| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.0 LAccepted-AOC | ₹80.0 L | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹80.1 LRejected-Finance UTTAR PRADESH UP | AYODHYA | UTTAR PRADESH | 224001 | ₹80.1 L | L2 | Rejected-Finance Due to L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | S.B. ENTERPRISES L1 | MS SHREYA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | E/W in Excavation for Escape work in all lead & lift for all type of soil including all cost of labour ,T&P & all taxes for completion of work. | 886 | M3 | 96 ₹85,056 | 80 ₹70,880 |
| 2.00 | Excavation of rock other than granite or quartzite by controlled blasting removing muck and stacking including cost of all material, labour t&p shuttering and curing etc required for completion of work as per specification | 119 | M3 | 506 ₹60,214 | 451 ₹53,669 |
| 3.00 | Supply and Laying C.C. in 1:3:6 for foundation of Wing Wall With all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work. | 206 | M3 | 4,886 ₹10.1 L | 4,951 ₹10.2 L |
| 4.00 | Supply and Laying C.C. in 1:1.5:3 for foundation of Wing Wall With all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work. | 373 | M3 | 7,386 ₹27.5 L | 7,100 ₹26.5 L |
| 5.00 | C.R. Stone Masonary in 1:3 Cement Mortor With all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work. | 404 | M3 | 4,186 ₹16.9 L | 4,200 ₹17.0 L |
| 6.00 | Plaster on Stone Masonary in 1:4 cement Mortar With all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work. | 423 | M² | 186 ₹78,678 | 180 ₹76,140 |
| 7.00 | S/L Stone Boulder Pitching all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work. | 279 | M3 | 1,986 ₹5.5 L | 1,700 ₹4.7 L |
| 8.00 | E/W in Filling Wing Wall With lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work. | 3,730 | M3 | 106 ₹4.0 L | 131 ₹4.9 L |
| 9.00 | Suppling and Laying Reinforcement Fe 415 incluiding cutting ,bending etc. including all cost of labour, matterial, T&P required for proper copletion of work. | 0.46 | MT | 88,086 ₹40,519.56 | 85,000 ₹39,100 |
| 10.00 | Supply and Spreading moorum with all cost of material labour T&P etc. required for proper completion of the work. | 960 | M3 | 1,386 ₹13.3 L | 1,500 ₹14.4 L |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
3 Mar 2026, 2:00 pmClosed
SE IWC MIRZAPUR
OFFICE OF SE IWC IRRIGATION COLONY FATHA,MIRZAPUR
Costruction of Escape and Spreading Moorum top of bundhi From ch. Km. 0.060 to km. 2.060 of Narso Bundhi.
2026_UPIDC_1119659_1
09/SE/2025-26
Open Tender
Civil Works - Water Works
90 days
SILTHAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.7 L
24 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
E/W in Excavation for Escape work in all lead & lift for all type of soil including all cost of labour ,T&P & all taxes for completion of work.
Excavation of rock other than granite or quartzite by controlled blasting removing muck and stacking including cost of all material, labour t&p shuttering and curing etc required for completion of work as per specification
Supply and Laying C.C. in 1:3:6 for foundation of Wing Wall With all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work.
Supply and Laying C.C. in 1:1.5:3 for foundation of Wing Wall With all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work.
C.R. Stone Masonary in 1:3 Cement Mortor With all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work.
Plaster on Stone Masonary in 1:4 cement Mortar With all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work.
S/L Stone Boulder Pitching all lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work.
E/W in Filling Wing Wall With lead and Lift including all Cost of Materials, Labour, T&P &all taxes etc. Required for proper Completion of Work.
Suppling and Laying Reinforcement Fe 415 incluiding cutting ,bending etc. including all cost of labour, matterial, T&P required for proper copletion of work.
Supply and Spreading moorum with all cost of material labour T&P etc. required for proper completion of the work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
BOQ_2082146.xls
BOQ • 0.38 MB
TDLNIT09LOT012025-26.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid