Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹10.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.5 L+₹85,933.25 (8.10%)Admitted-Fee/PreQual/Technical/Finance NO 305 1 NEW COLONY 2ND STREET VALLAM POST CHENGALPET 603 002 | CHENGALPET | CHENGALPET | TAMIL NADU | 603002 | ₹11.5 L+₹85,933.25 (8.10%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.8 L+₹1.2 L (11.5%)Admitted-Fee/PreQual/Technical/Finance | ₹11.8 L+₹1.2 L (11.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.1 L+₹1.5 L (13.9%)Admitted-Fee/PreQual/Technical/Finance NO 71 1 7TH STREET PARVATHI AVENUE SAKTHI NAGAR PORUR CHENNAI 600 116 | CHENNAI | CHENNAI | TAMIL NADU | 600116 | ₹12.1 L+₹1.5 L (13.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹12.3 L+₹1.7 L (15.8%)Admitted-Fee/PreQual/Technical/Finance | ₹12.3 L+₹1.7 L (15.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | K. THIYAGARAJAN L2 | M.RAMARAJ L4 | S.R.L ENTERPRISES L5 | E SAKTHIVEL L1 | SIVAGNANAM L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of open Well at Ponmar panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .4/2026-27 scheme of Unauthorised scheme | ||||||||
| 2.00 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Hard Clay, Stiff black cotton soil, Hard red earth, Shales, Murram, Gravel, Stoney earth, and earth mixed with small size boulders etc 1st depth | 157.14 | Cum | 130 ₹20,428.2 Lowest | 130 ₹20,428.2 Lowest | 131 ₹20,585.34 | 131 ₹20,585.34 | 138 ₹21,685.32 |
| 3.00 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Soft disintegrated rock, laterite, Soft rock or Kankar not requiring blastering etc complete. 2nd depth 2.00-4.00m | 127.29 | Cum | 400 ₹50,916 Lowest | 400 ₹50,916 Lowest | 405 ₹51,552.45 | 402 ₹51,170.58 | 400 ₹50,916 Lowest |
| 4.00 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock not requiring blasting etc complete. 3rd depth 4.00-6.00m | 127.29 | Sqm | 950 ₹1,20,925.5 | 950 ₹1,20,925.5 | 950 ₹1,20,925.5 | 850 ₹1,08,196.5 Lowest | 900 ₹1,14,561 |
| 5.00 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 4th depth 6.00-8.00m | 56.27 | Cum | 1,900 ₹1,06,913 | 1,900 ₹1,06,913 | 1,951 ₹1,09,782.77 | 1,700 ₹95,659 Lowest | 1,900 ₹1,06,913 |
| 6.00 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 5th depth -8.00-10.00m | 56.57 | Cum | 2,300 ₹1,30,111 | 2,400 ₹1,35,768 | 2,400 ₹1,35,768 | 1,800 ₹1,01,826 Lowest | 2,400 ₹1,35,768 |
| 7.00 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 6th depth 10.00-12.00m | 50.91 | Cum | 2,090 ₹1,06,401.9 Lowest | 2,800 ₹1,42,548 | 2,900 ₹1,47,639 | 2,500 ₹1,27,275 | 2,900 ₹1,47,639 |
| 8.00 | CC1:4:8 using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc complete | 2.58 | Cum | 5,000 ₹12,900 Lowest | 5,300 ₹13,674 | 5,356 ₹13,818.48 | 5,356 ₹13,818.48 | 5,000 ₹12,900 Lowest |
| 9.00 | Centring charges for all R.C.C. works including cost and conveyance and al other labour charges etc complete. | 40.45 | Sqm | 500 ₹20,225 Lowest | 500 ₹20,225 Lowest | 547 ₹22,126.15 | 547 ₹22,126.15 | 520 ₹21,034 |
| 10.00 | Supplying and fabrication of Mild steel including cost and conveyance and all other labour charges etc complete. | 0.91 | MT | 80,000 ₹72,400 Lowest | 80,000 ₹72,400 Lowest | 91,000 ₹82,355 | 91,000 ₹82,355 | 91,000 ₹82,355 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
24 Aug 2026, 3:00 pmClosed
Block Developement Officer VP Thiruporur
Block Developement Office Thiruporur
Construction of Open Well in Ponmar Panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026 - 2027 having Package No . 4/2026- 2027
2026_RDTN_691858_1
RCNO 186/2026/A3/ dt 24.7.2026
Open Tender
Civil Works - Water Works
Item Rate
Ponmar
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹15,000
Yes
Block Developement Office Thiruporur
3 Sept 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of open Well at Ponmar panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .4/2026-27 scheme of Unauthorised scheme | - | - | - | - |
| 2 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Hard Clay, Stiff black cotton soil, Hard red earth, Shales, Murram, Gravel, Stoney earth, and earth mixed with small size boulders etc 1st depth | 157.14 | Cum | - | - |
| 3 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Soft disintegrated rock, laterite, Soft rock or Kankar not requiring blastering etc complete. 2nd depth 2.00-4.00m | 127.29 | Cum | - | - |
| 4 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock not requiring blasting etc complete. 3rd depth 4.00-6.00m | 127.29 | Sqm | - | - |
| 5 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 4th depth 6.00-8.00m | - | Cum | - | - |
| 6 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 5th depth -8.00-10.00m | - | Cum | - | - |
| 7 | Earth work Open Well excavation complying with relevant clauses of T.N.D.S.S. Well sinking and with alead upto 10.00M in Medium rockand Dence Medium rock requiring blasting etc complete. 6th depth 10.00-12.00m | 1 | Cum | - | - |
| 8 | CC1:4:8 using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc complete | - | Cum | - | - |
| 9 | Centring charges for all R.C.C. works including cost and conveyance and al other labour charges etc complete. | - | Sqm | - | - |
| 10 | Supplying and fabrication of Mild steel including cost and conveyance and all other labour charges etc complete. | - | MT | - | - |
stage.html
html • 0.02 MB
finance_831971.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_831971.xls
BOQ • 0.32 MB
Technical.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .