantling of existing Foot Valves after cutting/removing of old rusted nut bolts of all flanges with gas cutter and manual labour.
S/o Sluice valves, MoC-CI, Non-Rising 100 mm dia, PN-1.0. Make: KBL/IVC/Any DJB Approved Make
S/o Foot valve, 100 mm dia. MoC-CI, Make: KBL/IVC/Any DJB Approved Make
Fixing of newly supplied 100 mm sluice valves on existing pipeline one by one with the help of manual labour by using new nut bolts and rubber packing, proper tightening of nut bolts to avoid any leakage.
Fixing of newly supplied 100 mm Foot Valves on existing pipeline one by one with the help of manual labour by using new nut bolts and rubber packing, proper tightening of nut bolts to avoid any leakage.
Lowering the Pipeline in the UGR with the help of Tripod, chain pulley block and manual labour after fixing of new foot valves.
Painting of the entire system after removing the rust from the structure with the wire brush. Painting the surface with the one coat of red oxide primer and two coat of anti-corrosive paint of appropriate color as per directions of Engineer-in-charge.
Testing & commissioning of the entire system on no pressure and full pressure of the line.
Transportation & cartage charges of men & material.
JAI DURGA ENGINEERS AND CONTRACORS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .