Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-Finance | L1 | Accepted-Finance LOWEST BIDDER IS ACCEPTED | |
| 2 | L2₹32.2 L+₹60,335.72 (1.91%)Rejected-Finance | L2 | Rejected-Finance 2ND LOWEST BIDDER IS REJECTED | |
| 3 | L3₹32.5 L+₹88,450.27 (2.80%)Rejected-Finance | L3 | Rejected-Finance 3RD LOWEST BIDDER IS REJECTED |
Tender Value
₹31.6 L
EMD Value
₹63,179
Closing Date
15 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER HOOGHLY DIVISION PHE DTE
HOOGHLY STATION ROAD, RABINDRANAGAR, HOOGHLY
Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W AND Distribution
2024_PHED_648397_8
WBPHE/EE/45/HUG/2023-24
Open Tender
CIVIL WORKS
Percentage
60 days
HOOGHLY DIVISION PHE DTE
Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W AND Distribution
2 documents required · 2 mandatory
₹63,179
Yes
4 Mar 2024
17 Jan 2024
19 Feb 2024
17 Jan 2024
15 Feb 2024
17 Jan 2024
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .