Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC ROOM NO 01 1ST FLOOR SIMA TRADING BUILDING SURVEY NO 268 GARACHARMA VILL SRI VIJAY PURAM 744105 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | ₹18.3 L Quoted ₹18.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹20.0 L+₹1.1 L (5.92%)Rejected-AOC | ₹20.0 L+₹1.1 L (5.92%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹20.3 L+₹1.4 L (7.55%)Rejected-AOC 365 B 10 HENRY COMPLEX MATHIYAS NAGAR KP ROAD NAGERCOIL KANNIYAKUMARI DISTRICT 629001 | KANNIYAKUMARI | TAMIL NADU | 629001 | ₹20.3 L+₹1.4 L (7.55%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹21.0 L+₹2.1 L (11.0%)Rejected-AOC | ₹21.0 L+₹2.1 L (11.0%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹21.7 L+₹2.8 L (15.0%)Rejected-AOC OPP MARUTI SERVICE CENTRE SARACHARMA POST SRI VIJAYA PURAM 744 105 | SRI VIJAYA PURAM | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | ₹21.7 L+₹2.8 L (15.0%) | L5 | Rejected-AOC Rejected |
Tender Value
₹17 L
EMD Value
₹34,000
Closing Date
11 Mar 2022, 6:00 pmClosed
GE (I) Campbell Bay
GE (I) Campbell Bay, Army Land, Campbell Bay, Great Nicobar-744302
PROVIDING SERVICES FOR OPERATION OF DG SETS AT ELECT SUPPLY INSTALLATIONS AND ALLIED WORKS AT INS KARDIP AND REPAIR/ REPLACEMENT OF EE LED FITTINGS INCLUDING INTERNAL WIRING/ DISTRIBUTION BOXES AND REPAIRS TO COOLING APPLIANCES AND ITS CONNECTED E/M
2022_MES_509170_1
8801/E8
Open Tender
Civil Works
Item Rate
330 days
GE (I) Campbell Bay
Please refer Tender Documents
8 documents required · 8 mandatory
₹500
Yes
GE (I) Campbell Bay
₹34,000
22 Jun 2022
19 Feb 2022
14 Mar 2022
19 Feb 2022
11 Mar 2022
4 Mar 2022
Amount
Providing Services for Manning, Running & daily operation of Main Receiving station (HT/LT) located at INS Kardip Sub Station by deploying One Electrician Skilled in each shift round the clock in three shift per day (8 Hours per shift), including Sundays & holidays, Maintaining the Log sheet/ Register for Incoming & out Going feeders as directed & shown by Engr-In-charge and also attending break downs/ repairs on break down complaint calls of HT & LT lines in the area and rectifying the problems by replacing DO fuses and HT jumpers etc and restore the electric supply in area with necessary arrangements, if required for change over of HT ring main supply etc consisting of following :- Details of Plant:- (a) Main supply at 11 KV - 01 Nos Receiving Point from AED (b) Step Down Transformer 11 / 0.433 KV - 01 Nos : 01 No 315 KVA Near Old Power House 01 No 100 KVA Near BRO (c) Step Up Transformer 0.433 / 11 KV - 01 Nos : 01 No 500 KVA in Sub-Station(d) Incomer through Two Pole Structure 11 KV 200 amps -- 04 No(e) VCB 400 Amps - 03 Nos (f) RMU - 02 Nos(g) Synchronize Panel - 01 No(h) Out going feeders - 02 Nos (j) DG Set - 03 Nos : 01 No in Sub-Station - 250 KVA 02 No in Sub-Station - 125 KVA
(C) Note for item no.1 Above: (i) All log sheets to be maintained during each shift and details of consumables used to be maintained on each plant running record book. (ii) Records for running hours and fuel consumed to be maintained daily on log sheet and plant running record for DG set. (iii)The contractor shall operate and maintain all the T&P installed under this work at no extra cost. (iv)Incase of non operation the plant on account of contractor's fault/ non employment of operators, suitable market recovery per shift shall be recoverd from contractor's dues. (v)Any tradesmen/ employees shall not be allowed to continue their employment more than 11 month. (vi)Misc spares required such as tinted copper fuse wire, discharge rod, cotton,cleaning agents & misc items deemed to be included in the quoted rate. (vii)Monitoring the performance of plant & uploading of records & submission. (viii)Daily check of HT/LT Substation/ switch gears. (ix)Careful control on the plant/machinery and maintaining clean and Hygienic condition.(x)Area cleaning and Maintenance of plant/machinery premises. (xi)Maintenance of all records and documents as specified and directed by Engr-incharge.(xii) Checking of earth values of earth pits and filling of water in earth pits in substation. (xiii) SHIFT DUTIES (TIMMINGS) (a) I Shift : 0600 Hours to 1400 Hours (b) II Shift : 1400 Hours to 2200 Hours (c) III Shift : 2200 Hours to 0600 Hours (Note :– 01 Operator per shift total three shifts – 03 Operators (Electrician)
(xviii) Technician/employees employed by the contractor will not work contineously for 07 days. The employees worked for six days contineously should be given one day off with payment as per the contract labour act as referred in condition 58 of IAFW-2249. (xiv) The contractor is responsible for submitting the documents of qualification / experience certificate & police verification certificate of employees before commencement of work.(xx) The rate considered is deemed to include for 1st hour maintenance including cleaning and replacement of minor spare parts of unserviceable parts and when required.(xxi) The rate considered is deemed to include the cost towards maintenance of hygienic condition and around the installation. The contractor is fully responsible towards the health of staff employed.(xxii)In case of requirement, tradesmen provided per one area may be utilized in other areas at the discretion of the department without any extra cost to department as directed by Engineer-in-Charge. (xxiii)Attendance register shall be maintained by contractor and it shall be submitted by contractor to the dept for verification.(xxiv)In case of absence operator, double the rate quoted to be recovered.(xxv)Departmental equipments of each building /installations shall be under safe custody. In case of theft any item recovery shall be made from the contractor as per direction of Engr-in-Charge.(xxvi)During operation of installations/equipments/tree trimming respective electrical power lines/Electrical panels/DG Sets equipments should be isolated properly,necessary safety measurments(like helmet,belt, insulation glouves etc..),necessary safety precautions /safety devices to be adopted and the quoted rate is deemed to be included for same & in case any eventuality during their working time to tradesmen/Operators, the contractor is fully responsible.
(xxvii)The contractor will adhere to pay monthly payment cycle to the employees irrespective of RAR/Funds availability with department and same deemed to be included in quoted rates. (xxviii) Shift operator shall be relived after next shift operator arriving the installations necessary arrangments to be monitored by contactor/contactor's Rep(other than genaral shifts). (xxix)Shift timings & operation of intstallations shall be as directed by Engr-in-Charge. (xxx)Each employee should be facilitated with adhoc bonus privilage as applicable in accordance with Govt Of India and the same to be deemed to be included in the quoted rate.Documentry proof of duly signed by contarctor/contractor's rep and individual to be forwaded.
Taking down old unserviceable point wiring, (light, fan, socket or power) complete including fittings & fixtures such as switch, ceiling rose, pendants, regulator, socket, etc., and making good the disturbed surface of wall, floors, ceiling etc to match with the existing including touch up of paint/white wash all as specified and directed by Engineer- in-charge.
M & L for Point wiring with 1.5 Sq mm copper conductor multistranded FRLS PVC insulated unsheathed 1100 Volts multistranded drawn through and including rigid PVC caping and casing surface type and accessories of suitable size ISI marked and terminal boxes of 1.6 mm thick of suitable size including fixing/grouting sunken/ surface as per site requirement incl provision of modular cover plates for mounting the switches / sockets/ regulators etc including running up of 1.5 Sq mm multistranded copper conductor flame retardant PVC insulated cable as earth continuity conductor along with wiring and connecting to the common earth dolly all as specified for : Make of Wires : Polycab / Havells / Finolex or equivalent Make of Casing Caping : Modi / Prince / Sudhakar / Prestoplast or equivalent (a) One light point controlled by one, one way switch 5 Amps
(b) One Ceiling Fan / exhaust fan point controlled by one, one way switch and regulator
(c) One 3 pin 5 Amps switch socket outlet point controlled by one switch on independent board .
Description all as per item No 8 here in before but using 2.5 sq mm single core copper conductor cable of multistranded FRLS PVC insulated unsheathed 1100 volts grade for 5/15 amps switch socket cobmination point incl running of 1.5 sq mm copper conductor flame retardant PVC wire as earth continuity conductor along with wiring and connecting to the common eath dolly. Make of Wires : Polycab / Havells / Finolex or equivalent Make of Casing Caping : Modi / Prince / Sudhakar / Prestoplast or equivalent
S&F in repairs flush type piano switch one way 5 A
S&F in repairs flush type piano switch socket combined one way 5 A
S&F in repairs flush type piano socket, 5A/15A - 2/3 pin combined with neon indicator
S & F ceiling fan regulator step type, heavy duty suitable to work on 230 volts Ac supply complete all as specified.
S & F ceiling rose three terminal surface bakelite type AC 50 Hz 230 volts of size 65 x 50 mm complete all as specified.
Material and labour for submain wiring with single core PVC insulated FRLS multistranded copper conductor cable of size 2 x 4.0 Sqmm drawing into and including rigid non metallic PVC conduit, medium grade not less than 20mm dia ISI marked ivory colour with all conduit fittings and fixing accessories and 4.0 Sqmm FRLS multistranded copper conductor cable as continuous earth wire incl taking out old wire complete as directed by Engr in Charge Make of Wires : Polycab / Havells / Finolex or equivalent Make of Conduit & its accessories : Modi / Prince / Sudhakar / Prestoplast or equivalent
M&L for SPN enclosure with two pin and earth plug and socket with 240 volts 20 Amp SPN MCB including removal old unsv one complete all as specified .Make : L&T / Legrand / Havells or equivalent
S & F in replacement sheet metal enclosure MCB DB SPN 4 way with 200 Amps rated bus bar 240 volts double door with magnitic locking system including refixing / fixing of incomming & outgoing MCBs and making smooth the wall surfaces complete all as specified.Make : L&T / Legrand / Havells or equivalent
S & F in replacement sheet metal enclosure MCB DB SPN 8 way with 200 Amps rated bus bar 240 volts double door with magnitic locking system including refixing / fixing of incomming & outgoing MCBs and making smooth the wall surfaces complete all as specified. Make : L&T / Legrand / Havells or equivalent.Note for Item No 15 to 18:- (i) New MCBs if required for replacement shall be measured and paid seperately under appropriate item as ''Supply only'' (s) of this schedule. However labour element involved in replacement is included in unit rate quoted against this Item. (ii) Rates for refixing old serviceable MCBs are deemed to be inclusive in above quoted rates
Supply only MCBs of following rating (a) MCB SP 6 to 32 Amps 240V 10 KA. "C" Series Make : L&T / Legrand / Havells or equivalent
(b) MCB DP 32-40 Amps 415V 16 KA. "C" Series Make : L&T / Legrand / Havells or equivalent Note:- MCBs / MCCBs will have to suite upon with the base of the existing Panel / DB as per site requirement
S & F in repairs switch piano single pole flush type 5 amps, 230 volts including removal old existing unsv one complete all as specified and directed.
S & F in repairs socket combination flush type multipurpose 2/3 pin 5 amps 2 in 1, 230 Volts all as specified including removal old existing unsv one complete all as specified and directed.
S & F in repairs switch socket combination 2 in 1 multipurpose 3/5 pin 5/15 amps flush type including removal old existing unsv one complete all as specified and directed.
S & F ceiling fan regulator step type in repairs, heavy duty suitable to work on 230 volts Ac supply complete all as specified.
S & F wall mounted LED 18/20 watts with out put of 1800 lumens , box type (decorative) light fitting, 230 volts with extruded aluminium heat sink provided for efficient heat dissipation and intregrated electronic driver connector block etc complete with all accessories internally pre wired and necessary mounting arrangements, provision of new 3 core multistranded copper conductor of size 23/0.193 from ceiling rose to fitting including LED tube 4' x 18 watts including removal old existing unsv tube light fitting complete all as specified and as directed.Make :- Bajaj, Philips, Wipro, Havells, Syska, Jaguar,Lukar
S & F Surface mounting 10 Watt LED Luminaries with epoxy white powder coated CRCA sheet steel housing with reeded translucent acrylic diffuser and 1 x 10 Watt LED fitting including taking down old unserviceable fittings any type complete all as specified and as directed . Make : Phillips , Bajaj, Wipro,Lukar
Taking out the existing any type fittings on ceilings and S & F 36 Watt LED Luminaire suitable for 600x600mm modular ceiling grid including frame of suitable size of above LED light with high efficiency PMMA diffuser gives soft glare free light with available lumen output from 3600 total lumen.The 36 W system shall be operating at 220-240v AC supply having internal driver .IP20,surge protection 2KV ,ambient temperature -20 to 45 degree C, frequency 50 to 60 Hz ,The system efficacy must be between80-100 lumen /watt ,with 70% lumen maintenance upto 50000 Br Hrs with uniform visually comfortable light output at 150 degree beam spread , CRI minimum 80. PF should be greater than 0.95 , THD < 10% . Indivisual LED's should not be visible for glare free output ,colour temperature 6500k all as directed. Make :- Bajaj, Philips, Wipro, Havells, Syska, Jaguar,Lukar
Taking down the ceiling / Exhaust fans of any model, size & sweep carefully from its original position and dismantling motor and over hauling complete by cleaning all dust / grease with kerosene or petrol, & replacement of unserviceable bearings, bushes, split pins and nut and bolts and applying new grease for bearings, reassembling the motor and fixing the blades, preparation old surfaces of fan of any sweep & model and painting the with synthetic enamelled paint by spraying including filling cavities and testing and refixing the same complete as directed by Engr in Charge, Note for Item (i). Any Parts required for replacement shall be measured and paid seperately under appropriate item as ''Supply only'' (s) of this schedule. However labour element involved in replacement is included in unit rate quoted against this Item. (ii). Any unforeseen minor repair and minor parts like Rubber bush, MS Clamps, split pins, base frames, nuts, bolts etc that are not covered under Item No-2, (a) to (e) but required to complete the repair work / smooth functioning of Fan Motor shall be deemed to be included with the unit rate .Transportation of Stator / Rotor parts for machining & rewinding, shaft / bushing for machining , welding , turning at lathe shop at Port Blair are also deemed to be included with unit rate. iii). Rewinding of stator / rotor of motor, any machine work where involved shall be measured and paid separetely against relevant item of this schedule.
Supply only following spares of ceiling / exhaust fan of any model, size & sweep to incorporate against each Item of Schedule 'A' here-in-above complete all as specifed & directed (a) Supply only ball bearing suitable for ceiling fan upto 1400 mm sweep
(b) Supply only ball bearing suitable for Exhuast fan upto 450 mm sweep
(c) Supply only Gun metal bush for Ceiling fan and exhaust fan
(d) M&L for rewinding the motor of ceiling Fan 1200mm/1400mm Sweep by unscrewing without damaging any parts, rewinding the same with fine quality of super enamelled copper winding wire of suitable size & Capacity including,varnishing,drying etc,and refixing the stator and rotor perfectly to rotate smoothly and connection alongwith fixing of 2.5 MFD fan capacitor complete including taking out burned unserviceable copper winding wire all as directed.
(e) M&L for rewinding the motor of Exhaust Fan 300 / 450 mm Sweep by unscrewing without damaging any parts, rewinding the same with fine quality of super enamelled copper winding wire of suitable size & Capacity including,varnishing,drying etc,and refixing the stator and rotor perfectly to rotate smoothly and connection alongwith fixing of suitable fan capacitor complete including taking out burned unserviceable copper winding wire all as directed.Note for item (d) & (e):- Rates for incorporation of new fan capacitor of suitable capacities for smooth runinng of fans are deemed to be inclusive in the quoted rates
Supply and Fix in repairs capacitor 2.5 MFD capacity including removal of unserviceable ones complete all as specified and directed.Make : Tibcon, Bajaj, Epcos or equivalent
Supply and Fix in repairs capacitor 4 MFD capacity including removal of unserviceable ones complete all as specified and directed.Make : Tibcon, Bajaj, Epcos or equivalent
M & L for Taking out & Servicing Split type air conditioner in citu (Split type air conditioner comprises wiith out door and indoor unit complete) of capacity 1.5/ 2.0 TR of any make and any type by replacing unserviceable parts from the machine including charging of Refrigerant gas after vacuuming and leak testing. Brazing the suction/ discharge tubes where required and cleaning of cooling coil and condenser coil, oiling, greasing of blower motor, checking of electrical circuit and replacement of defective electric blower fan motor,over load protector,relay, capacitor etc to achive proper cooling effect and also checking of electronic circuit of machine and repair where necessory by replacing electronic parts and changing of wirings with proper size PVC insulated wires as directed and testing commissioning & refixing in same or new location complete all as specified and directed. Note:- i) Compressor where ever is required shall be measured and paid separately under respective item. ii) During vacuming the machine existing Refrigerant shall be collected in cylinder and the same shall be reused while charging after carry out of repair and additional qty required for smooth functioning shall be measured and paid separately under respective item. iii) Spares parts where ever is required shall be measured and paid separately under respective item of schedule A. iv) Unit rate is deem to be included for minor parts such as capilary tube, machine screw, washer, rubber bush etc required for proper setting of machine. (v) Unit rate is deem to be included for necessary opening in window / wall of any type and thickness, cutting of grill any type / size fixing of AC & necessary plywood, commerical type, 6 mm thick of suitable size as packing material to cover the hole/ window (vi) Transportation for shifting of AC's will be provided by contractor and rate for same is deemed to be included in quoted rate.
Supply only running capacitor 45 MFD and complete all as specified and directed.
Supply only starting capacitor 100/120 MFD complete and complete all as specified and directed.
S & F for copper tubing of following sizes for suction / discharge line of any make split AC of capacity 1.5 ton with rubber insulation of pipe tube type insulation including removal of old existing unsv one complete all as specified and directed. (a) 3/8" size
(b) 5/8” size
(c) 1/4" size
(d) 1/2" size
Supply only universal remote suitable for the existing model AC's including 02 Nos of batteries complete all as directed
S & F for indoor unit split type air conditioner 1.5 ton capacity wall mounted operation on 230 volts + 10% 50 HZ single phase performing on cooling, dehumidifying, cord less, remote and digital temp display system of make as per existing including removal of old existing unsv one complete all as specified and directed.
Taking down existing unserviceable outdoor unit and supply and fix new outdoor unit for 1.5 TR capacity Split AC working with non CFC refrgerent gas with blower motor fan, cooling coil all pre-wired but with compressor of make as per existing complete all as specified and directed.
S & F for flexible PVC/hose pipe 20 mm dia heavy duty from outdoor unit including removal of old existing unsv one complete all as specified and directed.
Material & labour for filling up & charging of R - 22 refrigerant or type of gas as per site requirement for window/spilt type air conditioner of capacity 1.5TR, refrigerator and water cooler of capacity 80/40 litres after leak testing of complete system and making good by bracing complete all as specified and directed.
S & F for PCB (Printed circuit board) of indoor unit suitable for existing 1.5 ton capacity split AC including removal of old existing unsv one complete all as specified and directed.
S & F for thermostat switch of any make of split AC 1.5 ton capacity including removal of old existing unsv one complete all as specified and directed.
Removing the old unserviceable sealed compressor unit from split AC of any make, capacity 1.5 TR and supply and fixing new hermetically sealed compressor of same make as that of the existing for split AC of capacity 1.5 TR with necessary mounting arrangements suitable for working with non CFC refrigerent including charging of non CFC refrigerent gas and oil at adequate level and jointing all pipe connection and checking gas pressure complete all as specified and directed.
Dismantling and taking out old unserviceable Earthing and M&L for earthing with galvanised steel earth plate electrode 60cmX60cmX6mm burried earth pit not less than 2.25m depth below normal ground level with to edge of the plate vertically to depth of not less than 1.5 m below ground level connected to & including Galvanised earth strip of size 25X4mm by mean of GI bolts & nuts etc with provision of char-coal and salt etc all as per electrical plate No-3 of SSR-2010 including RCC cover and MS angle iron frame, watering with GI pipe 20 mm dia (medium grade) & MS funnel, concrete pit including excavation and earthwork and testing on completion etc. complete all as specified and directed by Engineer-in-charge. Note : 1. Refilling of the earth pit shall be carried out with black cotton soil. 2. GI wire 4.0mm dia & GI protection pipe upto 7.5 m length will be measured under this item.
NOTE : An Amount of Rs 57,245.00 towards Schedule of Credit shall be deducted to arrive the Contract Sum
A N KUMAR
M/s Power Engineering Co
A.G.Construction
M/s Ramesh Lal
Govinda Swamy Construction
DEEPAK AGENCIES
M/s Bismi Builders & Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .