Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 CrAccepted-AOC NULL | L1 | Accepted-AOC As per financial evaluation | |
| 2 | L2₹28.3 Cr+₹3.2 Cr (12.5%)Rejected-AOC | L2 | Rejected-AOC As per financial evaluation | |
| 3 | L3₹28.7 Cr+₹3.5 Cr (13.8%)Rejected-Finance | L3 | Rejected-Finance as per financial evaluation | |
| 4 | L4₹28.8 Cr+₹3.6 Cr (14.5%)Rejected-Finance 7C GOVIND NAGAR MATHURA | MATHURA | L4 | Rejected-Finance as per financial evaluation | |
| 5 | L5₹32.9 Cr+₹7.7 Cr (30.8%)Rejected-Finance SHRI RAM VILA UDAI SINGH JAIN RAOD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L5 | Rejected-Finance as per financial evaluation |
| Sl No | Description | Qty | Unit | M/S AMIT TRADERS L5 | SRS EXPRESS PRIVATE LIMITED L7 | M/s Akash Deep Construction Compnay L4 | Krishna Infratec L1 | M/s Hanu Infrastructure Pvt Ltd L8 | BALAJI Construction L6 | SHREE RAM STONE SUPPLIERS PRIVATE LIMITED L2 | M/S JAI BUILDERS L3 | SHIV KANT INFRATECH PVT. LTD. L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 36,984 | CUM | 50 ₹18,49,200 | 55 ₹20,34,120 | 40 ₹14,79,360 | 50 ₹18,49,200 | 50 ₹18,49,200 | 40 ₹14,79,360 | 25 ₹9,24,600 Lowest | 35 ₹12,94,440 | 50 ₹18,49,200 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 37,253 | cum | 100 ₹37,25,300 | 120 ₹44,70,360 | 40 ₹14,90,120 | 70 ₹26,07,710 | 118 ₹43,95,854 | 50 ₹18,62,650 | 90 ₹33,52,770 | 25 ₹9,31,325 Lowest | 115 ₹42,84,095 |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Compaction Only) | 36,984 | CUM | 60 ₹22,19,040 | 60 ₹22,19,040 | 40 ₹14,79,360 | 60 ₹22,19,040 | 60 ₹22,19,040 | 30 ₹11,09,520 | 20 ₹7,39,680 Lowest | 25 ₹9,24,600 | 65 ₹24,03,960 |
| 4.00 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. | 17,150 | Cum | 3,500 ₹6,00,25,000 | 3,600 ₹6,17,40,000 | 3,100 ₹5,31,65,000 | 2,500 ₹4,28,75,000 Lowest | 3,830 ₹6,56,84,500 | 3,650 ₹6,25,97,500 | 3,000 ₹5,14,50,000 | 3,300 ₹5,65,95,000 | 3,830 ₹6,56,84,500 |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 9,400 | Cum | 3,700 ₹3,47,80,000 | 4,000 ₹3,76,00,000 | 3,200 ₹3,00,80,000 | 2,600 ₹2,44,40,000 Lowest | 3,995 ₹3,75,53,000 | 3,750 ₹3,52,50,000 | 3,100 ₹2,91,40,000 | 3,400 ₹3,19,60,000 | 4,000 ₹3,76,00,000 |
| 6.00 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 43,090 | Sqm | 42 ₹18,09,780 | 45 ₹19,39,050 | 25 ₹10,77,250 | 20 ₹8,61,800 | 35 ₹15,08,150 | 33 ₹14,21,970 | 18 ₹7,75,620 Lowest | 20 ₹8,61,800 | 36 ₹15,51,240 |
| 7.00 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,00,560 | Sqm | 15 ₹15,08,400 | 10 ₹10,05,600 | 10 ₹10,05,600 | 10 ₹10,05,600 | 10 ₹10,05,600 | 12 ₹12,06,720 | 8 ₹8,04,480 Lowest | 10 ₹10,05,600 | 12 ₹12,06,720 |
| 8.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a Mechanical Paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 3,725 | Cum | 9,200 ₹3,42,70,000 | 9,600 ₹3,57,60,000 | 8,700 ₹3,24,07,500 | 8,000 ₹2,98,00,000 Lowest | 9,350 ₹3,48,28,750 | 9,800 ₹3,65,05,000 | 9,000 ₹3,35,25,000 | 8,000 ₹2,98,00,000 Lowest | 9,400 ₹3,50,15,000 |
| 9.00 | Providing and laying dense graded bituminous macadam with bitumen-30 with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. in two layers. | 9,847 | Cum | 9,700 ₹9,55,15,900 | 9,900 ₹9,74,85,300 | 9,300 ₹9,15,77,100 | 8,000 ₹7,87,76,000 Lowest | 9,957 ₹9,80,46,579 | 10,500 ₹10,33,93,500 | 9,100 ₹8,96,07,700 | 9,000 ₹8,86,23,000 | 9,950 ₹9,79,77,650 |
| 10.00 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,43,664 | Sqm | 15 ₹21,54,960 | 10 ₹14,36,640 | 10 ₹14,36,640 | 10 ₹14,36,640 | 10 ₹14,36,640 | 11 ₹15,80,304 | 8 ₹11,49,312 Lowest | 10 ₹14,36,640 | 10 ₹14,36,640 |
Tender Value
₹34.2 Cr
EMD Value
₹50 L
Closing Date
20 Mar 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
office of the SE, AC, PWD, Aligarh
as per BoQ Attached
2026_CEALG_1122143_1
782/Cashier(PDK)-AC/25-26 Dt 28-02-2026
Open Tender
Civil Works - Roads
Item Rate
365 days
Distt-Kasganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹50 L
office of the SE, AC, PWD, Aligarh
16 May 2026
6 Mar 2026
20 Mar 2026
6 Mar 2026
20 Mar 2026
6 Mar 2026
6 Mar 2026 - 20 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 36,984 | CUM | - | - |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 37,253 | cum | - | - |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Compaction Only) | 36,984 | CUM | - | - |
| 4 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. | 17,150 | Cum | - | - |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 9,400 | Cum | - | - |
| 6 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 43,090 | Sqm | - | - |
| 7 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,00,560 | Sqm | - | - |
| 8 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a Mechanical Paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 3,725 | Cum | - | - |
| 9 | Providing and laying dense graded bituminous macadam with bitumen-30 with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. in two layers. | 9,847 | Cum | - | - |
| 10 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,43,664 | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.95 MB
BOQ_2089204.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .