Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.0 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | Not Admitted-Fee 91 IST FLOOR KIRAN VIHAR DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | - | Not Admitted-Fee EMD Exemption Certificate not received | |
| 3 | Not Admitted-Fee | - | Not Admitted-Fee EMD Exemption Certificate not received | |
| 4 | Rejected-Technical 43 JAYANTIPUR DHOOMANGANJ PRAYAGRAJ 211011 | PRAYAGRAJ | UTTAR PRADESH | 211011 | - | Rejected-Technical Do not meet the NIT criteria |
Tender Value
₹24.4 L
EMD Value
₹48,881
Closing Date
18 Jun 2019, 6:00 pmClosed
Sr. Manager (E-E)
Senior Manager (Engg.-Elect.) CATC Prayagraj-211012
Operation and Annual Comprehensive Maintenance of Grid connected 300 KW capacity Solar PV power plant for 3 Years.
2019_AAI_26537_2
AAI/CATC/SM(E-E)/NIT/02
Open Tender
Electrical Works
Item Rate
1095 days
CATC Prayagraj
Please refer Tender documents.
13 documents required · 13 mandatory
₹1,120
Yes
AAI Allahabad
₹48,881
Yes
9 Nov 2020
12 Jun 2019
24 Jun 2019
12 Jun 2019
18 Jun 2019
12 Jun 2019
12 Jun 2019 - 14 Jun 2019
Amount
Comprehensive Maintenance & Operation (CMC) of 300KWp Grid Connected SPV Power Plants installed at CATC Prayagraj .Note: Staff required to be arranged by the agency for the operation of 300KW solar power plant shall be as per scope of work, i.e., One Engineer cum administrative in charge for all days excluding Sunday & National Holidays.CMC for 1st Year.
Comprehensive Maintenance & Operation (CMC) of 300KWp Grid Connected SPV Power Plants installed at CATC Prayagraj .Note: Staff required to be arranged by the agency for the operation of 300KW solar power plant shall be as per scope of work, i.e., One Engineer cum administrative in charge for all days excluding Sunday & National Holidays.CMC for 2nd Year.
Comprehensive Maintenance & Operation (CMC) of 300KWp Grid Connected SPV Power Plants installed at CATC Prayagraj .Note: Staff required to be arranged by the agency for the operation of 300KW solar power plant shall be as per scope of work, i.e., One Engineer cum administrative in charge for all days excluding Sunday & National Holidays.CMC for 3rd Year.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .